A. 
The semi-annual water rates are in cubic feet, and are based upon six-month total consumption.
Category
(cubic feet)
Usage
(cubic feet)
Rate
0 to 1,400
First 1,400
$50 minimum
1,401 to 8,000
Next 6,600
$2.75 per 100 cu/ft
Over 8,001
All other usage
$3.75 per 100 cu/ft
B. 
A meter maintenance fee of $7.50 will be assessed each billing period.
C. 
All unmetered accounts shall be assessed a semi-annual flat rate bill of $80.
A. 
If any water bill or any other charge due has not been paid in full within 30 days after its due date, an arrearage charge will be added thereto and shall become part of the total water bill. The arrears charge shall be $25.
B. 
If any rate, arrearage, or any other charge(s) assessed to a property has not been paid in full within 60 days of its due date, the Water Department can shut off the water service or services until all rates, arrearages, water turn-on fees, and other charges have been paid in full.
C. 
When water is shut off for nonpayment or for violations of Water Department rules and regulations, a water turn-on fee of $75 will be made prior to water service being restored. Checks returned by the bank unpaid will be assessed a returned check fee of $25. Additionally, the Department has the right to refuse future payments by check.
A fee of $65 will be charged for the initial test and each retest. A fee of $50 per hour will be charged for a cross-connection survey.
All semi-annual out-of-Town water billing will have a charge of $12 per bill. Other charges are as follows:
Final read charge
$30
Damaged facilities
Cost of repair
Turn-on/off
$75
Hydrant rental
$100
Fire flow test fee
$100 per test
Meter testing fee:
Meters over 1"
$60 per hour
Meters 5/8" to 1"
$60 flat fee
Connection fee
$400
Tapping fee
$100
Final read fee
$30 per read
Service Connection Fees:
3/4" service
$1,000
1" service
$1,250
1 1/2" service
$1,500
2" service
$2,000
System Development Fees:
4" water main
$4,500
6" water main
$10,000
8" water main
$15,000
10" water main
$16,000
12" water main
$18,000
All connection and system development fees are to be paid in full prior to excavation of the water service or the water main.