[Amended 7-10-2007 by Doc. 76]
The City of Haverhill shall, from time to time,
establish rates for the use of the wastewater treatment facility,
to be recommended by the Superintendent/Engineer and approved by the
City Council and Mayor, to be billed quarterly.
Should the operational, maintenance and capital
costs of the wastewater treatment facility exceed the sums collected,
then in such event, the charges of the use of the wastewater treatment
facility shall be adjusted accordingly.
The City shall comply in all respects to the
rules and regulations governing user charges and industrial cost recovery
for federally assisted projects as set forth in Appendix B.
The surcharge for high concentration wastes
shall be established in accordance with Appendix C.
[Added 10-11-1988 by Doc. 205; amended 2-14-1989 by Doc. 33; 7-25-1989 by Doc. 130; 9-16-2003 by Doc. 135; 1-13-2009 by Doc. 140/08]
A. A fee of $400 per unit will be charged to connect
to the municipal sewerage system. This charge will apply to renovations
and new services.
B. For nonresidential users and multifamily dwellings,
the number of units shall be calculated by dividing the design flow
by 330 gallons per day (gpd), which is the flow generated by a hypothetical
threebedroom single-family residence. The design flow for nonresidential
and multifamily dwellings shall be determined using the sewer system
flow design values found in the most current version of Title IV of
the State Environmental Code (310 CMR 15.000).
[Amended 9-8-2015 by Doc.
109]
[Added 9-7-1976 by Doc. 148; Amended 10-5-1976 by Doc. 165; 5-26-1981 by Doc. 103; 9-29-1981 by Doc. 168-B; 6-26-2001 by Doc. 86-J; 8-27-2002 by Doc. 134-B; 9-16-2003 by Doc. 140]
A. Due dates; late charge.
(1) Domestic accounts: Effective July 1, 2001, the domestic
wastewater accounts will be billed on a quarterly basis commencing
February 1, 2002. Effective October 1, 2003, all bills are due within
30 days of the billing date. After 30 days, account will begin to
accrue 14% interest from the billing date. The billing period for
domestic bills will be August 1, November 1, February 1 and May 1.
NOTE: The August and February bills will be estimated whereas the
November and May will be actual reading.
(2) Quarterly accounts: Effective October 1, 2003, the
quarterly wastewater accounts will be due within 30 days of the billing
date. After 30 days, account will begin to accrue 14% interest from
the billing date. The billing period for quarterly bills will be July
1, October 1, January 1 and April 1.