[Amended by Ord No. 84-0-20; Ord. No. 86-0-15; 2-25-2004 by Ord. No.
04:01]
A. Schedule A, Schedule of General Requirements shall apply to the uses of land and buildings, the yards and other open spaces to be provided contiguous thereto and all other matters contained therein, as indicated for the various zones established by this chapter, except as modified or superseded by the provisions set forth in §§
233-8 and
233-9 below.
B. The requirements listed for each zone as designated,
reading from left to right across the Schedule A, Schedule of General
Requirements, are hereby prescribed for such zone, subject to the
other provisions in this chapter and shall be deemed to be the minimum
requirements in every instance of their application, unless otherwise
stated.
[Amended 2-25-2004 by Ord. No. 04:01]
Pursuant to the definitions provided in this
chapter, in areas with steep sloping lands, Schedule A, Schedule of
General Requirements shall be modified and superseded such that the
minimum lot area, minimum front/rear yard, minimum side yards, minimum
lot depth, minimum lot frontage, maximum lot coverage, maximum improved
lot coverage and maximum disturbed land area requirements are established
as set forth in Schedule B, Schedule of Area, Yard and Bulk Regulation
in Areas of Steep Sloping Land, Tables 1 through 6, annexed hereto
and made a part hereof.
Pursuant to the definitions provided in this
chapter, Schedule A, Schedule of General Requirements and other applicable provisions shall be modified and
superseded by the following provisions:
A. Flood hazard areas and floodways.
(1) No permanent structure or building or any enlargement
of a permanent structure or building shall be permitted in a floodway
or within the flood hazard area.
(2) Within a designated floodway or flood hazard area, no filling, grading, dredging or other development shall be permitted in accordance with Chapter
131, Flood Damage Prevention, as finally adopted.
(3) For all streams with flood hazard area designations,
the applicable required rear or side yard setbacks shall be 50 feet
from the floodway or 25 feet from the flood hazard area, whichever
is greater.
B. Detention/retention basins. For lots with detention/
retention basins, the applicable required rear or side yard setbacks
shall be measured from the limits of the detention/retention basin.
C. Wetland areas. For lots with wetland areas, the applicable
required rear or side yard setbacks shall be measured from the wetland
limits.