[Adopted 4-23-1969 by Ord. No. 271, approved 4-23-1969]
[Amended 11-15-1977 by Ord. No. 328, approved 11-15-1977; 8-14-1979 by Ord. No. 338]
A. 
No permit for the construction of any on-site sewage facility shall be issued nor shall any inspection of an on-site sewage facility be made until such time as the applicant for a permit pays to the Borough of West Conshohocken the appropriate fee as specified in the schedule below:
Type of Installation
Fee
Addition or alteration to an existing on-site sewage facility
$75
Installation of an on-site sewage facility for a single-family dwelling having 3 bedrooms or less
$100
Installation of an on-site sewage facility for a single-family dwelling having more than 3 bedrooms
$100
Installation of an on-site sewage facility for an apartment building having 3 residential units or less
$100
Installation of an on-site sewage facility for an apartment building having 4 residential units but no more than 8 residential units
$100
Installation of an on-site sewage facility for light industrial or commercial properties having 25 employees or less
$100
Installation of an on-site sewage facility for a commercial or industrial property having more than 25 employees
$125
Installation of a closed-tank system on any property
$100
Installation of an alternate on-site sewage facility system
$150
B. 
In the event that the on-site sewage facility systems are being installed on separate parcels previously subdivided, an additional fee of $50 per parcel shall be charged over and above the fees stated above.
C. 
In addition to the above initial permit fee for a closed tank system, the applicant will be required to reimburse the Borough for the cost of the Sewage Enforcement Officer's review and inspection during the installation of the system before hookup of the user is permitted.
[Amended 8-14-1979 by Ord. No. 338]
An additional fee of $25 shall be imposed and collected when the inspection of more than one seepage pit is required.
[Added 8-14-1979 by Ord. No. 338]
At the time of application for any of the systems described in § 93-1, a nonrefundable fee of $50 will be paid by the applicant to the Sewage Enforcement Officer. If a permit is issued, this $50 fee will be applied toward the appropriate fee set forth in the schedule in § 93-1 above. However, if the issuance of a permit is not approved, the $50 application fee will not be refunded to the applicant. In the event that a reapplication is made by an applicant for a different type of on-site sanitary sewer system after a prior disapproval of another system, a new application fee must be paid.
[Added 6-14-2005 by Ord. No. 05-04, approved 6-14-2005]
It shall be the responsibility of every property owner whose property contains an on-site sewage facility to maintain their on-site sewage facility in a manner which complies with all Pennsylvania Department of Environmental Protection rules, regulations and standards, all Borough rules, regulations and standards and all West Conshohocken Municipal Authority rules, regulations and standards. In the event either the Borough or the Authority are required to repair, upgrade or replace any on-site sewage facility due to its noncompliance with any applicable rule, regulation or standard, the property owner shall be solely responsible for paying all fees and charges incurred by the Borough and/or the Authority in repairing, upgrading or replacing said on-site sewage facility.