There is hereby imposed a quarterly water availability charge for each improved lot or parcel within the corporate limits of the Town of Georgetown which is not connected to the town's public water supply system, to be paid by the owner of said lot or parcel.
The water availability charge shall be as pursuant to § 98-5.
As used in this article, the following terms shall have the meanings indicated:
IMPROVED LOT OR PARCEL
That lot or parcel upon which a residential, commercial, industrial or other structure or use exists, whether inhabited or uninhabited.
For purposes of this article, a lot or parcel is not connected to the town's public water supply system unless:
A. 
Actual use of the system occurs and payment for that use takes place.
B. 
All portions of the water supply system on the lot or parcel, which have or normally have corresponding wastewater disposal facilities, receive water from the town's public water supply system.
The water availability charge imposed by this article shall be collected by the Town Manager by any legal means available for the collection of charges due the Town of Georgetown.