[Added 8-14-84 by Ord. No. 84-8]
This Article shall be known as and may be cited as the "Flag Lot Ordinance of the Township of Montague."
As used in this Article, the following terms shall have the meanings hereinafter set forth:
FLAG LOT
A lot the building area of which fronts upon a flag lot right-of-way rather than on or abutting a public street or road, and having access thereto over, upon and across a private flag lot right-of-way.
FLAG LOT BUILDING AREA.
The area of a flag lot consisting of at least twice the minimum lot area required for a conventional lot in the zone district in which the flag lot is to be located, and excluding therefrom all lands lying within the flag lot right-of-way, but including the lands lying within the 50 foot front yard, 50 foot side yards and 50 foot rear yard of such lot. The term "flag lot building area" shall be deemed to constitute the portion of flag lot intended for the construction of the dwelling house or other principal building, and other accessory buildings or permitted structures, provided that the foregoing shall not be deemed to permit any accessory building or other structure in the front yard of such flag lot building area or flag lot right-of-way giving access thereto.
FLAG LOT BUILDING LINE
A line projected across a flag lot building area between the side lot lines substantially parallel to the edge of the flag lot right-of-way at the minimum setback distance from the edge of such flag lot right-of-way as would be required for setback from a public street in the event of conventional subdivision in the applicable zone.
FLAG LOT DEPTH
The distance between the edge of the flag lot right-of-way and the rear line of the flag lot building area. The "flag lot depth" shall be not less than the minimum lot width required for a conventional lot in the applicable zone district.
FLAG LOT FRONTAGE
The distance between the side lot lines of the flag lot building area measured along the edge of the flag lot right-of-way.
FLAG LOT RIGHT-OF-WAY
The portion of a flag lot between the right-of-way of the public street, and the flag lot side line most remote from the public street, having a minimum width of 50 feet along the entire length thereof, giving access to the building area of such flag lot. No accessory buildings or other structure (other than driveways, fences and perimeter walls) shall be permitted within the "flag lot right-of-way."
FLAG LOT RIGHT-OF-WAY FRONTAGE
The distance between the side lot lines of the flag lot right-of-way measured along the edge of the public street.
FLAG LOT WIDTH
The distance between the side lot lines of the building area measured along the minimum building setback line applicable in the zone.
REAR LINE OF FLAG LOT
The line of the flag lot building area opposite from the flag lot right-of-way.
YARD, FRONT
An open space extending across the full width of the flag lot building area, the depth of which shall be not less than 50 feet measured horizontally between the nearest point of the flag lot right-of-way line and the nearest part of the principal building. No accessory buildings shall be permitted in a flag lot front yard, unless expressly permitted by the Planning Board at the time of conditional use review and subdivision, or thereafter upon appropriate application to the Board of Adjustment. The flag lot front yard shall be deemed to be the yard abutting the flag lot right-of-way, unless otherwise determined by the Planning Board in conjunction with its conditional use review at the time of subdivision.
YARD, REAR
An open space extending across the full width of the flag lot building area, the depth of which shall be not less than 50 feet measured horizontally between the nearest part of the principal building and the nearest point of the rear line of the flag lot. Accessory structures may be located in the rear yard of a flag lot in accordance with the provisions of this chapter only if so permitted by the Planning Board at the time of its conditional use review and subdivision, or thereafter upon appropriate application to the Board of Adjustment.
YARD, SIDE
An open space extending from the front yard to the rear yard between the principal building and the side lot lines. The width of the required side yard shall be not less than 50 feet measured horizontally from the nearest part of the principal building and the nearest point of the side line of the flag lot building area. Accessory structures in accordance with the provisions of this chapter shall be permitted in the "side yard" of the flag lot building area more remote from the public street, but such accessory buildings and structures shall not be permitted in the "side yard" of the flag lot building area more proximate to the public street unless so permitted by the Planning Board at the time of its conditional use review and subdivision, or thereafter upon appropriate application to the Board of Adjustment.
Flag lots shall be permitted as a conditional use in the R-1, R-2 and R-3 Zone Districts upon the applicant's showing that such use in the specified location will comply with the conditions, standards and definitional requirements for flag lots contained in this Article and all other applicable ordinances of the Township of Montague, and upon the issuance of an authorization therefor by the Planning Board.
All applications for the subdivision of lands into one or more flag lots shall be deemed applications for major subdivisions, and the preliminary subdivision plat and the final subdivision plat therefor shall conform to the requirements for plot plan details in the case of major subdivisions, other than with respect to such plot plan details as may be expressly waived by the Planning Board in individual cases for good cause shown.
The flag lot building area of each flag lot created shall be at least twice the minimum lot area required for a conventional lot in the zone district in which the flag lot is to be located, exclusive of land lying within the flag lot right-of-way.
Each flag lot shall have access to an existing public street by way of a private flag lot right-of-way which shall constitute a portion of the flag lot. Such flag lot right-of-way shall have a width of not less than 50 feet fronting on such public street and shall be not less than 50 feet in width from its point of intersection with the street to its point of intersection with the rear line of the flag lot right-of-way so created. No structures other than driveways, fences or lot perimeter walls shall be constructed on such flag lot right-of-way.
Flag lots may be created only upon the express finding by the Planning Board that subdivision of a portion of the lands into flag lots is in conjunction with an overall development plan for the entire tract of which the flag lot is a part, and no remaining portion of the subject tract shall, as a result of flag lot subdivision, become landlocked or not practically feasible of development. The developer shall demonstrate a need, consistent with good planning principles, for the creation of flag lots and shall further demonstrate that normal subdivision techniques in accordance with the requirements of the zone are not practical or feasible because of topography, unusual shape or land configurations or other physical characteristics of the land related to the proposed development concept. The developer shall additionally demonstrate that the proposed location, topography and physical conditions of the land lying within the confines of the flag lot right-of-way are sufficient to permit the installation and maintenance of any access driveway within the confines of the flag lot right-of-way suitable for uninterrupted access to the proposed location for the construction of the principal structure within the flag lot building area by conventional and emergency vehicles at all times of the year.
A. 
The preliminary major subdivision plat depicting the proposed subdivision of any flag lot shall include the following plot plan details and information:
(1) 
Existing and proposed topography at two-foot contour intervals within the fifty-foot wide flag lot right-of-way.
(2) 
The proposed location and width of the proposed driveway within the flag lot right-of-way, together with a center-line profile of the entire length of the driveway, from its point of intersection with the public street traversing the flag lot right-of-way and into the flag lot building area to the flag lot building line or the proposed location for the construction of the principal structure within the flag lot building area, whichever is greater.
(3) 
A center-line profile of the entire length of the proposed driveway showing the existing and proposed profile plotted at five-foot vertical and fifty-foot horizontal intervals.
(4) 
Drainage improvements needed based upon the proposed driveway profile at the intersection of the public street and along such proposed driveway or, alternatively, an affirmative certification by the developer's engineer that no such drainage improvements are needed.
(5) 
Slight triangle profiles form a point in the center line of the proposed driveway 15 feet from the edge of the traveled way of the public street, provided that, in the event that the width of the traveled way shall be less than 30 feet, such sight triangle profile shall be from a point in the center line of the proposed driveway located 30 feet from the center line of the existing traveled way of such public street.
(6) 
The proposed base course and wearing surface of the proposed driveway, the same to be in accordance with the standards for flag lot driveways prescribed in § 60-47 of this Article.
(7) 
Proposed erosion control measures for any side slopes along the proposed driveway, or alternatively, an affirmative certification by the developer's engineer that no erosion control measures are required.
(8) 
Setback dimensions to all existing dwellings and structures on all adjacent lots located on the same side of the public street as the proposed development and within a four-hundred-foot perimeter of any proposed flag lot.
B. 
The Planning Board shall be empowered to grant a planning waiver with respect to any of the aforesaid plot plan details [except the detail required by Subsection A(8) of this section] upon the affirmative finding that, based upon testimonial evidence, engineering certifications or field inspections, the location, topography and physical conditions of the land lying within the flag lot right-of-way area obviously sufficient to permit the installation and maintenance of an access driveway in the proposed location in accordance with the standards of § 60-47 of this Article.
All flag lots to be created shall conform to the following:
A. 
The flag lot building area shall be deemed to "front" on such flag lot right-of-way, and the required "lot width" of the flag lot building area abutting such flag lot right-of-way shall be measured along the edge of such flag lot right-of-way, which "lot width" shall be the lot width required at the street line in such zone or, if none is required, the minimum lot width required at the building setback line in such zone. Except as required in Subsection G of this section, all other bulk requirements of the appropriate zone district in which the lands are situated shall relate to such flag lot right-of-way as though the same were a public street, provided that improvements constructed on such flag lot building area need not be oriented to such flag lot right-of-way as though the same were a public street.
B. 
The flag lot building area shall be entirely on one side of the flag lot right-of-way.
C. 
Such flag lot shall not be further subdivided, nor may the flag lot right-of-way be used as access to any other lot or tract of land, unless all improvements required by the Land Subdivision Ordinances for the installation of a public street have been installed, including the construction of a street or road leading from the public street to all lots proposed to be served, which street shall meet all of the design and construction standards for a Class B Road set forth in the Land Subdivision Ordinance. The prohibition against further subdivision of any such flag lot shall be assured by appropriate notations of the final major subdivision plat, by a duly recorded deed of restrictive covenants, or by such other means as may be reasonably required by the Planning Board.
D. 
The lot depth (measured from the edge of the flag lot right-of-way to the opposite lot line) shall be not less than the requirement for the minimum lot width at the building setback line applicable to a conventional lot in such zone district.
E. 
Not more than one flag lot shall be permitted for each adjacent or abutting standard lot having a minimum lot width at the street right-of-way line applicable in such zone or, if not applicable, having a minimum lot width at the building setback line applicable in such zone.
F. 
No two flag lot rights-of-way shall abut except in the case of circumstances which require abutting flag lot rights-of-way by reason of the topographical or other physical constraints of the land.
G. 
The minimum distance form any structure to any lot line (exclusive of permitted accessory buildings, driveways, fences or perimeter walls) shall be 50 feet, except in the case of structures or improvements adjacent to the flag lot right-of-way not less than the minimum distance required for front yard setback applicable in the zone.
The final major subdivision plat depicting the subdivision of lands which include the subdivision of any flag lot shall include the following plot plan details and information:
A. 
Final topography at two-foot contour intervals within the fifty-foot wide flag lot right-of-way.
B. 
The final width of the proposed or completed driveway within the flag lot right-of-way, together with a center-line profile of the entire length of the driveway, from its point of intersection with the public street traversing the flag lot right-of-way and into the flag lot building area to the flag lot building line or the proposed location for the construction of the principal structure within the flag lot building area, whichever is greater.
C. 
A center-line profile of the entire length of the proposed driveway showing the final proposed or completed profile plotted at five foot vertical and 50 foot horizontal intervals.
D. 
Final drainage improvements, together with any easements relating thereto.
E. 
Final sight triangle profiles, together with appropriate restrictions against the obstruction of such sight triangles, by notation on the final major subdivision plat or duly recorded restrictive covenants, as may be reasonably required by the Planning Board.
F. 
The final proposed or installed base course and wearing surface of the proposed driveway.
G. 
The final approved erosion control measures and the final side slopes along the proposed or completed finally approved driveway.
H. 
Any limitations imposed by the Planning Board with regard to the future installation or principal or accessory structures, together with appropriate means for enforcement of such limitations, by notations on the final major subdivision plat or in a duly recorded deed of restrictive covenants, as may be reasonably required by the Planning Board.
I. 
Such additional and further final major subdivision plat details as may be required by the Planning Board or the Township Engineer.