In all other portions of the PUD, the landowner
shall provide and maintain consistent buffer areas measuring 100 feet
wide from Route 17 and 50 feet wide from East Allendale Road. A variable
buffer area may be provided along Boroline Road provided that the
buffer area averages 25 feet wide and is in no place less than 15
feet wide and that, where an improvement will be closer to Boroline
Road than 25 feet, the finished grade on site shall be at least three
feet below the elevation of Boroline Road.
[Amended 5-19-1997 by Ord. No 97-650-C; 12-15-1997 by Ord. No. 97-659-C] |
Location
|
Distance
(feet)
|
---|---|
The front of one building to the front of another
building
|
75
|
The front of one building to the side of another
building
|
75
|
The front of one building to the rear of another
building
|
80
|
The side of one building to the side of another
building (other than an attached unit)
|
25
|
The side of one building to the rear of another
building
[Amended 5-19-1997 by Ord. No. 97-650-C] |
40
|
The rear of one building to the rear of another
building
|
60
|
Low- and Moderate- Income Housing
|
Assisted Living, Extended Stay Hotel,
Corporate Offices, Research and Bank Facilities
| |
---|---|---|
Land use distribution
|
25-35%
|
65-75%(*)
|
Minimum number of low/moderate-income housing
units
|
70
|
----
|
Maximum number of units per acre
|
10 (for the residential portion of the PUD)
|
30 (for the assisted living portion of the PUD)(*)
|
Maximum floor area ratio
|
---
|
0.30 (for each lot devoted to the above uses)
|
(*) Provided that the area devoted to assisted
living facilities shall not exceed four acres, the number of assisted
living units in the PUD shall not exceed 120 and the number of assisted
living beds shall not exceed 140.
|
Percent of Total Development
| |
---|---|
Other PUD Development
(percent floor area)
|
Low- and Moderate-Income Housing Development
(percent dwelling units)
|
0-33%
|
0%
|
34-66%
|
Proof of financing, construction permit and
start of construction on the residential units or other performance
guarantee satisfactory to the Planning Board and to COAH
|
67-100%
|
100%
|