The applicant shall construct all streets, together
with all other improvements, including but not limited to grading,
paving, curbs, gutters, sidewalks, streetlights, fire hydrants, water
mains, street signs, shade trees, storm drainage facilities, sanitary
sewers, landscaping, traffic control devices, open space and restricted
areas and erosion and sediment control measures, in conformance with
the final plan as approved, the applicable provisions of the PennDOT
Specifications, Publication 408, latest edition and other applicable
regulations.
Within 60 days after completion and borough
approval of subdivision or land development improvements as shown
on final plans and before borough acceptance of such improvements,
the developer shall submit to the Council a plan showing actual locations,
dimensions and conditions of streets and all other public improvements,
including easements showing geometry and monument locations certified
by a registered engineer to be in accordance with actual construction.
As-built plans shall show elevations and inverts to all manholes,
pipes and roads.