[Amended 4-13-2020; 4-10-2023; 9-26-2023; 4-24-2024]
Upon the approval of an application for a building permit, the following fees shall be payable to the Village of Mamaroneck:
A.
Initial review. The following fees must be paid upon the submission of an application for a building permit:
(1)
Intake review by staff
$150
(2)
Intake review by third-party consultant
$300
B.
Building permit: amount of fees. The amount of fees payable under this subsection shall be determined by rates per $1,000 of the cost of construction, additions, alterations, temporary construction, or moving of a building as determined by the Building Inspector and certified upon completion of construction and are as follows:
(1)
Residential permits:
$100 plus $20/each additional $1,000 value
6-month renewal application fee
50% of the original fee
(2)
Commercial permits:
$200 plus $35/each additional $1,000 value
6-month renewal application fee
50% of the original fee
C.
Changes in approved plans — residential
$150
D.
Changes in approved plans -- commercial
$350
E.
Demolition permit:
(1)
Residential permits
$100 plus $20/each additional $1,000 value
(2)
Commercial permits
$200 plus $35/each additional $1,000 value
F.
Work without a permit. Failure to obtain a building permit or demolition permit or to pay the fee noted hereinabove prior to taking action associated with the permit or fee shall double the fee.
Same
G.
Certification letter in lieu of a certificate of occupancy:
H.
Certificate of occupancy:
(1)
Per residential unit (includes co-ops), addition or structure:
$200
(2)
Per retail or commercial unit:
$350
(3)
Temporary C of O — Residential (good for up to 90 days max)
$100
(4)
Temporary C of O -- Commercial (good for up to 90 days max)
$200
I.
Certificate of completeness or compliance:
(1)
Per residential unit (includes co-ops), addition or structure:
$125
(2)
Per retail or commercial unit:
$250
J.
Other inspections/permits
(1)
Residential inspection fee (first and second)
$85
(2)
Residential inspection fee (for third and each inspection thereafter)
$175
(3)
Commercial inspection fee (first and second)
$170
(4)
Commercial inspection fee (for third and each inspection thereafter)
$350