Public works permit - driveway: $50, plus inspection fees.
Public works permit - excavation: $50, plus inspection fees.
Site development permit: $50, plus inspection fees.
Site development inspection: $50.
Plan review for construction: $50.
Inspection for construction: $50.
Permit to store construction materials on streets or sidewalks:
$15.
Weedy lots (per hour; two hour minimum): $50.
Engineering services: at cost.
The fee in lieu of detention provided in Section 1.420 of the
Stormwater Management Code shall be $2 per cubic foot of detention
needed, as approved by the Director of Public Works.
Public works inspection (sewer connection): $50.
Public works inspection (water connection): $50.
[Added 2-17-2020 by FMC-2020-2]
A. Application
fee to co-locate on an existing utility pole or wireless support structure:
$650.
B. Application
fee to consolidate more than one small wireless facility on existing
utility or support structure. Each small wireless facility: $350.
C. Application
for each small wireless facility requiring a new utility pole: $1,000.
D. All fees under this §
150-8-15 are nonrefundable.