[Ord. No. 2000-46 §1(31-02), 4-10-2000; Ord. No. 2002-142 §1(31-02), 10-14-2002; Ord. No. 2012-08 §1, 2-27-2012]
A. The
City of Chillicothe adopts the following schedule of fees for building
permits, inspections and plan reviews:
1. Permit fees required. Permit fees shall be based
on the estimated construction cost using the current version of the
International Code Council/Building Valuation Date (BVD) using a regional
multiplier of 0.84 and a fee multiplier of 0.00235. Construction cost
shall include total value of all construction work, including materials
and labor, for which the permit is being used, such as gas, mechanical,
plumbing equipment, and permanent systems. The Building Official shall
make the final determination of value.
The building permit fees are in addition to the other fees and
charges by the City.
2. Building permit fees. See Subsection
(4) of this Section.
|
Other inspections and fees:
|
|
a.
|
Inspections outside of normal business hours
|
$50.00 per hour* (minimum charge — one hour)
|
|
b.
|
Reinspection fees
|
$50.00 per hour* (minimum charge — one-half hour)
|
|
c.
|
Inspections for which no fee is specifically indicated
|
$50.00 per hour* (minimum charge — one-half hour)
|
|
d.
|
Additional plan review required by changes, additions or revisions
to plans
|
$50.00 per hour*
|
|
e.
|
For use of outside consultants for plan review and inspections,
or both
|
Actual costs**
|
|
*Or the total hourly cost to the City, whichever is the greatest.
This cost shall include supervision, overhead, equipment, hourly wages
and fringe benefits of the employees involved.
|
|
**Actual costs include administrative and overhead costs.
|
|
The following are exceptions from the above fees:
|
|
Exceptions: Building permits for the following
structures shall be based on the valuation of on-site work only, with
a two hundred fifty dollar ($250.00) investigation fee:
|
|
(1)
|
Manufactured homes containing a Housing and Urban Development
(HUD) certification; or
|
|
(2)
|
Modular homes built in compliance with current local building
codes.
|
3. Plan review fees.
a. When submittal documents are required by the Building Official and
plan review is required, a plan review fee shall be paid. Said plan
review fee shall be ten percent (10%) of the building permit fee.
The plan review fees are separate fees from the permit fees and are
in addition to the permit fees.
b. A site plan will be required for all new construction projects, including
accessory buildings and fences. The site plans shall be drawn to scale
and show the following: drawing scale, north arrow, dimensions from
property lines and adjacent streets, and dimensions of the proposed
construction. The site plan shall be submitted with the building permit
application.
4. Fixed fees.
|
Permit Fee Schedule (revised 2/22/2012)
|
|
Building Permits
|
|
New Construction —
|
|
Fee is based on current version of International Code Council
Building Valuation Data (BVD), using a regional multiplier of 0.84
for Chillicothe and a fee multiplier of 0.00235. There is a twenty-five
dollar ($25.00) minimum fee.
|
|
Building permit fee = Square footage of building x cost/sf from
BVD table x 0.84 x 0.00235.
|
|
Remodeling —
|
|
Residential fee is $5.00 / $1,000.00 of construction cost. There
is a twenty-five dollar ($25.00) minimum fee.
|
|
Commercial fee is $6.00 / $1,000.00 of construction cost. There
is a fifty dollar ($50.00) minimum fee.
|
|
Digging permit
|
$30.00
|
|
Work in public right-of-way
|
$500.00 Deposit
|
|
Sign permit
|
|
|
|
$0.25/sf
|
$30.00 minimum
|
|
|
Promotional banners, no fee, but permit required
|
|
Demolition permit
|
$30.00
|
|
Fence permit
|
$20.00
|
|
Concrete flatwork permit
|
|
|
|
Small slab < 100sf
|
$20.00
|
|
|
Driveway or slab > 100sf
|
$50.00
|
|
Pool permit
|
$20.00
|
|
Roofing permit
|
$30.00
|
|
Manufactured home/moving permit
|
$50.00
|
|
Home occupation permit
|
$30.00
|
|
Grading/storm drainage permit
|
|
|
|
Commercial
|
$100.00
|
|
|
Residential
|
$30.00
|
|
Plan review
|
10% of permit fee
|
|
Applications:
|
|
|
|
Variance
|
$100.00
|
|
|
Conditional use
|
$100.00
|
|
|
Zoning change
|
$150.00
|
|
Plats and site development:
|
|
|
|
Preliminary plat
|
$250.00
|
|
|
Final plat
|
$25.00/lot
|
|
|
PUD initial review fee
|
$250.00
|
|
|
Cluster development
|
$250.00
|
|
No reduction in fees will be permitted without approval of the
City Council.
|
5. Certificate of occupancy. A certificate of occupancy
will not be issued until all inspections have been performed and approved
and all permit and inspection fees paid. Occupation or use of a building
or area prior to receiving a certificate of occupancy is prohibited.
Any person or persons occupying or using a building or area prior
to receiving a certificate of occupancy shall be guilty of an ordinance
violation, and subject to a fine up to five hundred dollars ($500.00),
with each day of occupancy to be a separate offense.
6. Miscellaneous.
a. Payment of fees. A permit shall not be issued until
the fees prescribed by the City of Chillicothe have been paid.
b. Work commencing before permit issuance. If work
of which a permit is required by the Code has been commenced without
first obtaining a permit, a special investigation shall be made before
a permit may be issued for the work. An investigation fee shall be
collected and is in addition to the required permit fee, and will
be equal to the permit fee.
c. Fee refunds. The Building Official may authorize
refunding of any fees paid hereunder which was erroneously paid or
collected.
The Building Official may authorize refunding of not more than
eighty percent (80%) of the permit fee or plan review fee paid when
no work has been done under a permit issued.
The Building Official shall not authorize refunding of any fee
paid except on written application filed by the original permittee.
No refund will be authorized if the permit expires.
d. Re-inspections. A re-inspection fee may be assessed
for each inspection or re-inspection when such portion of work for
which inspection is called for is not complete when corrections called
for are not made.
In instances where re-inspections fees have been assessed, no
additional inspections of the work will be performed until the required
fees have been paid.
e. Expiration. All permits shall expire after one hundred
eighty (180) days from the date of the permit, unless specifically
noted on the permit by the Building Official. If a permit expires,
a new permit shall be obtained, and the fee therefore shall be one-half
(½) the amount required for a new permit for such work, excluding
plan review fee, and provided no changes have been made or will be
made in the original plans and specifications for such work.
The Building Official may grant, in writing, one (1) or more
extensions of time for periods not more than one hundred eighty (180)
days each. The extension shall be requested in writing and justifiable
cause demonstrated.
f. Expiration of plan review. Applications for which
no permit is issued within one hundred eighty (180) days following
the date of application shall expire by limitation, and plans and
other data submitted for review may thereafter be returned to the
applicant or destroyed by the Building Official. In order to renew
action on an application after expiration, the applicant shall resubmit
plans and pay a new plan review fee. In the event of a hardship and
at the discretion of the Building Official a new plan review fee may
be waived.
g. Chillicothe Municipal Utilities (CMU) utility connections.
CMU shall be contacted for connection and inspection of the
following:
Electric — Distribution system to and including the meter
base.
Sanitary Sewer — Connection to sewer main and service
line to within five (5) feet of the building to be served.
Water — Distribution system to and including the water
meter.
CMU has separate fees for these connections and inspections.