Fees have been established by the Borough in the fee resolution which is adopted from time to time by Borough Council to defray plan review and construction inspection costs incurred by the Borough. All fees listed in § 94-602A shall be paid by the applicant at the time of SWM site plan submission or as otherwise directed by the Borough.
A. 
The fees required of the applicant by this chapter shall at a minimum cover:
(1) 
Administrative costs;
(2) 
The review of the SWM site plan by the Borough, the Municipal Engineer and other municipal consultants;
(3) 
Coordination and meetings with the applicant;
(4) 
The inspection of erosion and sediment control measures, BMPs, conveyances and other related improvements during construction;
(5) 
Review of project communications, reports, and additional supporting information;
(6) 
Other site inspections;
(7) 
The final inspection upon completion of the BMPs, conveyances, and other stormwater management facilities and related improvements presented in the SWM site plan; and
(8) 
Review of final as-built plan submission and revised calculations, and inspections as needed.
B. 
The applicant shall also reimburse all expenses incurred by the Borough for any additional work or municipal consultant fees required to enforce any permit provisions regulated by this chapter, correct violations, and ensure proper completion of remedial actions.