[R.O. 2008 § 406.110; Ord. No. 5376 § 1, 9-25-2008; Ord. No. 6506, 10-11-2018]
It shall be unlawful for any person
to perform any excavation or to direct the performance of any excavation
within the corporate limits of the City of O'Fallon without first
having contacted the notification center established pursuant to Sections
319.010 through 319.050, RSMo., and having given the center at least
forty-eight (48) hours to contact the member utilities for appropriate
marking of utility lines, cable or facilities.
[R.O. 2008 § 406.120; Ord. No. 5376 § 1, 9-25-2008; Ord. No. 6506, 10-11-2018]
A. It shall be unlawful for any person to
perform any excavation or to direct the performance of any excavation
within the corporate limits of the City of O'Fallon which shall in
any way disturb, move, cut or damage any public utility line, cable
or facility.
B. The provisions of this Section shall not
apply to any publicly owned or regulated utility which is repairing
or replacing any of its own facilities which does not affect other
utilities, lines or facilities.
[R.O. 2008 § 406.130; Ord. No. 5376 § 1, 9-25-2008; Ord. No. 6506, 10-11-2018]
A. It shall be unlawful for any person to
perform any excavation or to direct the performance of any excavation
within the corporate limits of the City of O'Fallon within an area
designated as a utility or pipeline easement for a hazardous pipeline
without having first obtained a permit from the Engineering Department.
Any permit required pursuant to this Section shall be requested from
the Engineering Department at least three (3) working days, but not
more than ten (10) working days, before performing any excavation.
B. All other provisions of the code must be met, including Sections
400.250 and
405.015.