A final plat and supporting drawings and documents
for a proposed subdivision constitute the complete development of
the subdivision proposal and become the basis for the issuance of
building permits, the construction of the subdivision and the inspection
service by the Township.
The final plat shall be drawn in accordance with the requirements for preliminary plats specified in §
85-13 and the Map Filing Law. The final plat shall show or be accompanied by the same information required for preliminary plat approval in addition to the following:
A. Tract boundary lines, exterior lines of streets, easements
and other rights-of-way, existing facilities, watercourses, street
names, land reserved or dedicated to public use, all lot lines and
other site lines, with accurate dimensions, bearing or deflection
angles, and radii, arcs and central angles of all curves, based on
an actual survey by a land surveyor licensed to practice in the State
of New Jersey.
B. At least one corner of the subdivision shall be tied
to Township Topographic Data.
C. Cross section, profiles and established grades of
all streets as approved by the Township Engineer.
D. Plans and profiles of all storm and sanitary sewers
and water mains as approved by the Township Engineer.
E. No plat shall receive final approval unless the Tax
Collector of the Township shall have certified that no taxes (including
rollback taxes) or assessments for local improvements are due or delinquent
on the property for which the subdivision application has been made.