Exemptions and Submission Requirements
| |
---|---|
New Impervious Area1, 2
(square footage)
|
Applicant Must Provide
|
0 to less than 5,000
|
No submission is required3
|
5,000 and greater
|
Rate controls, volume controls and SWM site plan
|
NOTES:
| |
---|---|
1
|
New impervious area since the date of adoption of this chapter.
|
2
|
Gravel in existing condition shall be considered pervious and
gravel in proposed condition shall be considered impervious.
|
3
|
The small project stormwater management application included
in Appendix E[1] shall be used to document new impervious surface.
|