[Amended by Ord No. 84-0-20; Ord. No. 86-0-15; 2-25-2004 by Ord. No. 04:01]
A. 
Schedule A, Schedule of General Requirements[1] shall apply to the uses of land and buildings, the yards and other open spaces to be provided contiguous thereto and all other matters contained therein, as indicated for the various zones established by this chapter, except as modified or superseded by the provisions set forth in §§ 233-8 and 233-9 below.
[1]
Editor's Note: Schedule A, Schedule of General Requirements is included at the end of this chapter
B. 
The requirements listed for each zone as designated, reading from left to right across the Schedule A, Schedule of General Requirements, are hereby prescribed for such zone, subject to the other provisions in this chapter and shall be deemed to be the minimum requirements in every instance of their application, unless otherwise stated.
[Amended 2-25-2004 by Ord. No. 04:01]
Pursuant to the definitions provided in this chapter, in areas with steep sloping lands, Schedule A, Schedule of General Requirements shall be modified and superseded such that the minimum lot area, minimum front/rear yard, minimum side yards, minimum lot depth, minimum lot frontage, maximum lot coverage, maximum improved lot coverage and maximum disturbed land area requirements are established as set forth in Schedule B, Schedule of Area, Yard and Bulk Regulation in Areas of Steep Sloping Land, Tables 1 through 6, annexed hereto and made a part hereof.[1]
[1]
Editor's Note: Schedule A, Schedule of General Requirements and Schedule B, Schedule of Area, Yard and Bulk Regulations in Areas of Steep Sloping Land, Tables 1 through 6, are included at the end of this chapter.
Pursuant to the definitions provided in this chapter, Schedule A, Schedule of General Requirements[1] and other applicable provisions shall be modified and superseded by the following provisions:
A. 
Flood hazard areas and floodways.
(1) 
No permanent structure or building or any enlargement of a permanent structure or building shall be permitted in a floodway or within the flood hazard area.
(2) 
Within a designated floodway or flood hazard area, no filling, grading, dredging or other development shall be permitted in accordance with Chapter 131, Flood Damage Prevention, as finally adopted.
(3) 
For all streams with flood hazard area designations, the applicable required rear or side yard setbacks shall be 50 feet from the floodway or 25 feet from the flood hazard area, whichever is greater.
B. 
Detention/retention basins. For lots with detention/ retention basins, the applicable required rear or side yard setbacks shall be measured from the limits of the detention/retention basin.
C. 
Wetland areas. For lots with wetland areas, the applicable required rear or side yard setbacks shall be measured from the wetland limits.
[1]
Editor's Note: Schedule A, Schedule of General Requirements is included at the end of this chapter.