No action, other than an exempt, excluded or Type II action,
shall be carried out, funded or approved by any agency, board, body
or officer of the Village unless it has complied with SEQR, Part 617,
to the extent applicable, and this chapter.
Exempt actions, in addition to those listed in Part 617, include:
A. Maintenance or repair involving no substantial changes in an existing
structure or facility.
B. Enforcement and criminal proceedings.
C. Actions which are immediately necessary on a limited emergency basis
for the protection or preservation of life, health, property or natural
resources.
Excluded actions are those undertaken, funded or approved prior
to the effective dates set forth in SEQR (November 1978).
Type I actions, most likely to require preparation of an EIS,
in addition to those listed in Part 617, are:
A. Adoption of a change by the Village Board in the use within a residential
district affecting 10 or more acres of the district by authorizing
nonresidential use.
B. Granting of a zoning change or variance at the request of an applicant for an action that meets or exceeds one or more of the thresholds listed in Subsections
C and
D.
C. Construction of new residential units which meet or exceed the following
thresholds:
(1) Six units not to be connected at commencement of habitation to a
municipal or publicly owned water system, sewerage system or sewerage
treatment facility.
(2) Twenty-five units to be connected at commencement of habitation to
a municipal or publicly owned water system, sewerage system or sewerage
treatment facility.
D. Construction of nonresidential facilities which meet or exceed any
of the thresholds listed in this section or expansion or conversion
of existing nonresidential facilities by more than 50% of the thresholds
listed in this section, including:
(1) A project or action involving the physical alteration of three acres.
(2) A project or action which would use water from any source in excess
of 20,000 gallons per day.
(4) A facility with more than 15,000 square feet of gross floor area.
E. Any project or action which exceeds 25% of any threshold in this
section occurring substantially contiguous to public parkland, recreation
area or designated open space.
F. Any action which takes place substantially contiguous to any critical
environmental area.
The waters of Greenwood Lake shall be considered a critical
environmental area.