Fees have been established by the Borough in the fee resolution which is adopted from time to time by Borough Council to defray plan review and construction inspection costs incurred by the Borough. All fees listed in §
94-602A shall be paid by the applicant at the time of SWM site plan submission or as otherwise directed by the Borough.