No final plat shall receive final approval unless the
subdivider shall have installed or shall have furnished performance guaranties
in sufficient amount for the ultimate installation or performance of the following
items:
No topsoil shall be removed from the site or used as
soil. Topsoil moved during the course of construction shall be redistributed
so as to provide at least six inches of cover to all areas of the subdivision
and shall be stabilized so as to remain in place.
Water mains, culverts, storm sewers and sanitary sewers
shall be properly connected with the municipal system and shall be adequate
to handle all present and probable future development.
The Board may waive the requirement to install any of
the above specified improvements by resolution, setting forth the reasons
for waiver and noting them in the minutes; provided that such waiver does
not endanger public health, safety and welfare.
All improvements required by the Board shall be subject
to inspection and approval by the City Engineer who shall be notified by the
developer at least 24 hours prior to the start of construction of the same.
No underground installation shall be covered until inspected and approved.