[1]
Editor’s Note: The title of this article was changed from “Inspectional Services Fees and Fines” to “Building Department Fees and Fines” 5-20-2019 by FMC-2019-8.
A. 
Structural code administrator review fee: $120.
B. 
Structural code administrator review prior to application: $120.
C. 
Review of revised/corrected plans: $120.
D. 
Architectural review fee: $50.
E. 
Building Inspector review fee: $50.
F. 
Electrical review fee: $50.
G. 
Plumbing review fee: $50.
H. 
Public works/site development review fee: $50.
I. 
Technical review fee: at cost.
A. 
Building: $50.
B. 
Electrical: $50.
C. 
Plumbing: $50.
D. 
Public works/site development: $50.
[1]
Editor’s Note: The title of this section was changed 6-4-2018 by FMC-2018-12.
A. 
Building: $50.
B. 
Electrical: $50.
C. 
Plumbing: $50.
D. 
Public works/site development: $50.
[1]
Editor’s Note: The title of this section was changed 6-4-2018 by FMC-2018-12.
A. 
Building: $50.
B. 
Electrical: $50.
C. 
Plumbing: $50.
A. 
Up to $19,999 construction cost: $50, plus inspection fees.
(1) 
Plus per $1,000 over $5,000: $6.
B. 
Twenty thousand dollars to $50,000 construction cost: $125, plus inspection fees.
(1) 
Plus per $1,000 over $20,000: $5.
C. 
Over $50,000 construction cost: $290, plus inspection fees.
(1) 
Plus per $1,000 over $50,000: $5.
A. 
First renewal:
(1) 
Under $20,000 construction cost: $50.
(2) 
Over $20,000 construction cost: $100.
B. 
Second renewal:
(1) 
Under $20,000 construction cost: $100.
(2) 
Over $20,000 construction cost: $500.
Occupancy permit: $50.
Demolition permit: $100, plus inspection fees.
Fence permit: $50, plus inspection fees.
A. 
Plumbing permit for first five fixtures: $50, plus inspection fees.
B. 
Charge for each additional fixture after five: $10.
Plumbing permit for swimming pool: $100, plus inspection fees.
A. 
Electrical signs other than electronic message centers/digital sign: $50, plus inspections fees.
B. 
Electronic message centers/digital signs: $90, plus inspection fees.
A. 
Residential: includes existing and new construction for both single- and multifamily dwellings.
(1) 
New service: $50, plus inspection fees.
(2) 
Change of service drop: $50, plus inspection fees.
(3) 
Temporary service drop (six-time limit): $50, plus inspection fees month.
(4) 
Air conditioner: $50, plus inspection fees.
(5) 
Furnace: $50, plus inspection fees.
(6) 
A fee will be charged of $5 per room, including basement, garage, storage, walk-in closet, mud room, enclosed porch, attic, entry or foyer, crawl space, or any other room designation or classification. Minimum permit fee: $50, plus inspection fees.
A. 
Examination of plans and specifications: $50.
B. 
Electrical inspection: $50.
A. 
Remodeling commercial: under $10,000 in cost:
(1) 
Review fee: $50.
(2) 
Permit fee: $150 plus inspection fees.
B. 
Remodeling commercial: $10,000 and over in cost:
(1) 
Review fee: $50.
(2) 
Permit fee: $250, plus inspection fees.
C. 
New commercial: under $500,000 in cost:
(1) 
Review fee: $100.
(2) 
Permit fee: $250, plus inspection fees.
D. 
New commercial: $500,000 and over in cost:
(1) 
Review fee: $100.
(2) 
Permit fee: $500, plus inspection fees.
Elevator inspection fee: $50.
Elevator permit fee: $90.
[Amended 11-3-2014 by FMC-2014-3; 10-16-2017 by Ord. No. FMC-2017-6]
Barbershop/beauty shop inspection fee: $125.
[Amended 11-3-2014 by FMC-2014-3; 10-16-2017 by Ord. No. FMC-2017-6]
Food handling establishments inspection fee: $125.
[Amended 11-3-2014 by FMC-2014-3; 10-16-2017 by Ord. No. FMC-2017-6]
Sanitarian inspection/reinspection fee: $125.
No warning lights fine: $50.
Failure to repair unsafe streets fine: $50.
Fine for violating building code: $100 to $750.
Fine for violating electrical code: $100 to $750.
Fine for violating food handling provisions: $100 to $750.
Deposit for public property: $250.
Deposit for streets or public property opening: $250.[1]
[1]
Editor’s Note: Former §150-7-28, Registration fee for vacant buildings, was repealed 9-16-2019 by FMC-2019-13.