After the effective date of this article, no person shall cause
or permit the connection of any pipe or conduit or cause the development
or diversion of any brook, ditch or other waterway to any storm sewer,
catch basin or other appurtenances thereof or cause the diversion
of any rain- or surface water by pipe or other conduit to the public
roads and streets within the Borough of Allendale, except in conformance
with the regulations herein contained.
All piping and connections to sewers must be inspected by the
Borough Engineer or his designated agent before being covered. On
completion of the work, the applicant must give the Engineering Department
two certified prints of the work performed as installed.
Upon the finding that an unsafe or unsanitary condition exists
as the result of discharge of effluent and upon notification, in writing,
by the Chief of Police, Superintendent of Public Works, Borough Engineer
or Sanitary Inspector, the owner of property shall correct such condition
or stop the discharge within 24 hours.
The minimum requirements hereinabove set forth shall be applicable
to subdivisions, though the procedure herein required shall not apply
thereto.
The owner of the property on which water service is furnished
shall be liable for the payment of water-service-related charges incurred
prior to November 30, 2022, in accordance with the laws of the State
of New Jersey, such charges to be a lien on the premises until paid
and satisfied, irrespective of whether or not the unpaid charges were
incurred prior to or during such owner's period of ownership,
and in case of nonpayment thereof, the premises may be sold to pay
and satisfy the same in the manner provided by law.
No person, firm or corporation shall fill a pool having a capacity
of more than 10,000 gallons with water from the public water supply
system unless he or it shall have obtained a permit therefor from
the Borough. The Borough Council may by resolution adopt regulations
for the issuance of such permits and for the filling of pools by persons
holding such permits in order to prevent the imposition of excessive
demand upon the water system. No person, firm or corporation shall
fill a pool between October 1 and March 31 in any year.
No person, firm or corporation shall drill, sink, dig or otherwise
create a well, nor shall any existing but unused well be placed in
operation, unless notice thereof has first been given to the Borough,
together with such information with respect thereto as the Borough
may require.
For each and every violation of any provision of this article, the consumer, owner, firm, company, contractor or other persons interested as agents or employees or any other persons who commit, permit, allow, take part or assist in any violation of this article, who fail to comply with any requirements of this article or who shall maintain any building or premises or uses on land where a violation of this article shall exist, shall, for each and every violation, be punished as provided in §
1-18 of Chapter
1, General Provisions. Each and every day that such violation continues shall be considered a separate and specific violation of this article.
This article shall take effect immediately and upon publication
as required by law.
This chapter shall be enforced by the Police Department, Borough
Engineer and other Code Officials of or contracted by the Borough
of Allendale.