The developer shall supply all necessary surveys to
establish the road according to line and grade as shown on approved
plans and set necessary grade stakes for the road builder's use.
A final level survey shall be made by the developer
and the original approved tracing be replotted to show the actual
grades in addition to the approved grades originally shown.
The road shall be guaranteed for one year by the developer
and road builder for workmanship and materials, after acceptance by
the Village Manager or his duly designated representative.