Category
(cubic feet)
|
Usage
(cubic feet)
|
Rate
|
---|---|---|
0 to 1,400
|
First 1,400
|
$50 minimum
|
1,401 to 8,000
|
Next 6,600
|
$2.75 per 100 cu/ft
|
Over 8,001
|
All other usage
|
$3.75 per 100 cu/ft
|
Final read charge
|
$30
| |
Damaged facilities
|
Cost of repair
| |
Turn-on/off
|
$75
| |
Hydrant rental
|
$100
| |
Fire flow test fee
|
$100 per test
| |
Meter testing fee:
| ||
Meters over 1"
|
$60 per hour
| |
Meters 5/8" to 1"
|
$60 flat fee
| |
Connection fee
|
$400
| |
Tapping fee
|
$100
| |
Final read fee
|
$30 per read
|
Service Connection Fees:
| |
3/4" service
|
$1,000
|
1" service
|
$1,250
|
1 1/2" service
|
$1,500
|
2" service
|
$2,000
|
System Development Fees:
| |
4" water main
|
$4,500
|
6" water main
|
$10,000
|
8" water main
|
$15,000
|
10" water main
|
$16,000
|
12" water main
|
$18,000
|
All connection and system development fees are to be paid in
full prior to excavation of the water service or the water main.
|