Prior to connection of any individual industrial user to the town sewer system the industrial user must agree to the following conditions:
A. 
Install pretreatment system to reduce discharge constituents to those outlined in Article III.
B. 
Install and maintain metering equipment as specified by the Mayor and Council.
C. 
Install and maintain facility for sampling of discharge and/or effluent from pretreatment facility as specified by the Mayor and Council.
D. 
Allow for inspection and sampling by the Town of Georgetown personnel or independent testing laboratory personnel as selected by the Mayor and Council, at a sampling period satisfactory to the Mayor and Council.
E. 
Pay a surcharge as specified by the Mayor and Council which shall be established in accordance with the surcharge provisions of the adopted user charge system.
All industrial users will be routinely checked for SS, BOD, DO and coliform and other constituents as deemed appropriate by the town.
The metering equipment, facilities and sampling period may vary for each industrial user depending upon the type of waste and type of processing and pretreatment. The unit charges to be established per the Surcharge Provisions of the adopted User Charge System will be established by the Mayor and Council and will apply to all industrial users.
The Town Manager or other duly authorized employees are authorized to obtain information concerning industrial processes which have a direct bearing on the kind and source of discharge to the wastewater collection system. The industry may withhold information considered confidential but must release all information related to the types and quantities of constituents proposed to be discharged. The industry must understand that the revelation to the public of the information in question might result in an advantage to competitors.