[Adopted 3-4-1986]
No building permit shall be issued for the construction of a building which would necessitate the use of water therein unless a supply of water is available therefor either from a water system operated by a City, Town or district or from a drilled well located on the land where the building is to be constructed or from a water corporation or company as defined in MGL c. 165, § 1.