In order to more effectively evaluate subdivision and/or land development proposals and other projects, an applicant shall be required to disclose the environmental consequences or effects of such proposals through the submission of an Environmental Impact Assessment (EIA) Report. The EIA report is intended to provide the Township with the information to objectively evaluate potential adverse impacts of a project, and most importantly, to require a mitigation of adverse impacts. The EIA report shall be a means of insuring that the Purposes of § 200-3 of the Union Township Zoning Ordinance are met, and that existing features and conditions are not destroyed or degraded. The EIA report is also intended to better address the environmental protection objectives set forth in the Pennsylvania Municipalities Planning Code and Article I, § 27 of the Constitution of the Commonwealth of Pennsylvania.
B. 
An EIA report shall be submitted for the following except to the extent it may involve a minor subdivision:
(1) 
Any application for preliminary plan approval of proposed land development in the C, SR, VC, HC, HI and Q/L District as set forth in the Union Township Zoning Ordinance [Chapter 200], involving 30 or more lots, 30 or more dwelling units, or any development in these Districts creating new public improvements.
(2) 
Any application for conditional use or special exception as per the Union Township Zoning Ordinance [Chapter 200].
C. 
A revised EIA report shall be provided if requested by the Board if there is a material change in the plan or application.
D. 
The EIA report shall contain text, tables, maps and analyses which document the probable impact resulting from the proposed subdivision and/or land development, and the mitigation proposed to offset the impacts, in accordance with the format and content outline specified below.
E. 
Seven copies of the EIA report shall be submitted. Within the EIA report, specific emphasis shall be directed toward the proposed project's effects on and relationship to applicable site, neighborhood (including areas in adjacent townships where applicable) and Township-wide resources, conditions or characteristics. Unless otherwise noted, the mapping required below shall be drawn at a scale of one inch equals 50 feet. However, when a lot is 25 acres or more, the mapping required below may be drawn at a scale of one inch equals 100 feet scale, when acknowledged by the Planning Commission. The EIA report shall address the following:
(1) 
An identification of the site location and area through the use of a location map drawn at a scale of not more than 2,000 feet to the inch. The location map shall depict all streets, adjoining properties, zoning district boundaries, municipal boundaries and watercourses within 2,500 feet of any part of the tract. In the case of development of a section of the entire tract, the location map shall also show the relationship of the section to the entire tract.
(2) 
An identification of the site character and appearance through the presentation of color photographs or copies thereof. Such photographs shall provide a representation of what the site looks like from the ground. Photographs should be properly identified or captioned and shall be keyed to a map of the site.
(3) 
A land development plan including notes pertaining to the number and type of lots or units, the square footage and/or acreage of the lot(s) and a depiction of the features which are proposed such as streets, driveways, parking areas, building and other structures, and all impervious surfaces. The plan shall reflect all the information required under the plan requirements of the Union Township Subdivision and Land Development Ordinance, Article IV.
(4) 
A statement indicating the proposed type of ownership of the lot and, where applicable, the type of ownership, operation and maintenance proposed for areas devoted to open space or otherwise not under the control of a single lot owner.
(5) 
A statement indicating the proposed staging or phasing of the project and a map depicting the boundaries of each stage or phase of the project by site area, buildings and timing. Such boundaries shall be superimposed on a version of the land development plan.
(6) 
An identification of physical resources associated with the natural environment of the lot. The identification of physical resources shall include a narrative description of each of the resources as referenced in the definition. These resources shall also be mapped as specified in § 172-56E, and may be either incorporated into the EIA report or submitted as attachments to the report.
(a) 
A map depicting the topographical characteristics of the lot. Such map shall contain contours with at least two foot intervals and shall depict slopes ranging from: 0% to 15%, 15% to 25%, and greater than 25%.
(b) 
A map depicting the soils of the lot. Such map shall depict all soil types and shall include a table identifying soil characteristics pertinent to the proposed project, such as depth of bedrock, depth of water table, flood hazard potential, and limitations for septic tank filter fields.
(c) 
A map depicting the hydrological characteristics of the lot. Such map shall depict: surface water resources, watersheds and floodplains. Surface water resources include features such as creeks, and other streams, ponds, lakes, and other natural bodies of water, springs, wetlands, and any man-made impoundments.
(7) 
An identification of biological resources associated with the natural environment of the lot. The identification of biological resources shall include a narrative description of each of the resources as referenced in the definition. These resources shall also be mapped as specified in § 172-56E and may be either incorporated into the EIA report or submitted as attachments to the report.
(a) 
A map depicting the vegetation characteristics of the lot. Such map shall define the locations and boundaries of the woodlands of the tract their species. All trees 12 inches in DBH or greater shall be accurately located on the map either as freestanding trees or as tree masses.
(b) 
Any Pennsylvania Natural Diversity Index (PNDI) site as defined by the Pennsylvania Department of Environmental Protection.
(c) 
The big woods portion of Union Township.
(8) 
An identification of the land use conditions and characteristics associated with the lot(s). The identification of land use conditions and characteristics shall include a narrative description of the above. In addition, the following maps drawn at a scale as specified in § 172-56E shall be incorporated into the EIA report or submitted as attachments to it.
(a) 
A map depicting the land cover characteristics of the lot(s). Such map shall define existing features, including: paved or other impervious surfaces, woodlands, open-areas, and the like. Such map shall also indicate any past use or disturbance to the land which may affect the proposed project, such as a landfill, a hazardous waste disposal area, or other similar condition.
(b) 
A map depicting any encumbrances to the lot(s). Such map shall define easements, rights-of-way and other areas where certain use privileges exist.
(c) 
A map depicting the land uses adjacent to the proposed lot(s). Such map may be at the same scale as the location map.
(9) 
An identification of the historic resources such as areas, structures and/or routes and trails which are significant. Areas, structures and/or routes and trails included on such registers and inventories as: the National Register of Historic Places; the Pennsylvania Inventory of Historic Places; the Historic American Building Survey; and the Comprehensive Plan shall be identified. The identification of historic resources shall include a narrative description of the above. In addition, a map drawn at a scale as specified in § 172-56E depicting historic resources shall be incorporated into the EIA report or submitted as an attachment to the report.
(10) 
An identification of the community facility needs associated with the users and/or residents of the proposed project. The community facility needs assessment shall indicate in narrative form the type of services which will be in demand. Where applicable, community facilities (such as schools, park and recreation areas, libraries, hospitals, and other health care facilities, fire protection, police protection, ambulance, and rescue services) shall be discussed in terms of the ability of existing facilities and services to accommodate the demands of future users and/or residents of the lot(s) and the need for additional or expanded community facilities.
(11) 
An identification of the utility needs associated with the users and/or residents of the proposed project. The utility needs assessment shall indicate in narrative form the type of installations which will be in demand. Utilities (such as those used for water supply, sewage disposal, refuse disposal, storm drainage, communications and electrical transmission) shall be discussed in terms of: the ability of existing utility installations to accommodate the demands of the future users and/or residents of the property; the need for additional or expanded utility installations; the ability to achieve an adequate, potable quantity of water whenever individual wells are proposed; the ability to achieve an adequate system for on-site sewage disposal whenever such a system is proposed; and the ability to achieve an adequate system for storm drainage and stormwater management.
(12) 
An identification of the relationship of the transportation and circulation system needs of the proposed project to the existing street or highway network. A discussion of this relationship shall be in narrative form and shall indicate factors such as methods to be used for traffic control within the lot(s) and at points of ingress to and egress from it; and expected traffic volumes generated from the project, including their relationship to existing traffic volumes on existing streets for both peak hour and non-peak hour traffic conditions. In addition, there shall be a discussion of the physical condition of existing streets which will service the proposed project and what improvements are proposed to remedy any physical deficiencies within the site.
(13) 
An identification of the demographic characteristics related to the proposed project. The characteristics, which shall be presented in narrative form, shall include a profile of the future users and/or residents of the lot(s), including information such as the number of people expected. Such information shall be related to initial and completed project conditions.
(14) 
An identification of the economic and fiscal characteristics related to the proposed project. The characteristics, which shall be presented in narrative form, shall include a profile of the Township, county and school district revenues which the proposal may generate and the Township, county and school district costs it may create. Such information shall be related to initial and completed project conditions.
(15) 
An identification of characteristics and conditions associated with existing, construction-related, and future conditions pertaining to such matters as: air and water quality; noise levels; vibration; toxic materials; electrical interference; odor; glare and heat; fire and explosion; smoke; dust; fumes; vapors and gases; and radioactive materials.
(16) 
Measures to mitigate adverse effects. To indicate such measures, the applicant shall submit exhibits or diagrams which will depict the type of remedial, protective and mitigative measures described in narrative form, and alternatives. These measures and alternatives shall include those required through existing procedures and standards, and those unique to a specific project, as follows:
(a) 
Mitigation measures which pertain to existing procedures and standards are those related to current requirements of the state, county, and/or Township for remedial or protective action such as: sedimentation and soil erosion control, stormwater runoff control, water quality control, air quality control, and the like.
(b) 
Mitigation measures related to impacts which may be unique to a specific project are those related to efforts such as: revegetation; screening; buffering; fencing; berming; emission control; traffic control and/or traffic enhancement; noise control; relocation or reduction of buildings, lots, or units, redesign of the site, roads, buildings, lots, or units; land acquisition, and the like.
F. 
In making its evaluation, the Board of Supervisors and/or the Planning Commission may request any additional information it deems necessary to adequately assess potential environmental impacts. Further, whenever any information required in §§ 172-56E(6) to 172-56E(15) above is not applicable to the proposed project, the applicant shall indicate such inapplicability in the narrative of the EIA report, and state why such information is considered to be inapplicable in the case of the particular subdivision or land development in question.
G. 
The EIA report shall be prepared by a professional engineer, registered architect, registered landscape architect, or certified planner on behalf of an applicant.