[Amended 9-17-2002 by Res. No. 2002-10; 5-6-2003 by Res. No.
2003-09; 3-1-2005 by Res. No. 2005-04; 11-15-2005 by Res. No.
2005-10A; 2-6-2007 by Res. No. 2007-03; 10-3-2007 by Res. No. 2007-08; 1-5-2009 by Res. No. 2009-01; 11-3-2009 by Res. No.
2009-13A; 2-5-2013 by Res. No. 2013-02; 4-16-2013 by Res. No.
2013-03; 12-3-2013 by Res. No. 2013-08; 8-18-2015 by Res. No. 2015-06; 7-19-2016 by Res. No. 2016-07; 9-18-2017 by Res. No.
2017-09; 11-21-2017 by Res. No. 2017-12; 7-18-2023 by Res. No. 2023-03; 5-21-2024 by Res. No. 2024-02]
A. The following fee schedule is hereby adopted.
(1) Building permits: $70, plus $3 per thousand of construction over
$2,000.
(2) Zoning permits: $70, plus $3 per thousand of construction over $2,000.
(4) Inspection fees: 15% above inspection agency.
(5) Land development: $200, plus engineering fees.
(6) Subdivision: $100 per lot and $150 for lot consolidations.
(7) Major subdivision: $400 first lot; $50 for each additional lot; plus
engineers' cost.
(8) Junkyard license, to be allocated for the type of activity conducted
within the yard (recycling, scrap or salvage):
(b) Any two activities: $300.
(c) All three activities: $400.
(9) Vacating alleys and streets: $350.
(10)
Variance from Zoning Hearing Board: $500.
(12)
Road occupancy permits: $125.
(14)
On-lot sewer permits: $600.
(15)
Inspection of Township roads that are to be bonded:
(a) For each road to be inspected, including the before-bonding and the
after-bonding inspection: $95.
(b) Intermittent inspections of bonded roads (if required): $49.50 for
each additional inspection.
(16)
Food truck permit: $25 annual fee.
(17)
Floodplain management permit: $50.
(18)
Peddling and solicitation permit: $50.
(20) Sign permit: $70 plus $3 per thousand of construction over $2,000.
(21) Certificate of occupancy: $60.
B. Any violations of required permits will result in fees being doubled.
[Added 5-6-2003 by Res. No. 2003-09]
This schedule may be replaced or amended at
any time by resolution of the Board of Supervisors.