Prior to connection of any individual industrial
user to the town sewer system the industrial user must agree to the
following conditions:
A. Install pretreatment system to reduce discharge constituents to those outlined in Article
III.
B. Install and maintain metering equipment as specified
by the Mayor and Council.
C. Install and maintain facility for sampling of discharge
and/or effluent from pretreatment facility as specified by the Mayor
and Council.
D. Allow for inspection and sampling by the Town of Georgetown
personnel or independent testing laboratory personnel as selected
by the Mayor and Council, at a sampling period satisfactory to the
Mayor and Council.
E. Pay a surcharge as specified by the Mayor and Council
which shall be established in accordance with the surcharge provisions
of the adopted user charge system.
All industrial users will be routinely checked
for SS, BOD, DO and coliform and other constituents as deemed appropriate
by the town.
The metering equipment, facilities and sampling
period may vary for each industrial user depending upon the type of
waste and type of processing and pretreatment. The unit charges to
be established per the Surcharge Provisions of the adopted User Charge
System will be established by the Mayor and Council and will apply
to all industrial users.
The Town Manager or other duly authorized employees
are authorized to obtain information concerning industrial processes
which have a direct bearing on the kind and source of discharge to
the wastewater collection system. The industry may withhold information
considered confidential but must release all information related to
the types and quantities of constituents proposed to be discharged.
The industry must understand that the revelation to the public of
the information in question might result in an advantage to competitors.