A recycled water customer shall receive recycled water service
in compliance with this chapter.
[Amended by Res. 2475, 10-26-2015; Res. 2587, 2-2-2021]
A customer obtaining permanent recycled water service for property
located within the district shall pay the monthly water rates set
forth below based upon the size of the meter serving the property.
This charge is to offset the cost of providing facilities to serve
the customer and shall be paid whether the customer takes delivery
of water or not.
Meter Size
|
Commencing with Meter Reads on or after:
|
---|
3-1-2021
|
1-1-2022
|
1-1-2023
|
1-1-2024
|
1-1-2025
|
---|
3/4"
|
$28.79
|
$31.10
|
$33.59
|
$36.28
|
$39.19
|
¾” x 1”
|
$28.79
|
$31.10
|
$33.59
|
$36.28
|
$39.19
|
1"
|
$46.31
|
$50.02
|
$54.03
|
$58.36
|
$63.03
|
1-1/2"
|
$90.09
|
$97.30
|
$105.09
|
$113.50
|
$122.58
|
2”
|
$142.64
|
$154.06
|
$166.39
|
$179.71
|
$194.09
|
3"
|
$309.03
|
$333.76
|
$360.47
|
$389.31
|
$420.46
|
4"
|
$554.24
|
$598.58
|
$646.47
|
$698.19
|
$754.05
|
6"
|
$1,403.71
|
$1,516.01
|
$1,637.30
|
$1,768.29
|
$1,909.76
|
8"
|
$2,454.60
|
$2,650.97
|
$2,863.05
|
$3,092.10
|
$3,339.47
|
10"
|
$3,680.64
|
$3,975.10
|
$4,293.11
|
$4,636.56
|
$5,007.49
|
[Amended by Res. 2475, 10-26-2015; Res. 2587, 2-2-2021; Res. 2617, 1-17-2023]
(a) Each
recycled water customer shall pay a commodity charge for water delivered
through each meter in a monthly period based on the class of customer,
tier allotments, and the elevation zone within which the customer’s
property is located as follows.
(b) The
District establishes individualized water budgets for each recycled
water customer based on irrigated area, evapotranspiration rate, and
adjustments. Water budgets are calculated as indicated below:
Billing Period Water budget = (evapotranspiration rates) times
(plant factor) times (square feet of irrigated area) times (drought
factor) times (# days in billing period)
|
Tier allotments for recycled water customers are determined
by irrigated areas and evapotranspiration rates.
Recycled Water
|
---|
Tier 1
|
Efficient
|
Total Water Budget
|
Tier 2
|
Inefficient
|
Over 100% to less than 150%* of Total Water Budget
|
Tier 3
|
Excessive
|
150%* or more of Total Water Budget
|
Total Budget = Efficient Outdoor
|
Notes:
|
*During Activation of Stage 4 of the Water Shortage Contingency
Plan, Excessive Tier starts at 120%
|
(c) Each
customer shall pay a charge for the units of water delivered to offset
the cost of delivery, as follows:
|
Commencing with meter reads on or after:
|
---|
3-1-2021
|
1-1-2022
|
1-1-2023
|
1-1-2024
|
1-1-2025
|
---|
Tier 1
|
$1.24
|
$1.34
|
$1.45
|
$1.57
|
$1.70
|
Tier 2
|
$2.61
|
$2.82
|
$3.05
|
$3.30
|
$3.57
|
Tier 3
|
$4.97
|
$5.37
|
$5.80
|
$6.27
|
$6.78
|
(d) Each
customer shall pay a charge for each unit of water delivered to offset
the cost of pumping as follows:
Zone
|
Commencing with meter reads on or after:
|
---|
1-1-2016
|
1-1-2017
|
1-1-2018
|
1-1-2019
|
1-1-2020
|
---|
LV Valley
|
$0.00
|
$0.00
|
$0.00
|
$0.00
|
$0.00
|
Western System/Calabasas
|
$0.30
|
$0.33
|
$0.36
|
$0.39
|
$0.43
|
[Amended by Res. 2475, 10-26-2015; Res. 2548, 3-12-2019]
(a) A monthly readiness to serve charge shall be paid for each temporary meter to offset the cost of providing facilities to serve the customer and shall be paid following the installation of the meter and regardless of whether the customer takes delivery of water or not. Temporary potable water meter charges are calculated by multiplying the potable rate for the same size meter in Section
4-4.102 by 1.5.
(b) The
monthly volume charge for recycled water delivered through temporary
meters shall be 150% of the Tier 4 recycled water rates for the site
where the temporary meter is connected.
(c) An
installation fee set forth in Section 7-1.107(a) of this Code shall
be paid prior to installation of the temporary meter by district staff.
In addition, a meter deposit of set forth in Section 7-1.107(b) of
this Code shall be required prior to installation of the meter. Such
meter deposit will be refunded, net any costs incurred by the district
relative to the temporary meter.
(d) Prior
to the installation of the temporary meter, the customer shall be
required to pay a deposit in an amount sufficient to guarantee the
payment of twelve months of water bills as estimated by the General
Manager. Such deposit will be refunded, net any costs unpaid to the
district for recycled water usage.