Applicants are encouraged to schedule a preapplication meeting
to review the overall stormwater management concept with municipal
staff/engineer. The preapplication meeting is not mandatory and shall
not constitute formal filing of a plan with the municipality. Topics
discussed may include the following;
A. Available geological maps, plans and other available data.
B. Findings of the site analysis, including identification of any environmentally
sensitive areas, wellhead protection areas, riparian corridors, hydrologic
soil groups, existing natural drainageways, karst features, areas
conducive to infiltration to be utilized for volume control, etc.
C. Results of infiltration tests.
D. Applicable Subdivision and Land Development and/or Zoning Ordinance
provisions.
E. The conceptual project layout, including proposed structural and
nonstructural BMPs.
Approval of a SWM site plan shall be valid for a period not to exceed five years. This time period shall commence on the date that the municipality approves the SWM site plan. If a certificate of completion as required by §
106-508 of this chapter has not been submitted within the specified time period, then the municipality may consider the SWM site plan disapproved and may revoke any and all permits issued by the municipality. SWM site plans that are considered disapproved by the municipality may be resubmitted in accordance with §
106-504 of this chapter.