All plans for subdivision and/or land development within the
corporate limits of the Township shall be submitted and reviewed as
provided in this chapter and shall be approved or disapproved by the
Township in accord with the procedures specified in this article.
A. Required plans. Preliminary and final plans and required fees and supporting data for all proposed major subdivisions and land developments shall be provided by the applicant. A preliminary plan shall not be required for minor subdivisions. A sketch plan, as detailed in §
345-302, shall not be considered a required plan, but is strongly encouraged.
Sketch
|
Preliminary
|
Final
|
---|
Minor Subdivision
|
|
Not required
|
|
Major Subdivision
|
|
|
|
Land Development
|
|
|
|
Lot Improvement
|
|
Not required
|
|
B. Requirement for plan filing.
(1)
Filing with Township. Unless otherwise provided by this chapter,
all required plans, applications, fees and supporting data shall be
presented by certified mail or delivered in person to the Township
not less than 15 calendar days prior to the Planning Commission meeting
at which the same is to be considered for acceptance for review by
the Planning Commission. Any filing received less than 15 days prior
to a regularly scheduled meeting of the Planning Commission will not
be placed on the agenda for consideration until the next regularly
scheduled meeting of the Planning Commission; unless the Planning
Commission, in its sole discretion, otherwise agrees due to exceptional
or unusual circumstances.
(2)
Electronic documents. In addition to the required number of
paper copies, all filings shall include two compact discs with all
documents in electronic portable document file (PDF) format and AutoCAD
format or other electronic format approved by the Township. In addition
to electronic submissions, applicant shall also include paper copies.
No submission will be considered complete unless paper copies accompany
the electronic submission. In the event of any revisions, applicant
will submit both electronic and paper copies.
[Amended 5-20-2019 by Ord. No. 2019-03]
(3)
Official Map. The applicant shall, prior to filing any plan,
determine if any of the land proposed for subdivision or land development
is subject to the Polk Township Official Map. The applicant is encouraged
to contact the Township Zoning Officer prior to filing the plan.
(4)
Filing verification. The Township shall review the filed documents
to make a preliminary determination whether the required documents
have been filed in proper number and form. If complete, the Township
will issue a verification indicating the date the filing was received
by the Township. If not complete, all documents and the fee shall
be returned to the applicant.
C. Refiling of plans.
(1)
The refiling of plans shall be done in the same manner and number
as required for the initial filing.
(2)
Any revised plans shall include all revisions clearly highlighted
on the plans or a summary of the revisions sealed by the project engineer.
D. Attendance. The applicant or a duly authorized representative shall
attend each Planning Commission and Board of Supervisors meeting at
which the application is on the agenda.
E. Public hearing. Before acting on any plan, the Planning Commission
and/or Board of Supervisors may, at its option, hold a public hearing
thereon after public notice.
F. Action. All minor, preliminary and final plans and all land development
plans (but excluding lot line adjustment plans) shall be reviewed
by the Planning Commission for compliance with this chapter. Plans
and supportive data which are complete shall be recommended to the
Board of Supervisors for approval, approval with conditions, or denial.
G. Field inspections.
(1)
Landowner permission. It shall be implicit in any request for
plan approval that the landowner automatically grants the Planning
Commission, the Township Board of Supervisors, or anyone designated
by either body, the right to enter upon the area proposed for the
subdivision for the purpose of becoming familiar with the property,
making necessary observations or tests or for any other reasonable
and lawful purpose.
(2)
Scheduling. The Planning Commission or Board of Supervisors
may, at the time of sketch plan or preliminary plan filing or at any
other time deemed appropriate, schedule a field inspection of the
parcel proposed for subdivision or development. The applicant or his
representative shall, upon request by the Township, accompany the
Township official or designated representative, and to facilitate
the inspection, the applicant shall have the approximate center line(s)
of any proposed streets marked with temporary stakes.
H. Recording final plans.
(1)
Time limit. Upon the approval of a final plan, the applicant
shall, within 90 days of such final approval, or 90 days after the
date of delivery of an approved and signed record plan following completion
of conditions imposed for such approval, whichever is later, record
such Record Plan in the Office of the Monroe County Recorder of Deeds,
and provide to the Township proof of recording within 105 days of
the said approval/delivery.
(2)
Failure to record. If the applicant fails to record the Record
Plan in the Recorder's office within the required ninety-day period
and provide the proof of recording within the one-hundred-five-day
period, the action of the Township shall be deemed null and void and
a resubmission of the plan shall be made to the Township.
(3)
Lot improvement plans. In the case of lot joinder plans, the
applicant shall provide proof of recording the required deeds within
90 days of recording the plan for the lot joinder. If the applicant
fails to provide the proof of deed recording within the required ninety-day
period, the action of the Township shall be deemed null and void and
a resubmission of the plan shall be made to the Township.
(4)
Recorder of Deeds. The Monroe County Recorder of Deeds shall
not accept any plan for recording unless such plan officially notes
the approval of the Board of Supervisors and review by the Monroe
County Planning Commission.
(5)
Tax assessment. The recording of the plan shall not constitute
grounds for tax assessment increases until such time as lots are sold
or improvements are installed on the land included within the subject
plan.
(See §
345-306 for optional land development process.)
A. All applications for preliminary plans for major subdivisions and land developments shall be filed with the Township and processed in accord with this §
345-303.
(1)
Filings not preceded by a sketch plan. If an applicant opts not to provide a sketch plan, the preliminary plan shall include all information required for sketch plans listed in §
345-401, specifically including the existing resources and site analysis, plus further details as required by this chapter.
(2)
Site inspection. If requested by the Planning Commission, a site inspection shall be arranged and conducted in accord with §
345-302D(3).
B. Official filing of preliminary plans.
(1)
Plan to be filed with the Township.
(a)
Initial filing. Copies of the preliminary plan and all required
supporting documentation shall be provided to the Township by the
applicant or authorized representative by noon at least 15 days prior
to the Planning Commission meeting at which the applicant applies
for the "Official Date of Preliminary Plan Submission."
(b)
Subsequent materials. All materials provided in support of an
application after the initial filing, whether an amended plan, an
expert or agency report or review letter, or any other data in support
of an application shall be provided to the Township at least 15 days
prior to the meeting at which the applicant wishes to have those materials
considered.
(c)
Electronic documents. In addition to the required number of
paper copies, all filings shall include two compact discs with all
documents in electronic portable document file (PDF) format and AutoCAD
format or other electronic format approved by the Township. In addition
to electronic submissions, applicant shall also include paper copies.
No submission will be considered complete unless paper copies accompany
the electronic submission. In the event of any revisions, applicant
will submit both electronic and paper copies.
[Amended 5-20-2019 by Ord. No. 2019-03]
(2)
Number of copies to be filed. The filing of the preliminary
plan shall include the following: (The Township may require the applicant
to provide additional copies of any required information. The required
number of copies required for initial submission may be changed by
resolution of the Board of Supervisors.)
(a)
Five completed copies of the subdivision plan application.
(b)
Five legible paper prints of the preliminary plan.
(c)
Five copies of the required sewage planning module(s) and associated
documentation.
(d)
Three copies of all other required supporting data and information as required in Article
IV of this chapter.
(3)
Preliminary plan filing fee. The Township shall collect a preliminary
plan filing fee as established by resolution of the Supervisors for
all subdivisions.
(a)
Fees charged shall cover the costs listed in §
345-1005C and other administrative expenses associated with the review of subdivision.
(b)
The applicant shall pay the fee at the time of initial filing
of the application to the Township.
(4)
Preliminary plan filing verification and distribution. Upon
receipt of the preliminary plan and supporting data, the Township
shall verify the filing for the required number of copies of all documents.
(a)
If the filing is verified, the Township shall accept the said
plans and documentation, complete the filing verification, noting
same, and provide a copy of the plan filing verification to the applicant.
The Township shall then provide copies of the applicable plans and
documents to:
[3]
The Township Planning Commission Solicitor.
[4]
The Township Zoning Officer.
[5]
Any other engineer or consultant designated by the Township.
(b)
If the filing is not verified, the Township shall complete the
plan filing verification, noting any and all deficiencies or omissions
in the filing, provide a copy of the plan filing verification to the
applicant, and return all documents to the applicant.
(c)
The plan filing verification shall only verify that the correct
number of copies of all plans and documentation have been provided
and shall in no way be construed to be a plan submission receipt.
(5)
Official date of the preliminary plan submission. The official
date of the preliminary plan submission shall be determined by the
Planning Commission, which shall examine the filed documents to determine
that all are complete and in proper form.
(a)
If the filed documents are not complete or not in the proper
form, the applicant shall be notified, in writing, of the deficiencies,
and the filed documents shall be rejected until the said deficiencies
are corrected and then examined again at the next regularly scheduled
or special meeting after the refiling.
(b)
If the filed documents are complete and acceptable, the Township
shall complete an official submission receipt listing the date of
the said meeting as the official date of the preliminary plan submission
and forward said receipt to the applicant.
(c)
If the first meeting of the Planning Commission following the date of filing verification occurs more than 30 calendar days following the date of filing verification established in accord with §
345-303B(4), the ninety-calendar day review period shall be measured from the 30th calendar day following the day of said filing verification.
(d)
If the application is being filed after a final order of the
court remanding the application to the Township, the ninety-calendar
day review period shall be measured from the date of the meeting of
the Planning Commission next following the final order of the court.
If the first meeting of the Planning Commission occurs more than 30
calendar days following the final order of the court, the ninety-calendar
day review period shall be measured from the 30th calendar day following
the final order of the court.
(6)
Distribution of the preliminary plan. When authorized by the
Township, the applicant shall provide the plan and all required supporting
documentation to the Monroe County Planning Commission for review.
The applicant shall be responsible for providing the plan and all
required supporting documentation to the Monroe County Conservation
District, PennDOT, and all other agencies.
C. Preliminary plan review and action.
(1)
Planning Commission review and action period. The Planning Commission shall review the properly filed preliminary plan to determine compliance with this chapter and take action to reject or recommend to Supervisors denial, approval, or approval with conditions and modifications of such plan as provided in this §
345-303C. The Planning Commission shall make its recommendation to Supervisors and communicate, in writing, such recommendation to the applicant within 15 calendar days of when the decision was made.
(a)
If approval is recommended, the plan and written notice of said
recommendation, along with the other documentation, shall be forwarded
to the Supervisors.
(b)
If approval with conditions is recommended, such approval recommendation
shall be communicated to supervisors and the applicant, in writing,
along with a statement of such conditions.
(c)
If denial is recommended, the specific reasons for such denial,
citing specific provisions of this chapter or other applicable statute,
and the date of the denial recommendation, shall be communicated to
supervisors and the applicant, in writing.
(2)
Supervisors' review and action period. Upon the receipt of the Planning Commission's recommendation, Supervisors shall make its decision regarding the preliminary plan and communicate, in writing, such decision to the applicant within 15 calendar days of when the decision is made. However, in no case shall the period for Township review and action, including the written communication to the applicant, exceed 90 calendar days from the official date of the preliminary plan submission as established pursuant to §
345-303B(5).
(3)
Supervisors' approval with conditions. When a preliminary plan is approved with conditions, such conditions shall be expressly included in the minutes of the Supervisors' meeting at which the preliminary plan is considered and communicated, in writing, to the applicant as provided in §
345-303C(2). When a preliminary plan has been approved subject to any conditions and/or modifications and the applicant does not agree and accept the said conditions and/or modifications, in writing, within 15 calendar days of receipt of said written notice, the said conditional approval of the preliminary plan shall become an automatic disapproval and the said plan shall be refiled as required by §
345-303, including a new filing fee. The written notice to the applicant shall include the specific terms of the approval and shall note that failure to agree and accept the conditions shall constitute a denial of the plan.
(4)
Supervisors' denials. When a preliminary plan is denied, the reasons for such denial, citing specific provisions of this chapter or other applicable statute, shall be expressly included in the minutes of the Supervisors' meeting at which the preliminary plan is considered and communicated, in writing, to the applicant as provided in §
345-303C(2).
D. Reviewing agency's and officials' comments. The Planning Commission and Supervisors may consider the comments and the recommendations provided pursuant to §
345-303B(6) and may request such additional information as deemed necessary.
E. Monroe County Planning Commission comments. No official action shall
be taken by the Board of Supervisors until it has received and considered
the comments of the Monroe County Planning Commission or after 30
calendar days following transmittal of the preliminary plan to the
County Planning Commission.
F. Sewage facilities planning modules. The Supervisors shall concurrently
make its decision on the sewage facilities planning module, and if
approval is granted, the completed sewage planning documents shall
be forwarded to the Pennsylvania Department of Environmental Protection.
Preliminary plan approval shall be conditional upon Department of
Environmental Protection sewage planning approval.
G. Highway occupancy permit. If a highway occupancy permit shall be
required for access to a Township or state road, approval of the preliminary
major subdivision plan shall be conditional upon the issuance of a
highway occupancy permit by the Township or PennDOT, as the case may
be.
H. Soil erosion and sedimentation control. Approval of the preliminary
plan shall be conditional upon the approval of the soil erosion and
sedimentation control plan by the Monroe County Conservation District
and the issuance of any associated permits.
I. Public hearing. The Planning Commission or Supervisors may conduct
a public hearing on the proposed preliminary plan pursuant to public
notice.
J. Time extension. The time period for review of the plan may be extended
by mutual agreement of the applicant and the Township, and any such
agreement shall be in writing.
(See §
345-306 for optional land development process.)
All final plans for major subdivisions and land developments shall be filed and processed in accord with this §
345-304.
A. Final plan application. An application for final plan approval can
be filed only when all of the following conditions have been met:
(1)
The subdivision has previously been granted an unconditional preliminary plan approval in accord with §
345-303 or all conditions established by the Board of Supervisors for the preliminary plan approval have been fulfilled by the applicant.
(2)
All improvements, such as roads and drainage facilities (see definition of improvement in Article
II), which are shown on the preliminary plan have been completed or guaranteed in accord with Article
V of this chapter.
B. Final plan conformation; five-year protection from ordinance changes. The final plan shall conform in all principal respects to the previously approved preliminary plan. The Planning Commission shall determine whether a modified final plan shall be accepted or whether a new preliminary plan shall be filed pursuant to §
345-303. In accord with §
345-105 of this chapter and § 508(4)(ii) of the MPC, when a preliminary plan has been approved without conditions
or approved by the applicant's acceptance of conditions, no subsequent
change or amendment in the zoning, subdivision or other governing
ordinance or plan shall be applied to affect adversely the right of
the applicant to commence and to complete any aspect of the approved
development in accord with the terms of such approval within five
years from such approval.
C. Sections. Final plans may be filed in sections in accord with § 508(4)(v),
(vi) and (vii) of the MPC, each covering a portion of the entire proposed subdivision
as shown on the preliminary plan.
(1)
Each section in the subdivision, except for the last section,
shall contain a minimum of 25% of the total number of lots and/or
dwelling units as depicted on the preliminary plan, except that the
Supervisors may approve a lesser percentage.
(2)
When a final plan is proposed to be filed by sections, a proposed
layout of the sections, their boundaries, the order of filing, and
a schedule of filing shall be proposed to the Township for approval
prior to filing of the first section.
D. Official filing of final plans.
(1)
Plan to be filed with the Township.
(a)
Initial filing. Copies of the final plan and all required supporting
documentation shall be filed with the Township by the applicant or
authorized representative by noon at least 15 days prior to the Planning
Commission meeting at which the applicant applies for the "Official
Date of Final Plan Submission."
(b)
Subsequent material. All materials provided in support of an
application after the initial filing, whether an amended plan, an
expert or agency report or review letter, or any other data in support
of an application, shall be provided to the Township at least 15 prior
to the meeting at which the applicant wishes to have those materials
considered.
(c)
Electronic documents. In addition to the required number of
paper copies, all filings shall include two compact discs with all
documents in electronic portable document file (PDF) format and AutoCAD
format or other electronic format approved by the Township. In addition
to electronic submissions, applicant shall also include paper copies.
No submission will be considered complete unless paper copies accompany
the electronic submission. In the event of any revisions, applicant
will submit both electronic and paper copies.
[Amended 5-20-2019 by Ord. No. 2019-03]
(2)
Number of copies to be filed. The official filing of the final
plan shall include the following: (The Township may require the applicant
to provide additional copies of any required information. The required
number of copies required for initial submission may be changed by
resolution of the Board of Supervisors.)
(a)
Five completed copies of the subdivision plan review application.
(b)
The number of and type of plan for initial submission, revisions,
and final are listed on the Polk Township SALDO Plan Submission Form.
[Amended 5-20-2019 by Ord. No. 2019-03]
(c)
Five copies of all required sewage disposal approvals and/or
permits from the Pennsylvania Department of Environmental Protection.
(d)
Five copies of the applicable highway occupancy permit.
(e)
Three copies of all other required supporting data and information as required in Article
IV of this chapter.
(3)
Final plan filing fee. The Township shall collect a final plan
filing fee as established by resolution of the Supervisors for all
subdivisions.
(a)
Fees charged shall cover the costs listed in §
345-1005C and other administrative expenses associated with the review of subdivision.
(b)
The applicant shall pay the fee at the time of initial submission
of the application to the Township.
(4)
Final plan filing verification and distribution. Upon receipt
of the final plan and supporting data, the Township shall verify the
filing for the required number of copies of all documents.
(a)
If the filing is verified, the Township shall accept the said
plans and documentation, complete the filing verification, noting
same, and provide a copy of the plan filing verification to the applicant.
The Township shall then provide copies of the applicable plans and
documents to:
[3]
The Township Planning Commission Solicitor.
[4]
The Township Zoning Officer.
[5]
Any other engineer or consultant designated by the Township.
(b)
If the filing is not verified, the Township shall complete the
plan filing verification, noting any and all deficiencies or omissions
in the filing, provide a copy of the plan filing verification to the
applicant, and return all documents to the applicant.
(c)
The plan filing verification shall only verify that the correct
number of copies of all plans and documentation have been filed and
shall in no way be construed to be a plan submission receipt.
(5)
Official date of the final plan submission. The official date
of the final plan submission shall be determined by the Planning Commission,
which shall examine the filed documents to determine that all are
complete and in proper form.
(a)
If the filed documents are not complete or not in the proper
form, the applicant shall be notified, in writing, of the deficiencies,
and the filed documents shall be rejected until the said deficiencies
are corrected and then examined again at the next regularly scheduled
or special meeting after the refiling.
(b)
If the filed documents are complete and acceptable, the Chairman
of the Planning Commission shall complete an official submission receipt
listing the date of the said meeting as the official date of the final
plan submission and forward said receipt to the applicant.
(c)
If the first meeting of the Planning Commission following the date of filing verification occurs more than 30 calendar days following the date of filing verification established in accord with §
345-304D(4), the ninety-calendar-day review period shall be measured from the 30th calendar day following the day of said filing verification.
(d)
If the application is being filed after a final order of the
court remanding the application to the Township, the ninety-calendar
day review period shall be measured from the date of the meeting of
the Planning Commission next following the final order of the court.
If the first meeting of the Planning Commission occurs more than 30
calendar days following the final order of the court, the ninety-calendar-day
review period shall be measured from the 30th calendar day following
the final order of the court.
(6)
Distribution of the final plan. When authorized by the Township,
the applicant shall provide the plan and all required supporting documentation
to the Monroe County Planning Commission for review. The applicant
shall be responsible for providing the plan and all required supporting
documentation to the Monroe County Conservation District, PennDOT,
and all other agencies.
E. Final plan review and action.
(1)
Planning Commission review and action period. The Planning Commission shall review the properly filed final plan to determine compliance with this chapter and take action to reject or recommend to Supervisors denial, approval, or approval with conditions and modifications of such plan as provided in this §
345-304E. The Planning Commission shall make its recommendation to the Supervisors and communicate, in writing, such recommendation to the applicant within 15 calendar days of when the decision was made.
(a)
If approval is recommended, the plan and written notice of said
recommendation, along with the other documentation, shall be forwarded
to Supervisors.
(b)
If approval with conditions is recommended, such approval recommendation
shall be communicated to Supervisors and the applicant, in writing,
along with a statement of such conditions.
(c)
If denial is recommended, the specific reasons for such denial,
citing specific provisions of this chapter or other applicable statute,
and the date of the denial recommendation, shall be communicated to
Supervisors and the applicant, in writing.
(2)
Supervisors' review and action period. Upon the receipt of the Planning Commission's recommendation, the Board of Supervisors shall make its decision regarding the final plan and communicate, in writing, such decision to the applicant within 15 calendar days of when the decision is made. However, in no case shall the period for Township review and action, including the written communication to the applicant, exceed 90 calendar days from the official date of the final plan submission as established pursuant to §
345-304D(5).
(3)
Supervisors' approval with conditions. When a final plan is approved with conditions, such conditions shall be expressly included in the minutes of the Supervisors' meeting at which the final plan is considered and communicated, in writing, to the applicant as provided in §
345-304E(2). When a final plan has been approved subject to any conditions and/or modifications and the applicant does not agree and accept the said conditions and/or modifications, in writing, within 15 calendar days of receipt of said written notice, the said conditional approval of the final plan shall become an automatic disapproval, and the said plan shall be re-filed as required by §
345-304, including a new filing fee. The written notice to the applicant shall include the specific terms of the approval and shall note that failure to agree and accept the conditions shall constitute a denial of the plan.
(4)
Supervisors' denials. When a final plan is denied, the reasons for such denial, citing specific provisions of this chapter or other applicable statute, shall be expressly included in the minutes of the Supervisors' meeting at which the final plan is considered and communicated, in writing, to the applicant as provided in §
345-304E(2).
F. Reviewing agency's and officials' comments. The Planning Commission and Supervisors shall consider the comments and the recommendations provided pursuant to §
345-304D(6) and may request such additional information as deemed necessary.
G. Monroe County Planning Commission comments. No official action shall
be taken by the Supervisors until it has received and considered the
comments of the Monroe County Planning Commission or after 30 calendar
days following transmittal of the final plan to the County Planning
Commission.
H. Public hearing. The Planning Commission or Supervisors may conduct
a public hearing on the proposed final plan pursuant to public notice.
I. Planned improvements. The Supervisors shall not approve or sign the final plan until such time as all the improvements shown on the final plan have been installed by the developer and verified as complete by the Township Engineer or a performance guarantee has been provided by the applicant pursuant to Article
V of this chapter.
J. Signature of final plan. When all requirements and conditions have
been fulfilled by the applicant and all supplemental data and documents
have been provided and approved, the Supervisors shall endorse the
final plan for recording purposes and shall retain at least one endorsed
print.
K. Applicant's duty to record the final plan.
(1)
Deadline. The applicant shall record the approved final plan
with the Monroe County Recorder of Deeds within 90 calendar days of
the date of endorsement by the Board of Supervisors.
(2)
Notification. The applicant shall notify the Board of Supervisors
in writing of the date of such recording and the plan book and page
wherein such plan is recorded.
(3)
Failure to record. If the plan is not recorded within the required
time period, the approval shall lapse and become void.
L. As-built plans. Upon the completion of all improvements, the applicant
shall provide to the Township plans certified by the applicant's surveyor
and engineer showing all such improvements as installed. Failure of
the applicant to provide the as-built plans shall constitute a violation
of this chapter and shall be subject to all the enforcement proceedings
contained in this chapter.
M. Time extension. The time period for review of the plan may be extended
by mutual agreement of the applicant and the Supervisors, and any
such agreement shall be in writing.
Preliminary plans for minor subdivisions shall not be required. However, a final plan for all minor subdivisions shall be filed with the Township and be processed in accord with this §
345-305.
A. Official filing of minor subdivision plans.
(1)
Plan to be filed with the Township.
(a)
Initial filing. Copies of the minor subdivision plan and all
required supporting documentation shall be filed with the Township
by the applicant or authorized representative by noon at least 15
days prior to the Planning Commission meeting at which the applicant
applies for the "Official Date of Minor Subdivision Plan Submission."
(b)
Subsequent materials. All materials provided in support of an
application after the initial filing, whether an amended plan, an
expert or agency report or review letter, or any other data in support
of an application shall be filed with the Township at least 15 days
prior to the meeting at which the applicant wishes to have those materials
considered.
(c)
Electronic documents. In addition to the required number of
paper copies, all filings shall include two compact discs with all
documents in electronic portable document file (PDF) format and AutoCAD
format or other electronic format approved by the Township. In addition
to electronic submissions, applicant shall also include paper copies.
No submission will be considered complete unless paper copies accompany
the electronic submission. In the event of any revisions, applicant
will submit both electronic and paper copies.
[Amended 5-20-2019 by Ord. No. 2019-03]
(2)
Number of copies to be provided. The official filing of the
minor subdivision plan shall include the following: (The Township
may require the applicant to provide additional copies of any required
information. The required number of copies required for initial submission
may be changed by resolution of the Board of Supervisors.)
(a)
Five completed copies of the subdivision plan application.
(b)
The number of and type of plan for initial submission, revisions,
and final are listed on the Polk Township SALDO Plan Submission Form.
[Amended 5-20-2019 by Ord. No. 2019-03]
(c)
Five copies of the required sewage planning module(s) and associated
documentation.
(d)
Three copies of all other required supporting data and information as required in Article
IV of this chapter.
(3)
Minor subdivision plan filing fee. The Township shall collect
a minor subdivision plan filing fee as established by resolution of
the Supervisors for all subdivisions.
(a)
Fees charged shall cover the costs listed in §
345-1005C and other administrative expenses associated with the review of subdivision.
(b)
The applicant shall pay the fee at the time of initial filing
of the application to the Township.
(4)
Minor subdivision plan filing verification and distribution.
Upon receipt of the minor subdivision plan and supporting data, the
Township shall verify the filing for the required number of copies
of all documents.
(a)
If the filing is verified, the Township shall accept the said
plans and documentation, complete the filing verification, noting
same, and provide a copy of the plan filing verification to the applicant.
The Township shall then provide copies of the applicable plans and
documents to:
[3]
The Township Planning Commission Solicitor.
[4]
The Township Zoning Officer.
[5]
Any other engineer or consultant designated by the Township.
(b)
If the filing is not verified, the Township shall complete the
plan filing verification, noting any and all deficiencies or omissions
in the filing, provide a copy of the plan filing verification to the
applicant, and return all documents to the applicant.
(c)
The plan filing verification shall only verify that the correct
number of copies of all plans and documentation have been provided
and shall in no way be construed to be a plan submission receipt.
(5)
Official date of the minor subdivision submission. The official
date of the minor subdivision plan submission shall be determined
by the Planning Commission, which shall examine the filed documents
to determine that all are complete and in proper form.
(a)
If the filed documents are not complete or not in the proper
form, the applicant shall be notified, in writing, of the deficiencies;
and, the filed documents shall be rejected until the said deficiencies
are corrected and then examined again at the next regularly scheduled
or special meeting after the refiling.
(b)
If the filed documents are complete and acceptable, the Chairman
of the Planning Commission shall complete an official submission receipt
listing the date of the said meeting as the official date of the minor
subdivision plan submission and forward said receipt to the applicant.
(c)
If the first meeting of the Planning Commission following the date of filing verification occurs more than 30 calendar days following the date of filing verification established in accord with §
345-305A(4), the ninety-calendar-day review period shall be measured from the 30th calendar day following the day of said filing verification.
(d)
If the application is being filed after a final order of the
court remanding the application to the Township, the ninety-calendar-day
review period shall be measured from the date of the meeting of the
Planning Commission next following the final order of the court. If
the first meeting of the Planning Commission occurs more than 30 calendar
days following the final order of the court, the ninety-calendar-day
review period shall be measured from the 30th calendar day following
the final order of the court.
(6)
Distribution of the minor subdivision plan. When authorized
by the Township, the applicant shall provide the plan and all required
supporting documentation to the Monroe County Planning Commission
for review. The applicant shall be responsible for providing the plan
and all required supporting documentation to the Monroe County Conservation
District, PennDOT, and all other agencies.
B. Minor subdivision plan review and action.
(1)
Planning Commission review and action period. The Planning Commission shall review the properly filed minor subdivision plan to determine compliance with this chapter and take action to reject, or recommend to Supervisors denial, approval, or approval with conditions and modifications of such plan as provided in this §
345-305B. The Planning Commission shall make its recommendation to Supervisors and communicate, in writing, such recommendation to the applicant within 15 calendar days of when the decision was made.
(a)
If approval is recommended, the plan and written notice of said
recommendation, along with the other documentation, shall be forwarded
to the Board of Supervisors.
(b)
If approval with conditions is recommended, such approval recommendation
shall be communicated to the Supervisors and the applicant, in writing,
along with a statement of such conditions.
(c)
If denial is recommended, the specific reasons for such denial,
citing specific provisions of this chapter or other applicable statute,
and the date of the denial recommendation, shall be communicated to
the Supervisors and the applicant in writing.
(2)
Supervisors' review and action period. Upon the receipt of the Planning Commission's recommendation, the Board of Supervisors shall make its decision regarding the minor subdivision plan and communicate, in writing, such decision to the applicant within 15 calendar days of when the decision is made. However, in no case shall the period for Township review and action, including the written communication to the applicant, exceed 90 calendar days from the official date of the minor subdivision plan submission as established pursuant to §
345-305A(5).
(3)
Supervisors approval with conditions. When a minor subdivision plan is approved with conditions, such conditions shall be expressly included in the minutes of the Supervisors' meeting at which the minor subdivision plan is considered and communicated, in writing, to the applicant as provided in §
345-305B(2). When a minor subdivision plan has been approved subject to any conditions and/or modifications and the applicant does not agree and accept the said conditions and/or modifications, in writing, within 15 calendar days of receipt of said written notice, the said conditional approval of the minor subdivision plan shall become an automatic disapproval, and the said plan shall be refiled as required by §
345-305, including a new filing fee. The written notice to the applicant shall include the specific terms of the approval and shall note that failure to agree and accept the conditions shall constitute a denial of the plan.
(4)
Supervisors' denials. When a minor subdivision plan is denied, the reasons for such denial, citing specific provisions of this chapter or other applicable statute, shall be expressly included in the minutes of the Supervisors' meeting at which the minor subdivision plan is considered and communicated, in writing, to the applicant as provided in §
345-305B(2).
C. Reviewing agency's and officials' comments. The Planning Commission and Board of Supervisors shall consider the comments and the recommendations pursuant to §
345-305A(6) and may request such additional information as deemed necessary.
D. Monroe County Planning Commission comments. No official action shall
be taken by the Board of Supervisors until it has received and considered
the comments of the Monroe County Planning Commission or after 30
calendar days following transmittal of the minor subdivision plan
to the County Planning Commission.
E. Sewage facilities planning modules. The Board of Supervisors shall
concurrently make its decision on the sewage facilities planning module;
and, if approval is granted, the completed sewage planning documents
shall be forwarded to the Pennsylvania Department of Environmental
Protection. Minor subdivision plan approval shall be conditional upon
Department of Environmental Protection sewage planning approval.
F. Highway occupancy permit. If a highway occupancy permit shall be
required for access to a Township or state road, approval of the minor
subdivision plan shall be conditional upon the issuance of a highway
occupancy permit by the Township or PennDOT, as the case may be.
G. Soil erosion and sedimentation control. Approval of the minor subdivision
plan shall be conditional upon the approval of the soil erosion and
sedimentation control plan by the Monroe County Conservation District
and the issuance of any associated permits.
H. Public hearing. The Planning Commission or Supervisors may conduct
a public hearing on the proposed minor subdivision plan pursuant to
public notice.
I. Signature of minor subdivision plan. When all requirements and conditions
have been fulfilled by the applicant and all supplemental data and
documents have been provided and approved, the Supervisors shall endorse
the minor subdivision plan for recording purposes and shall retain
at least one endorsed print.
J. Applicant's duty to record the final minor plan.
(1)
Deadline. The applicant shall record the approved final plan
with the Monroe County Recorder of Deeds within 90 calendar days of
the date of endorsement by the Board of Supervisors.
(2)
Notification. The applicant shall notify the Board of Supervisors
in writing of the date of such recording and the plan book and page
wherein such plan is recorded.
(3)
Failure to record. If the plan is not recorded within the required
time period, the approval shall lapse and become void.
K. Time extension. The time period for review of the plan may be extended
by mutual agreement of the applicant and the Supervisors, and any
such agreement shall be in writing.
The intent of this §
345-307 is to simplify the review and approval procedure for minor residential land developments. Preliminary plans for minor residential land development shall not be required; however, a final plan shall be submitted to the Township and be processed in accord with this §
345-307.
A. Minor residential land development criteria. A land development, as defined by Article
II of this chapter, may be considered a minor residential land development for the purposes of this chapter, provided said development does not involve more than two dwelling units or is not by definition considered a major subdivision. Multifamily dwellings, mobile home parks, and campgrounds and recreational vehicle parks shall not qualify as minor land developments.
B. Procedure and other requirements. Minor residential land development plans shall be processed in accord with the requirements for minor subdivisions in §
345-305 of this chapter. All information and design requirements of this chapter applicable to land developments shall also apply to minor residential land developments except as provided in this §
345-307. The Board of Supervisors may, based upon the character of the project and site conditions, waive the applicability of any or all of the land development requirements including the requirement for a survey of the project parcel.
C. Minor residential land development determination.
(1)
Request to be filed with the Planning Commission. The request for minor residential land development determination shall be submitted to the Township by the applicant or his authorized representative in writing at least 15 calendar days prior to the Planning Commission meeting which the applicant will attend. The request shall contain such information as may be necessary for the Township to determine the minor land development status of the proposed project in accord with this §
345-307. The Township shall have the right to require any additional information deemed necessary.
(2)
Status of application for minor residential land development
determination. The application for minor residential land development
determination shall not constitute a formal land development submission
and shall not initiate the ninety-day review period normally required
for land developments.
(3)
Determination of minor residential land development. The Planning Commission shall determine the minor residential land development status of the application in accord with the criteria in this §
345-307 and report its determination regarding the same to the applicant.
(a)
In cases where the Planning Commission determines that the proposed development does meet the requirements for a minor residential land development, the information required for the application shall be submitted in accord with §
345-307D.
(b)
If the Planning Commission determines that the subject development does not meet the criteria for a minor residential land development, said development shall be considered a regular land development governed by §
345-306 of this chapter, and the information required for the application shall be submitted in accord with all the applicable sections of this chapter and all other applicable requirements.
D. Minor residential land development application information. The plan requirements in §
345-305 for minor subdivisions shall apply to minor residential land development plans. However, the Township may require any additional information necessary as site-specific conditions dictate to determine compliance with this chapter and any other requirements. A survey of the parcel of property containing the proposed minor residential land development shall generally not be required; however, the Township shall have the right to require a survey by a registered surveyor in cases where circumstances dictate the need for same to assure compliance with applicable requirements. The Township shall also have the right to apply any of the standards and requirements contained in this chapter.
In accord with § 502.1(b) of the MPC, the governing body of any municipality contiguous to the
Township may appear before the Planning Commission and/or Board of
Supervisors to comment on a proposed subdivision, change of land use,
or land development.