The Planning Board will be available at any
regularly scheduled meeting for informal discussion with any person
who wishes to subdivide land.
[Amended 12-16-2003 by Ord. No. O-3-43; 8-20-2013 by Ord. No. O-13-23]
A. Within three years of securing preliminary approval, the developer shall file with the administrative officer a complete application package as documented on the
Application Checklist. All items listed under Section 1 — Administrative Completeness Requirements, of the
Application Checklist must be submitted or the package will be deemed incomplete. The checklist is attached in this chapter. Failure to apply for final subdivision approval within
three years of preliminary approval will cause said preliminary approval
to be deemed void. The duration of final approval shall be as set
forth in N.J.S.A. 40:55D-52.
B. The final plat shall be accompanied by letters directed to the Chairman
of the approving authority and signed by a responsible officer of
the water company, sewer authority, and utility which provides gas,
telephone and electricity that has jurisdiction in the area. Such
letters shall approve each proposed utility installation design and
stating who will construct the facility.
C. The final plat shall be accompanied by a statement by the Municipal
Engineer that he is in receipt of a map showing all utilities and
other improvements (both in the development and off-tract improvements)
in exact location and elevation, that he has examined the drainage,
erosion, stormwater control, and excavation plans and found that the
interests of the Township and of nearby properties are fully protected,
and that the subdivider has posted a performance guarantee in accordance
with this chapter and the preliminary plat approval for all improvements.
D. Final approval shall be granted or denied within 45 days after submission
of a complete application for final approval to the administrative
officer or within such further time as may be consented to by the
applicant. Failure of the approving authority to act within the period
prescribed shall constitute final approval and a certificate of the
administrative officer as to the failure of the approving authority
to act shall be issued on request of the applicant, and it shall be
sufficient in lieu of the written endorsement or other evidence of
approval herein required. Whenever review or approval of the application
by the County Planning Board is required, the approving authority
shall condition any final approval that it grants upon timely receipt
of a favorable report on the application by the County Planning Board
or approval by the County Planning Board by its failure to report
thereon within the required time period.
E. The approving authority may, in appropriate instances and for good
cause demonstrated by the applicant, condition its final approval
of a site plan or major subdivision upon the subsequent submission
of required performance and/or maintenance guarantees, developer's
agreements and outside agency approvals.
F. In the event that a development adjoins or includes existing Township streets that do not conform to the widths as shown on either the Master Plan or Official Map or the street width requirements as set forth in §
188-118E of this chapter, additional land along both sides of said streets, sufficient to conform to the right-of-way requirements, shall be anticipated in the subdivision design by creating oversized lots to accommodate the widening at some future date. The additional land necessary to accommodate the widening shall be offered to the Township for the location, installation, repair and maintenance of streets, drainage facilities, utilities and other facilities customarily located on street rights-of-way and shall be shown on the plat as dedicated for street widening purposes. If the subdivision is along one side only, 1/2 of the required extra width shall be anticipated and dedicated. In the event that the developer determines to record the subdivision in the Monmouth County Clerk's office by way of a deed of subdivision rather than recording the approved plat, the developer shall provide for the dedication of lands for street widening purposes by way of an appropriate deed of easement to the Township. Any such deed of easement shall be subject to the review and approval of the Township Attorney and the Township Engineer. Any recording costs occasioned by such deed of easement shall be borne by the developer.
G. A completed checklist in a form as adopted by the Township.
H. Upon receipt of final subdivision approval, the applicant shall be required to post with the Township Clerk an amount equal to the estimated cost of revising the Municipal Tax Map to reflect such approval. No construction permit shall be issued in connection with such subdivision approval unless such cost shall have been posted with the Township Clerk in accordance with this section. The amount posted by the applicant shall be placed by the Township in an escrow account and that portion of the cost which remains unused after the Tax Map has been revised shall be refunded to the applicant. As to every major subdivision approved, it shall also be the responsibility of the applicant to provide a reduced-scale map of the subdivision to the same scale as the Township Tax Map. The amount required to be posted for final major subdivisions shall be as set forth in Chapter
139, Fees.
[Amended 7-13-2010 by Ord. No. O-10-16; 8-20-2013 by Ord. No.
O-13-23]
No development application shall be accepted unless submitted in plat form, and no plat shall be accepted for consideration unless it conforms to the
Application Checklist as to form, content and accompanying information, and
complies with the provisions of N.J.S.A. 46-23-1 et seq. (Map Filing
Law), as amended. All plats shall be drawn by a land surveyor as required by law, licensed to practice in the State of New Jersey, and shall bear the signature, seal, license number and address of the land surveyor except that plate submitted under the preliminary discussion provisions of §
188-101 and sketch plats of minor subdivisions and minor site plans are exempt from this requirement. All drawings of improvements shall be signed and sealed by a licensed professional engineer of the State of New Jersey. These plats shall contain a legend setting forth the names and addresses of all individuals or entities as set forth in §
188-105. The following shall also be provided:
A. Soil percolation tests requirements.
(1) Soil percolation tests shall be performed for all developments containing
buildings that at the time of construction will not be connected to
a public sewage disposal system.
(2) Soil percolation tests shall be made in accordance with applicable
state and local regulations and shall be performed in the presence
of a member of the Monmouth County Board of Health; it shall be the
applicant's responsibility to arrange said percolation test with the
Monmouth County Board of Health.
(3) Percolation tests shall be performed at the location or locations
of the proposed on-site sanitary sewage disposal facility or facilities
throughout the tract being developed.
(4) The applicant shall submit a detailed report of the results of the
tests at the time of minor subdivision or the preliminary application.
(5) The results of the soil percolation tests shall be analyzed by the
Planning Board considering the characteristics of the tract being
developed and the general area surrounding the tract being developed,
and the final location of all improvements on the tract shall be based
on said analysis.
B. The zoning requirements applicable to the preliminary approval first
granted and all other rights conferred upon the developer pursuant
to the Municipal Land Use Law, whether conditionally or otherwise, shall not be changed
for a period of two years after the date of final approval. If the
developer has followed the standards prescribed for final approval,
the approving authority may extend such period of protection for extensions
of one year, but not to exceed three extensions. Upon granting of
final approval, the rights conferred upon the application by the granting
of preliminary approval shall be terminated upon final approval.
C. In the case of a subdivision of 150 acres or more, the approving
authority may grant the rights referred to in the above subsection
for such period of time, longer than two years, as shall be determined
by the approving authority to be reasonable taking into consideration
the number of dwelling units permissible under final approval, economic
conditions and the comprehensiveness of the development. The developer
may apply for thereafter, and the approving authority may thereafter
grant, an extension of final approval for such additional period of
time as shall be determined by the approving authority to be reasonable
taking into consideration the number of dwelling units permissible
under final approval, the number of dwelling units remaining to be
developed, economic conditions and the comprehensiveness of the development.
D. The granting of preliminary plat approval shall not confer on the
applicant any rights to construct improvements prior to final approval.
E. Existing and proposed streams, lakes, ponds, and marsh areas accompanied
by the following data:
(1) When a running stream with a drainage area of 1/2 square mile or
greater is proposed for alteration, improvement, or relocation, or
when a structure or fill is proposed over, under, in or along such
a running stream, evidence of approval, required alternations, lack
of jurisdiction, or denial of the improvement by the New Jersey Division
of Water Policy and Supply shall accompany the plat.
(2) Cross sections and profiles of watercourses at an appropriate scale
showing the extent of the flood fringe area, top of bank, normal water
level and bottom elevations at the following locations:
(a)
All watercourses within or adjacent to the development and at
any point where a watercourse crosses a boundary of the development
(profile and cross sections).
(b)
At fifty-foot intervals for a distance of 500 feet upstream
and downstream of any existing or proposed culvert or bridge within
the development (cross section).
(c)
At a maximum of one-hundred-foot intervals, but at no less than
two locations, along each watercourse which runs through or adjacent
to the development (cross section).
(d)
When ditches, streams, brooks, or watercourses are to be altered,
improved or relocated, the method of stabilizing slopes and measures
to control erosion and siltation during construction as well as typical
ditch sections and profiles shall be shown on the plat or accompany
it.
(3)
The total upstream acreage in the drainage basin of any watercourse
running through or adjacent to a development. For flowing streams,
small-scale watershed maps developed from USGS sheets shall be submitted.
(4)
The total acreage in the drainage basin to the nearest downstream
drainage structure and the acreage in that portion of the development
which drains to the structure.
(5)
The location and extent of all existing or proposed drainage
and conservation easements and flood hazard area and floodway lines.
(6)
The location, extent and water level elevation of all existing
or proposed lakes or ponds on or within 300 feet of the development.
(7)
Plans and computations for any storm drainage systems including
the following:
(a)
All existing or proposed storm sewer lines within or on lands
or roads adjacent to the development and for all required off-site
and off-tract drainage improvements showing size, profile and slope
of the lines, direction of flow, and the location of each catch basin,
inlet, manhole, culvert, and headwall.
(b)
The location and extent of any proposed dry wells, groundwater
recharge basins, detention basins, flood control devices, sedimentation
basins or other water conservation devices.
F. An itemization of all improvements to be made to the site as required in Article
XV and such other improvements on site, off site and off tract as the public interest may require, together with a listing of the work and materials to be used in installing such improvements, including estimated quantities of necessary materials, sufficient to enable the Municipal Engineer to formulate a performance guarantee estimate.
G. If the development is planned to be constructed in phases, the developer
is required to submit a phasing plan to the Board.
H. The following standardized plat symbols are to be used on all plats that are submitted to the
Planning Board, Board of Adjustment or Environmental Commission when
depicting the following items which are required to be shown upon
plats submitted to the aforementioned boards or commission:
(1)
A perennial stream shall be depicted upon the plat as a series
of irregular lines periodically interrupted by a series of three dots.
(2)
An intermittent stream shall be depicted upon a plat by an irregular
line periodically broken by a single dot.
(3)
A wetlands area shall be depicted upon the plat by using the
standard symbol for a depression and placing inside the depression
area the standard symbol for marsh or tree symbol or other standard
symbol showing the type of growth located within the wetlands area.
(4)
The boundary of transition zones shall be depicted by using
the standard depression symbol.
(5)
A ridgeline separating two different watersheds shall be depicted
by an irregular, slightly wider line, broken at regular intervals
by an "X."
(6)
A ridgeline that is contained entirely within the bounds of
one watershed and constitutes a subbasin shall be depicted by an irregular
line separated by smaller lines that are angled 90° off the main
line.
(7)
If a fifth line is used to depict contour lines at ten-foot
vertical intervals, the fifth line shall be darker and wider and will
be determined to be an intermediate contour line.
I. Data standards.
(1)
This data standard has been established to manage both hardcopy
(paper) and electronic data submittals required by the Township of
Howell. These standards are part of the comprehensive Township initiative
to best manage, inventory and utilize information. This subsection
contains the submittal standards for planning application data. The
data submittals will be divided into the following two categories:
application documents and design documents. Within these groups data
will be submitted in either paper copy or electronic copy as outlined
in these standards.
(2)
The Township of Howell intends to move toward the elimination
of paper copy documents and as such intends to eliminate paper processes,
where appropriate, which are obsolete or redundant.
(3)
Standard electronic format for application documents.
(a)
File type. The required format is an archival standards compatible
portable document format (PDF/A) file generated directly from document
files. They should be compatible with the latest Adobe Acrobat version
readers.
[1]
Scanned images of report text are not acceptable as the text
cannot be searched.
[2]
Scanned correspondence bearing the original signature and seal
shall be included.
[3]
Scanned documents will only be accepted when the native electronic
files are not available or developed for the application.
(b)
File naming. Application documents and report file names should
be named utilizing a reasonable descriptive naming convention.
(c)
Font should be those commonly available such as Times New Roman
or Arial. Other fonts may not readily open or print from all computers.
Less common fonts that are used (for instance ESRI symbols) must be
embedded to allow printing in all environments.
(d)
Security settings must be set so as to allow searching of text,
printing at full resolution, adding comments (to facilitate electronic
comment by reviewers, and for users to annotate their own copies if
they wish), content copying and extraction (to facilitate preparation
of management direction, and quoting of materials in other documents),
making changes related to document assembly to allow users to rotate
pages and create bookmarks and thumbnails to facilitate use of the
document.
(e)
Resolution. Minimum resolution for scanned documents shall be
in accordance with the New Jersey Division of Archives and Records
Management (NJDARM) as per N.J.A.C. 15:3.4.
(f)
Cartography. Information on maps should be easily understood
when reproduced in black and white. Sole reliance on color to convey
information means maps cannot be faxed or usefully printed in black
and white. Where color is necessary or useful, it should be combined
with techniques like line coding and patterned fills to ensure all
users can extract the information. This principle applies also to
labels and other layers added to images.
(g)
Submissions must be on current accepted media.
(h)
All digital media shall be provided with the following label
data on both the media and media container:
[1]
Township of Howell, tax block, and lot number.
(4)
CAD file standards.
(a)
Computer-aided design (CAD) is a tool used for producing design
documentation and plan sets required for the planning application
process. It can also provide a common medium of information exchange.
In fact, the true power and potential of CAD is the ability to reuse
and share the information contained within the CAD document. The key
to realizing this potential is common organizing principles and standards
for the production and dissemination of CAD information. The standard
organization of files, layers and entities, as well as standardized
software applications is essential for effective work and communication.
(b)
This subsection establishes performance standards for CAD data
provided to the Township of Howell with the application package. The
Township of Howell does not intend to influence the methods or means
of practice of outside consultants. Consultants may use any CAD system
to develop design documents as long as the delivered data conforms
to the Township's CAD data standards.
(c)
Much of the CAD data created through the planning process will
be utilized to update the Township tax maps and brought into the Township
and/or county GIS parcel data system. Data received by the Township
of Howell must follow these CAD data standards to be readily useful
within that system.
(d)
Electronic CAD files for minor subdivisions, final site plans
and final subdivisions shall be submitted in conformance with the
standards listed below:
[1]
CAD drawings. Consultants shall deliver, at minimum, a CAD document
in electronic format to the Township of Howell. The document(s) must
include all supporting CAD data and must be delivered as follows:
[a] In the native CAD format as read only.
[b] In the CAD "dwg" file format.
[c] Using the data structure defined by these standards.
[d] No externally referenced data is permitted. All
data referenced must be included in the file submitted.
[e] File naming shall comply with the standards established
for application documents.
[2]
Text and fonts. Utilize only industry-wide supported fonts,
no custom fonts can be accepted. All fonts shall be provided with
CAD file.
[3]
Layers. Specific layers shall be created and drawings organized
in conformance with the most current naming convention developed by
the New Jersey Digital Tax Map Task Force; see http://www.state.nj.us/treasury/taxation/lpt/digitaltaxmaps.shtml.
[4]
When possible, proposed lots, easements and rights-of-way shall
be comprised of closed polygons.
[5]
Easement and parcel boundaries shall be coincident in the CAD
file when coincident on ground.
[6]
All drawings shall be unrotated and created at 1 to 1 "full
scale."
[7]
Coordinate reference. All submittals, paper and digital, shall
be in NAD 83 (current) New Jersey State Plane Coordinates in U.S.
Survey Feet and North American Vertical Datum 1988 (current) and in
accordance with all other provisions of P.L. 1960, c. 141 (N.J.S.A.
46:23-9.9 et seq.), the Map Filing Law.
[8]
There shall be endorsed upon any map, plat or plan submitted
to the Planning Board or Zoning Board a certification by the Township
Engineer stating the following: "I have carefully examined this map
and the required digital submissions and to the best of my knowledge
and belief find it conforms with the provisions of the Township ordinances
and requirements applicable thereto." There shall also be provided
a line for the Township Engineer's signature and professional seal.