As used in this article, the following terms shall have the
meanings indicated:
APPROVING AUTHORITY
The Planning Board or Zoning Board of Adjustment, as may
be applicable under the circumstances.
CITY CLERK
The Deputy City Clerk as defined in Chapter
3, Article
III, of the City's Code.
CITY ENGINEER
A City staff member or consultant retained by the City, as
is applicable under the circumstances, who holds a degree in civil
engineering from a recognized college of engineering and is licensed
to perform civil engineering services in the State of New Jersey.
FUTURE DEVELOPER
Any subsequent developer who's then proposed development
will directly benefit from the improvement installed or paid for by
the original developer.
IMPROVEMENT
Reasonable and necessary improvement(s) to the City's street(s),
sewerage, or drainage facilities located outside the property limits
of the proposed project.
TRAFFIC STUDY
A traffic impact study prepared by a qualified professional,
licensed by the State of New Jersey, on behalf of an applicant.
The cost of all off-tract acquisition of lands and/or improvements
as contained in this article shall be construed to encompass all costs
including, but not limited to, planning, feasibility studies, surveys,
property and easement acquisition, design, equipment/facilities and
construction. Such costs shall also include all legal, accounting,
surveying, engineering, and other professional costs directly associated
with the improvement(s) contemplated in this article. Such costs may
still further include the cost of eminent domain proceedings, reasonable
contingencies, and costs of financing during construction. All such
costs shall be calculated and set forth, as a condition of approval,
when preliminary major subdivision or site plan approval is granted.