[Amended 4-11-2018 by Ord. No. 18:04]
A. 
The Borough, as a condition of final site plan approval, may require the developer to furnish and shall accept in accordance with the standards adopted by this Code and the regulations adopted pursuant to Section 1 of P.L. 1999, c. 68 (N.J.S.A. 40:55D-53a) a performance guarantee, for the purpose of assuring the installation and maintenance of certain on-tract improvements, and a maintenance guarantee, both in accordance with Subsection A(1) and (2) of this subsection. Successor developers shall furnish a replacement performance guarantee, as a condition to the approval of a permit update under the State Uniform Construction Code, for the purpose of updating the name and address of the owner of property on a construction permit, and the Borough shall accept the replacement performance guarantee in accordance with the standards adopted by this Code and the regulations adopted pursuant to Section 1 of P.L. 1999, c. 68 (N.J.S.A. 40:55D-53a) for the purpose of assuring the installation and maintenance of certain on-tract improvements, the furnishing of a performance guarantee, and provision for a maintenance guarantee, in accordance with Subsection A(1) and (2) of this subsection.
(1) 
Performance guarantee.
(a) 
The developer shall furnish a performance guarantee in favor of the Borough in an amount not to exceed 120% of the cost of installation of only those improvements required by an approval or developer's agreement, ordinance, or regulation to be dedicated to a public entity, and that have not yet been installed, which cost shall be determined by the Borough Engineer, according to the method of calculation set forth in Section 15 of P.L. 1991, c. 256 (N.J.S.A. 40:55D-53.4), for the following improvements as shown on the approved plans or plat: streets, pavement, gutters, curbs, sidewalks, street lighting, street trees, surveyor's monuments, as shown on the final map and required by "the map filing law," P.L. 1960, c. 141 (N.J.S.A. 46:23-9.9 et seq.; repealed by Section 2 of P.L. 2011, c. 217) or N.J.S.A. 46:26B-1 through N.J.S.A. 46:26B-8, water mains, sanitary sewers, community septic systems, drainage structures, public improvements of open space, and any grading necessitated by the preceding improvements.
[1] 
The Borough engineer shall prepare an itemized cost estimate of the improvements covered by the performance guarantee, which itemized cost estimate shall be appended to each performance guarantee posted by the obligor.
(b) 
The developer also will furnish a performance guarantee to include, within an approved phase or section of a development privately owned perimeter buffer landscaping, as imposed as a condition of approval.
[1] 
At the developer's option, a separate performance guarantee may be posted for the privately owned perimeter buffer landscaping.
(c) 
If the developer seeks a temporary certificate of occupancy for a development, unit, lot, building, or phase of development, as a condition of the issuance thereof, the developer shall furnish a separate guarantee, referred to herein as a "temporary certificate of occupancy guarantee," in favor of the Borough in an amount equal to 120% of the cost of installation of only those improvements or items which remain to be completed or installed under the terms of the temporary certificate of occupancy and which are required to be installed or completed as a condition precedent to the issuance of the permanent certificate of occupancy for the development, unit, lot, building, or phase of development, and which are not covered by an existing performance guarantee. Upon posting of a "temporary certificate of occupancy guarantee," all sums remaining under a performance guarantee, required pursuant to Subsection A(1)(a) of this section, which relate to the development, unit, lot, building, or phase of development of which the temporary certificate of occupancy is sought, shall be released. The scope and amount of the "temporary certificate of occupancy guarantee" shall be determined by the Zoning Officer and Borough Engineer. The Borough will not hold more than one guarantee or bond of any type with respect to the same line item. The temporary certificate of occupancy guarantee shall be released by the Zoning Officer, or the Borough Engineer upon the issuance of a permanent certificate of occupancy with regard to the development, unit, lot, building, or phase as to which the temporary certificate of occupancy relates.
(d) 
A developer shall furnish to the Borough a safety and stabilization guarantee, in favor of the Borough. At the developer's option, a safety and stabilization guarantee may be furnished either as a separate guarantee or as a line item of the performance guarantee. A safety and stabilization guarantee shall be available to the Borough solely for the purpose of returning property that has been disturbed to a safe and stable condition or otherwise implementing measures to protect the public from access to an unsafe or unstable condition, only in the circumstance that:
[1] 
Site disturbance has commenced and, thereafter, all work on the development has ceased for a period of at least 60 consecutive days following such commencement for reasons other than force majeure; and
[2] 
Work has not recommenced within 30 days following the provision of written notice by the Borough to the developer of the Borough's intent to claim payment under the guarantee. The Borough shall not provide notice of its intent to claim payment under a safety and stabilization guarantee until a period of at least 60 days has elapsed during which all work on the development has ceased for reasons other than force majeure. The Borough shall provide written notice to a developer by certified mail or other form of delivery providing evidence of receipt.
[a] 
The amount of a safety and stabilization guarantee for a development with bonded improvements in an amount not exceeding $100,000 shall be $5,000.
[b] 
The amount of a safety and stabilization guarantee for a development with bonded improvements exceeding $100,000 shall be calculated as a percentage of the bonded improvement costs of the development or phase of development as follows:
[i] 
$5,000 for the first $100,000 of bonded improvement costs, plus 2 1/2% of bonded improvement costs in excess of $100,000, up to $1,000,000; plus
[ii] 
1% of bonded improvement costs in excess of $1,000,000.
[c] 
The Borough shall release a separate safety and stabilization guarantee to a developer upon the developer's furnishing of a performance guarantee that includes a line item for safety and stabilization in the amount required under this subsection.
[d] 
The Borough shall release a safety and stabilization guarantee upon the Borough Engineer's determination that the development of the project site has reached a point that the improvements installed are adequate to avoid any potential threat to public safety.
(2) 
Maintenance guarantee.
(a) 
The developer shall post with the Borough, prior to the release of a performance guarantee required pursuant to Subsection A(1)(a), (b), or both Subsection A(1)(a) and (b) of this subsection, a maintenance guarantee in an amount not to exceed 15% of the cost of the installation of the improvements which are being released.
(b) 
If required, the developer shall post with the Borough upon the inspection and issuance of final approval of the following private site improvements by the Borough Engineer, a maintenance guarantee in an amount not to exceed 15% of the cost of the installation of the following private site improvements: stormwater management basins, in-flow and water quality structures within the basins, and the out-flow pipes and structures of the stormwater management system, if any, which cost shall be determined according to the method of calculation set forth in Section 15 of P.L. 1991, c. 256 (N.J.S.A. 40:55D-53.4).
(c) 
The term of the maintenance guarantee shall be for a period not to exceed two years and shall automatically expire at the end of the established term.
(3) 
If other governmental agencies or public utilities automatically will own the utilities to be installed or the improvements are covered by a performance or maintenance to another governmental agency, no performance or maintenance guarantee, as the case may be, shall be required by the Borough for such utilities or improvements.
B. 
The time allowed for installation of the bonded improvements for which a performance guarantee has been provided may be extended by the governing body by resolution. As a condition or as part of any such extension, the amount of any performance guarantee shall be increase or reduced, as the case may be, to an amount not to exceed 120% of the cost of the installation, which cost shall be determined by the Borough engineer according to the method of calculation set forth in Section 15 of P.L. 1991, c. 256 (N.J.S.A. 40:55D-53.4) as of the time of the passage of the resolution.
C. 
If the required bonded improvements are not completed or corrected in accordance with the performance guarantee, the obligor and surety, if any, shall be liable thereon to the Borough for the reasonable cost of the improvements not completed or corrected and the Borough may either prior to or after the receipt of the proceeds thereof complete such improvements. Such completion or correction of improvements shall be subject to the public bidding requirements of the Local Public Contracts Law, P.L. 1971, c. 198 (N.J.S.A. 40A:11-1 et seq.).
D. 
Upon substantial completion of all required street improvements (except for the top course) and appurtenant utility improvements, and the connection of same to the public system, the obligor may request of the governing body in writing, by certified mail addressed in care of the Borough Clerk, that the Borough Engineer prepare, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to Subsection A of this section, a list of all incomplete or unsatisfactory completed improvements. If such a request is made, the obligor shall send a copy of the request to the Borough Engineer. The request shall indicate which improvements have been completed and which improvements remain incomplete in the judgment of the obligor. Thereupon the Borough Engineer shall inspect all bonded improvements covered by obligor's request and shall file a detailed list and report, in writing, with the governing body, and shall simultaneously send a copy thereof to the obligor not later than 45 days after receipt of the obligor's request.
(1) 
The list prepared by the Borough Engineer shall state, in detail, with respect to each bonded improvement determined to be incomplete or unsatisfactory, the nature and extent of the incompleteness of each incomplete improvement or the nature and extent of, and remedy for, the unsatisfactory state of each completed bonded improvement determined to be unsatisfactory. The report prepared by the Borough Engineer shall identify each bonded improvement determined to be complete and satisfactory together with a recommendation as to the amount of reduction to be made in the performance guarantee relating to the completed and satisfactory bonded improvement, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to Subsection A of this section.
E. 
The governing body, by resolution, shall either approve the bonded improvements determined to be complete and satisfactory by the Borough Engineer, or reject any or all of these bonded improvements upon the establishment in the resolution of cause for rejection, and shall approve and authorize the amount of reduction to be made in the performance guarantee relating to the improvements accepted, in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to Subsection A of this section. This resolution shall be adopted not later than 45 days after receipt of the list and report prepared by the Borough Engineer. Upon adoption of the resolution by the governing body, the obligor shall be released from all liability pursuant to its performance guarantee with respect to those approved improvements, except for that portion adequately sufficient to secure completion or correction of the improvements not yet approved; provided that 30% of the amount of the total performance guarantee and safety and stabilization guarantee posted may be retained to ensure completion and acceptability of all improvements. The safety and stabilization guarantee shall be reduced by the same percentage as the performance guarantee is being reduced at the time of each performance guarantee reduction.
(1) 
For the purpose of releasing the obligor from liability pursuant to its performance guarantee, the amount of the performance guarantee attributable to each approved bonded improvement shall be reduced by the total amount for each such improvement in accordance with the itemized cost estimate prepared by the Borough Engineer and appended to the performance guarantee pursuant to Subsection A of this section, including any contingency factor applied to the cost of installation. If the sum of the approved bonded improvements would exceed 70% of the total amount of the performance guarantee, then the Borough may retain 30% of the amount of the total performance guarantee and safety and stabilization guarantee to ensure completion and acceptability of bonded improvements, as provided above, except that any amount of the performance guarantee attributable to bonded improvements for which a temporary certificate of occupancy guarantee has been posted shall be released from the performance guarantee even if such release would reduce the amount held by the Borough below 30%.
(2) 
If the obligor has made a cash deposit with the Borough as part of the performance guarantee, then any partial reduction granted in the performance guarantee pursuant to this subsection shall be applied to the cash deposit in the same proportion as the original cash deposit bears to the full amount of the performance guarantee provided that if the developer has furnished a safety and stabilization guarantee the Borough may retain cash equal to the amount of the remaining safety and stabilization guarantee, the Borough may retain cash equal to the amount of the remaining safety and stabilization guarantee.
F. 
If any portion of the required bonded improvements is rejected, the Borough may require the obligor to complete or correct such improvements and, upon completion or correction, the same procedure of notification, as set forth in this section shall be followed.
G. 
Inspection fees.
(1) 
The obligor shall reimburse the Borough for reasonable inspection fees paid to the Borough Engineer for the foregoing inspection of improvements, which fees shall not exceed the sum of the amounts set forth in Subsection G(1)(a) and (b) of this section. The Borough may require the developer to post the inspection fees in escrow in an amount:
(a) 
Not to exceed, except for extraordinary circumstances, the greater of $500 or 5% of the cost of bonded improvements that are subject to a performance guarantee under Subsection A(1)(a), (b), or both Subsection A(1)(a) and (b) of this section; and
(b) 
Not to exceed 5% of the cost of private site improvements that are not subject to a performance guarantee under Subsection A(1)(a) of this section, which cost shall be determined pursuant to Section 15 of P.L. 1991, c. 256 (N.J.S.A. 40:55D-53.4).
(2) 
For those developments for which the inspection fees total less than $10,000, fees may, at the option of the developer, be paid in two installments. The initial amount deposited in escrow by a developer shall be 50% of the inspection fees. When the balance on deposit drops to 20% of the inspection fees because the amount deposited by the developer has been reduced by the amount paid to the Borough Engineer for inspections, the developer shall deposit the remaining 50% of the inspection fees.
(3) 
For those developments for which the inspection fees total $10,000 or greater, fees may, at the option of the developer, be paid in four installments. The initial amount deposited in escrow by a developer shall be 25% of the inspection fees. When the balance on deposit drops to 10% of the inspection fees because the amount deposited by the developer has been reduced by the amount paid to the Borough Engineer for inspection, the developer shall make additional deposits of 25% of the inspection fees.
(4) 
If the Borough determines that the amount in escrow for the payment of inspection fees, as calculated pursuant to Subsection G(1)(a) and (b) of this section, is insufficient to cover the cost of additional required inspections, the Borough may require the developer to deposit additional funds in escrow provided that the Borough delivers to the developer a written inspection escrow deposit request, signed by the Borough Engineer, which informs the developer of the need for additional inspections, details the items or undertakings that require inspection, estimates the time required for those inspections, and estimates the cost of performing those inspections.
H. 
If final approval is by stages or sections of development pursuant to Subsection a of Section 29 of P.L. 1975, c. 291 (N.J.S.A. 40:55D-38), the provisions of this section shall be applied by stage or section.
I. 
If any of the improvements have been dedicated to the Borough on a subdivision plat or site plan, the governing body shall be deemed, upon the release of any performance guarantee required pursuant to Subsection A of this section, to accept dedication for public use of streets or roads and any other improvements made thereon according to site plan and subdivision plats approved by the approving authority, provided that such improvements have been inspected and have received final approval by the Borough Engineer.
A. 
Off-tract improvements; when required.
(1) 
Any site plan requiring off-tract improvements, as defined herein, shall comply with the provisions of this section.
(2) 
An off-tract improvement shall be one or more required improvements which are necessary for the successful completion of a development in the interest of furthering the public health, safety and general welfare and where said improvements are located off-tract.
(3) 
An off-tract improvement shall be required where either the existing facilities serving the area or subarea are already operating at a deficient level of service, or the inclusion of the new development will make such present level of service deficient according to engineering standards utilized in determining such levels of service.
(4) 
The proportionate contribution of any such off-tract improvement to the applicant shall be reasonably related to the relative benefit or use of the total area so served.
(5) 
Under the conditions of this chapter, off-tract improvements shall be limited to new or improved water distribution; sanitary sewerage disposal system; stormwater and drainage system and facilities and all necessary appurtenances thereto; all public utilities, including required easements, new or improved street and right-of-way widths; traffic regulation and control devices; intersection improvements; public utility relocation; and improvements required by solutions to traffic, circulation and safety factors which are related to the property or properties being developed.
(6) 
Off-tract improvements shall not include the improvement cost for an entire utility system or street system or major segment thereof, including sewerage treatment plants, water supply or treatment facilities or substantial street construction or improvements or other similar undertakings unless said improvements are significantly affected by the property and properties in question or are required for proper development of such property or properties.
B. 
Approving authority determination. Each site plan requiring approving authority approval shall be subject to a determination and findings as follows:
(1) 
That certain off-tract improvements are or are not necessary to implement such site plan.
(2) 
That, in instances where off-tract improvements are required, the terms and conditions which shall be imposed upon the applicant shall ensure the successful and reasonable implementation of the requirement.
(3) 
In the event that the approving authority determines that one or more improvements constitute an off-tract improvement, the approving authority, by resolution, shall notify the governing body of such determination, specifying the approving authority's recommendation relative to the estimated cost of the improvement, the applicant's pro rata share of the cost, other property owners who may benefit from such off-tract improvement and the approving authority's recommendations concerning how such off-tract improvement can be made, what the borough's responsibilities should be and what performance or maintenance guaranties, cash contributions, agreements and other forms of surety should be required of the applicant.
(4) 
Action by an approving authority relating to off-tract improvements shall be deferred until the governing body has had the opportunity to review the recommendation of the approving authority and has made a determination as to whether the borough will accept any obligations concerning such off-tract improvement. The borough shall not be responsible to construct, install or provide off-tract improvements to accommodate the development of an applicant's lands.
(5) 
When an applicant pays the amount determined as its pro rata share of the cost of an off-tract improvement under protest, the applicant shall institute legal action within one year of such payment in order to preserve the right of judicial determination as to the fairness and reasonableness of such pro rata share. No building permit shall be issued until the expiration of said one year period or until such time as the applicant has waived the right to seek such a judicial determination under the provisions of this chapter.
(6) 
The approving authority shall not take any final action concerning a preliminary site plan approval until the applicant and the governing body have entered into an agreement providing for such off-tract improvement and the obligations of the applicant and a copy of the agreement and action of the governing body has been filed with the approving authority.
C. 
Methods of implementation.
(1) 
Performance and maintenance guaranties. Where a performance or maintenance guaranty or other surety is required, concerning an off-tract improvement, the applicant shall be required to follow the same procedure and requirements as set forth in § 231-34 of this chapter.
(2) 
Development agreement. Where a development agreement is required concerning off-tract improvements or other conditions as may be required by this chapter or the approving authority, the developer's agreement shall be made pursuant to § § 231-10 of this chapter. The agreement may specify the amount of cash contributions, if any, the method of payment of such contributions and the time of such payments in relation to any obligations to be undertaken by the borough.
(3) 
Cash contributions.
(a) 
When not required. Cash contributions for off-tract improvements shall not be required under the following conditions:
[1] 
Where state or county agencies or a utility authority have jurisdiction over such off-tract improvement and require a cash contribution, guaranty or other surety of the applicant in lieu of such conditions as the borough may impose; or
[2] 
Where a benefit assessment or other similar levy is imposed upon the applicant and other land owners benefited by such off-tract improvement; or
[3] 
Where the applicant may legally install such improvements in lieu of the borough pursuant to standards and conditions imposed by the borough.
(b) 
Method of payment. Where a cash contribution is required, the contribution shall be deposited with the Borough Treasurer and proof of deposit filed with the approving authority, governing body and Borough Engineer.
(c) 
All such contributions received by the Borough Treasurer shall be deposited into an escrow account for the purpose of the specific off-tract improvement. In the event that such improvements are not initiated or provided for within a period of 10 years from the date of such contribution, the contribution shall be returned to the applicant pursuant to the terms of the applicant's agreement with the borough or, in the event that there is no such agreement, to the owner or owners of the lands being subdivided. In the event that the applicant made a cash contribution and it is later determined that such a contribution should not have been required under the provisions of Subsection C of this section, the contribution shall be returned to the applicant upon such determination.
D. 
Pro rata formula in determining applicant's share of off-tract improvements. Where an off-tract improvement is required, the following criteria shall be used in determining the applicant's proportionate share of the cost of such improvement:
(1) 
Street improvements. New streets, street widening, alignment, correction, channelization of intersections, construction of barriers, new or improved traffic simulization, signs and curbs, street trees and landscaping utility improvements or relocations and other similar street or traffic improvements: the applicant's proportionate share shall be in the ratio of the estimated peak-hour traffic generated by the development of the applicant's land to the sum of the present deficiency in peak-hour traffic capacity of the present road facilities and the estimated peak-hour traffic generated by the applicant's proposed development. The applicant's calculated proportionate share shall then be increased by 10% for contingencies.
(2) 
Sanitary distribution facilities. Sanitary sewer distribution facilities, including the installation, relocation or replacement of collector and interceptor sewers and the installation and relocation or replacement of other appurtenances associated therewith: the applicant's proportionate cost shall be in the ratio of the estimated daily flow of effluent (in gallons) from the proposed development of applicant's lands to the sum of the present deficiency in capacity for the existing system or subsystem and the estimated daily flow from the applicant's proposed developed lands. In the case where the peak flow from the proposed development may occur during the peak flow period from the existing system, the ratio shall be the estimated peak flow rate from the proposed development in gallons per minute to the estimated present peak flow deficiency in the existing system or subsystem and the estimated peak flow rate from the proposed development. The greater of the two ratios thus calculated shall be increased by 10% for contingencies and shall be the ratio used to determine the cost to the applicant.
(3) 
Stormwater and drainage improvements. Stormwater and drainage improvements, including the installation, relocation or replacement of pipes, culverts, catch basins, other appurtenances and retention basins: the applicant's proportionate share shall be determined in the ratio of the estimated peak surface runoff from applicant's developed lands into the existing drainage system measured in cubic feet per second to the sum of the existing peak flow in cubic feet per second deficiency for the existing system and the estimated peak flow from the applicant's lands. The ratio thus calculated shall be increased by 10% for contingencies.