The purpose of the preliminary plan is to achieve formal approval of the preliminary plan in order to minimize the need for revisions when final plans are submitted.
A. 
Submission deadline. The applicant shall submit a proper application for a preliminary plan. Such plan shall be submitted and reviewed in accordance with § 175-28 of this chapter.
B. 
Requirements. The preliminary plan submitted shall provide the information required by § 175-26 and should conform to any changes recommended during the sketch plan procedure if a sketch plan was submitted.
C. 
Revised/resubmitted plans. Revisions to submitted plans shall be coordinated with the Township Engineer's comment letter. Revisions shall be "bubbled" and "highlighted" and denoted with the comment letter's itemized comment number.
[1]
Editor's Note: See also the Applications for Review of Plans and the Article VI Preliminary Plan Checklist, included as attachments to this chapter.
A. 
Plans required. The following plans shall be required for all major subdivisions and land developments and shall show the information set forth in Subsections B through K as applicable. Plans may be combined if, in the discretion of the Planning Commission, clarity of the plan will not be impaired.
(1) 
Layout plan. (See Subsections B, C, D and E.)
(2) 
Grading and storm drainage plan. (See Subsections B, C, D and F.)
(3) 
Utility plan. (See Subsections B, C, D and G.)
(4) 
Erosion and sedimentation plan. (See Subsections B, C, D and H.)
(5) 
Road profiles. (See Subsections B, C and I.)
(6) 
Sanitary sewer profiles. (See Subsections B, C and J.)
(7) 
Storm sewer profiles. (See Subsections B, C and J.)
(8) 
Construction details. (See Subsections B, C and K.)
B. 
Drafting standards required for all plans.
(1) 
Plans shall be prepared, signed and sealed by a professional engineer, professional land surveyor or landscape architect (operating within their jurisdiction pursuant to the requirements of their licensing boards) on a standard sheet of 24 inches by 36 inches or 30 inches by 42 inches, except when the Planning Commission approves of other size plans. Standard sheet size shall be consistent throughout the entire plan set of the application.
(2) 
All information shall be legibly and accurately presented.
(3) 
Plans shall be drawn at a scale acceptable to the Township Engineer.
(4) 
All dimensions shall be set in feet and decimal parts thereof and bearings in degrees, minutes and seconds.
(5) 
Each sheet shall be numbered and shall show its relationship to the total number of sheets. If match lines are employed, a legend showing sheet relationship shall be provided.
(6) 
Plans shall be so prepared and shall bear an adequate legend to indicate clearly which features are existing and which are proposed.
(7) 
Where any revision is made or when the plan is a revision of a previously approved plan, dotted lines shall be used to show features or locations to be abandoned and solid lines to show the currently proposed features. Notations of revisions shall be dated.
(8) 
The boundary line of the subdivision shall be shown as a heavy line.
C. 
General information required on all plans.
(1) 
Titled: "Preliminary Plan - Major Subdivision."
(2) 
Sheet title.
(3) 
The name and location of subdivision or land development.
(4) 
Both graphic scales and written scales, one inch equals 100 feet preferred.
(5) 
The date of plan and all subsequent revision dates.
(6) 
Name, address, signature and seal to the professional's statement (See Appendix A.[1]) of any licensed engineer, surveyor or landscape architect (functioning pursuant to the restrictions as set forth by their licensing boards) responsible for the preparation of the plan.
[1]
Editor's Note: Said appendix is included as an attachment to this chapter.
D. 
Information required on all layout, grading and storm drainage, utility plans and erosion and sedimentation plans.
(1) 
General information.
(a) 
North arrow.
(b) 
Site and lot boundaries with closure errors not exceeding 0.01 foot.
(c) 
Boundaries of all adjoining properties with names of landowners within 300 feet.
(d) 
Location and type of all existing monuments.
(2) 
Natural features.
(a) 
Slope areas.
[1] 
8% < 15%.
[2] 
15% < 20%.
[3] 
Over 20%.
(b) 
One-hundred-year floodplain areas.
(c) 
Forested areas.
(d) 
Watercourse, lakes and wetlands (together with names, if any). If no wetlands are present, the plan shall bear a certification to that effect.
(3) 
Location of existing man-made features on the site and within 100 feet from the site being subdivided or developed.
(a) 
Streets and rights-of-way, including name and right-of-way widths, on the site and on immediately adjacent tracts.
(b) 
Existing lot layout on the site and on immediately adjacent tracts.
(c) 
Historic sites or structures, including name and description.
(d) 
Sewer lines, storm drains and culverts.
(e) 
Bridges.
(f) 
Utility easements, restrictive covenants and any other easements. All easements shall be defined by bearings and distances.
(4) 
Proposed features.
(a) 
Layout of streets with center lines, cartways and rights-of-way and proposed names.
(b) 
Layout of lots with identification number.
(c) 
Building setback lines from all lot lines.
(d) 
In nonresidential developments and planned residential developments, the arrangement and use of buildings and parking areas, with all necessary dimensions and number of parking spaces. Elevations and perspective sketches of proposed buildings are encouraged.
(e) 
Rights-of-way, restrictive covenants and easements for all drainage, utilities or other purposes. Easements shall be defined by bearings and distances.
(f) 
Sidewalks and pedestrian paths.
(g) 
Open space areas (if applicable).
(h) 
Recreation facilities (if applicable).
(i) 
Proposed monuments with reference to proposed improvements.
(j) 
Sight distances shall be shown at the intersection of any proposed street with existing streets. Sight distances shall be measured pursuant to PennDOT requirements.
E. 
Layout plan.
(1) 
Names and addresses of:
(a) 
The landowner.
(b) 
The developer.
(c) 
If the developer is not an individual, then the developer's principal officers and any person or entity holding an ownership interest of 10% or more in the entity.
(d) 
Adjoining property owners, including those across adjacent roads.
(2) 
Owner's statement of acknowledgment.
(a) 
The owner shall acknowledge the statement contained in Appendix A[2] before an officer authorized to take acknowledgments.
[2]
Editor's Note: Said appendix is included as an attachment to this chapter.
(b) 
The seal of the notary public or other qualified officer acknowledging the owner's statement shall be impressed onto the plan.
(3) 
Approval/review signature blocks (See Appendix A.[3]) for:
(a) 
Township Supervisors.
(b) 
The Township Planning Commission.
(c) 
A three-inch-by-five-inch space for the Township's approval stamp located in lower right-hand corner.
(d) 
Review by the Lehigh Valley Planning Commission.
(e) 
Location map shall show roads and parcels and zoning district lines. The required scale of the map is not to be specified. The map shall encompass an area of eight inches by eight inches centered around the site. USAS maps shall not be used.
(f) 
Professional engineer's certification of unchanged material.
[1] 
The plans shall contain a certification from the developer's professional engineer that any revised - resubmitted plans contain only those changes brought to the attention of the Township as prescribed in § 175-25C and § 175-28C.
[2] 
Certification language shall be as approved by the Township's Engineer.
[3]
Editor's Note: Said appendix is included as an attachment to this chapter.
(4) 
Project summary list. The following information shall be listed on the plan:
(a) 
Total acreage of site.
(b) 
Applicable zoning district(s) with requirements.
(c) 
Total number of lots in the development.
(d) 
Density of dwelling units per acre.
(e) 
Required lot size.
(f) 
Proposed lot size (maximum, minimum and average).
(g) 
Open space required (if applicable).
(h) 
Open space proposed (if applicable).
(i) 
Type of water systems.
(j) 
Type of sanitary disposal systems.
(k) 
Linear feet of new road.
(l) 
Deed source (volume and page).
(m) 
Tax Map (block and lot).
(n) 
Yard setbacks.
(5) 
Proposed features.
(a) 
Accurate dimensions and areas of lots expressed in both square feet and acres.
(b) 
Streets.
[1] 
Cartway and right-of-way width.
[2] 
Center line with bearings, distances, horizontal curve data and stations corresponding to the profile.
[3] 
Rights-of-way and curblines with horizontal curve radii at intersections.
[4] 
Beginning and end of proposed construction.
[5] 
Tie-ins by courses and distances to intersection of all public roads, with their names and widths of cartway and right-of-way.
(c) 
Map of entire contiguous holdings and all other holdings of the owner within 1,000 feet, indicating area of proposed subdivision. A sketch plan of proposed road systems will be required for area not included in the preliminary plan.
F. 
Grading and storm drainage plan.
(1) 
Existing and proposed contour lines at intervals of two feet if the slope is 15% or less, five feet if the slope is over 15% and up to 20% and 20 feet if the slope exceeds 20% shall be shown. Contour intervals shall be based on a field survey or photogrammetric procedure.
(2) 
Street center-line data and stations corresponding to the profile.
(3) 
Storm drainage.
(a) 
Location and size of facilities with stations corresponding to the profile.
(b) 
Location of inlets with invert elevation of flow line and grade at the top of each inlet.
(c) 
Watershed areas for each drainage structure or swale.
(d) 
Property lines and ownership with details of easements where required.
(e) 
Beginning and end of proposed construction.
(f) 
Location of all other drainage facilities and public utilities in the vicinity of storm drain lines.
(g) 
Hydraulic design standards for culverts, bridge structures and/or other storm facilities.
(h) 
If any detention or retention structures are used, the plans shall include a detailed plan view and profile views drawn at least to a horizontal scale of one inch equals 50 feet.
(4) 
Location and size of proposed drainage swales.
G. 
Utility plan.
(1) 
If on-lot sanitary disposal systems are being proposed:
(a) 
Existing and proposed contour lines at intervals of two feet if the slope is 15% or less, five feet if the slope is over 15% and up to 20% and 20 feet if the slope exceeds 20% shall be shown. Contour intervals shall be based on a field survey or photogrammetric procedure.
(b) 
Proposed location of wells.
(c) 
Proposed or typical location of dwelling.
(d) 
Proposed location of subsurface disposal field and alternate field.
(e) 
Location of percolation test holes and soil probe pit.
(f) 
Location and extent of various soil types within the site, with the DEP definition for each.
(g) 
Permanent and seasonal high-water table areas.
(2) 
If centralized sanitary sewers are being proposed:
(a) 
Location and size of line with stations corresponding to the profile.
(b) 
Location of manholes with invert elevation of flow line and grade at the top of each manhole.
(c) 
Property lines and ownership with details of easements where required.
(d) 
Beginning and end of proposed construction.
(e) 
Location of laterals.
(f) 
Location of all other drainage facilities and public utilities in the vicinity of sanitary sewer lines.
(g) 
If municipal facilities are used, approval shall be required from that governing body.
(3) 
Centralized water system.
(a) 
Location and size of waterline.
(b) 
Plans regarding water source as required by Appendix C.[4]
[4]
Editor's Note: Said appendix is included as an attachment to this chapter.
(c) 
Fire hydrants.
(4) 
Streetlighting.
H. 
Erosion and sedimentation plan.
(1) 
The erosion and sedimentation plan shall be in accordance with the regulations of the Northampton County Conservation District.
(2) 
All stormwater runoff calculations shall be governed by the parameters set forth in Chapter 163, Stormwater Management.
I. 
Road profiles.
(1) 
Profile of existing ground surface along center line of street.
(2) 
Proposed center-line grade with percent on tangents and elevations at fifty-foot intervals.
(3) 
All vertical curve data, including length, elevations and minimum sight distance as required by Article X, Design Standards.
(4) 
A plan view shall be placed on every profile sheet.
J. 
Sanitary sewer and storm drain profiles.
(1) 
Profile of existing ground surface with elevations at top of manholes or inlets.
(2) 
Profile of storm drain or sewer showing type and size of pipe, grade, cradle, manhole and inlet locations and invert elevations along flow line.
(3) 
All line crossings of other utilities.
(4) 
Invert elevations along flow line at manholes, inlets and at line crossing of other utilities.
K. 
Details.
(1) 
Typical cross section and specifications for street construction as required by Article XI, Required Improvements.
(2) 
Drainage swale cross section and construction materials.
(3) 
Pipe bedding details.
(4) 
Storm drainage structures.
(5) 
Sanitary sewer structures.
(6) 
Curb and sidewalk details.
L. 
Supportive documents and information.
(1) 
Copies of all restrictions or covenants under which lots are to be sold.
(2) 
Map of all property holdings of the owner within 2,000 feet of the proposed subdivision, indicating the site of proposed subdivision. A sketch plan of a proposed road system with any property holdings contiguous to the proposed subdivision.
(3) 
Certification of central water supply system.
(a) 
Public. When the subdivision is to be served with water by an existing water company or authority, the developer shall submit two copies of a letter from the water company or authority which states that the company or authority can adequately serve the subdivision and which states any conditions required by the company or authority for the provision of services.
(b) 
Private. When the subdivision is to be served by a private central water supply system:
[1] 
The developer shall submit a preliminary plan of the proposed system showing all pertinent features.
[2] 
The approval of the subdivision shall be conditioned upon the receipt by the Township of the approval of the system by the appropriate agencies prior to final plan submission.
[3] 
Failure to submit the approval of the system by the appropriate agencies shall render any conditional preliminary plan approval null and void.
[4] 
The Planning Commission and Supervisors shall have the right to review any such preliminary and final plans to determine the overall adequacy of the proposed system in accordance with Appendix C[5] and/or DEP regulations.
[5]
Editor's Note: Said appendix is included as an attachment to this chapter.
(4) 
Certification of a central sewage disposal system.
(a) 
Public. When the subdivision is to be served by an existing sewer company or authority:
[1] 
The developer shall submit a preliminary plan of the proposed sewerage system showing all pertinent features.
[2] 
The developer shall submit two copies of a letter from the company or authority which states that the company or authority can adequately serve the subdivision and which states any conditions required by the company or authority for the provision of services.
[3] 
The developer shall submit four copies of a completed planning module for land development concurrent with the preliminary plan.
[4] 
The Planning Commission and Supervisors shall have the right to review any such preliminary and final plans to determine compliance and compatibility of the same with any Township plans or studies and the overall adequacy of the proposed system.
(b) 
Private. When the subdivision is to be served by a private central sewage disposal system:
[1] 
The developer shall submit a preliminary plan of the sewerage and treatment systems showing all pertinent features.
[2] 
The developer shall submit four copies of a completed planning module for land development concurrent with the preliminary plan.
[3] 
The approval of the subdivision shall be conditioned upon the receipt by the Township of the approval of the sewerage and treatment system by the appropriate state and federal agencies.
[4] 
The approval of the subdivision shall be conditioned upon the receipt by the Township of the approval of the land planning modules by the appropriate state and federal agencies.
[5] 
The Planning Commission and Supervisors shall have the right to review any such preliminary and final plans to determine compliance and compatibility of the same with any Township plans or studies and the overall adequacy of the proposed system in accordance with Appendix B[6] and/or DEP regulations.
[6]
Editor's Note: Said appendix is included as an attachment to this chapter.
(5) 
Certification of on-lot sewage system. When the subdivision is to be served by individual on-lot sewage disposal systems:
(a) 
The developer shall submit four copies of a completed planning module for land development concurrent with the preliminary plan.
(b) 
The approval of the subdivision shall be conditioned upon the receipt by the Township of the approval of the land planning module by the appropriate agencies.
(6) 
A statement setting forth, in detail, the character of the improvements the applicant proposes to make on the property to be developed and a development schedule indicating the approximate date when construction can be expected to begin and be completed.
(7) 
Impact analysis.
(a) 
In areas where there are problems concerning groundwater availability or quality, the Planning Commission or the Board of Supervisors shall require the developer to submit for review a hydrogeological report. Said report shall be prepared by a qualified and certified professional engineer, geologist or hydrologist who is approved by the Township, and shall contain the following information:
[1] 
Geological investigation.
[a] 
Determine general geology of site, including compilation of existing information.
[b] 
Conduct a fracture trace analysis to identify faults and lineations pertinent to the groundwater system at the site.
[c] 
Determine geological factors controlling groundwater movement.
[2] 
Groundwater hydrology.
[a] 
Survey and compile flow data for existing wells and proposed wells.
[b] 
Identify aquifer characteristics such as storage coefficient, transmissibility, well yields and recharge rates.
[c] 
Determine capacities of major production wells and general groundwater use in area of the proposed subdivision, including identification of overpumped areas and critical recharge areas, if any.
[d] 
Characterize groundwater quality in site area.
[e] 
Identify long-term safe yield of aquifers.
[3] 
Environmental impacts to groundwater.
[a] 
Evaluate effects of on-lot sewage systems on groundwater system, including recharge capability and water quality implications.
[b] 
Determine availability of groundwater and dewatering effects, including impacts of impervious surfaces and stormwater management facilities on groundwater recharge capacity.
[c] 
Assess effects of the development on nearby wells.
[d] 
Confirm the availability of groundwater for all existing and proposed uses.
(b) 
Developers of subdivisions or land developments generating in excess of 100 round trips per day shall be required by the Planning Commission or the Board of Supervisors to submit for review a traffic impact study. The study shall indicate increases projected in vehicular traffic and the ability of the existing road system to accommodate traffic increases and should be prepared in accordance with standards set forth by the American Association of State Highway and Transportation Officials, Pennsylvania Department of Transportation and any other recognized institute of authority.
(8) 
Storm drainage calculations. All calculations relating to facilities appearing on the grading and storm drainage plan and the erosion and sedimentation plan shall be submitted for review by the Township Engineer. See Chapter 163, Stormwater Management.
(9) 
Other utilities. The applicant shall submit letters of commitment from the proposed utilities (i.e., water, sewer, electric, telephone, CATV, gas, etc.)
(10) 
Sinkhole occurrences. Whenever a subdivision or land development or part thereof is in an area of carbonate geology as mapped in the attachment,[7] the following provisions shall apply.
(a) 
A recognized professional with competence in the field shall review aerial photographs, soils and other related data available to him or her, as the data relates to the subject property. The professional shall also conduct a site inspection of the property.
(b) 
Based on the work required in Subsection L(10)(a), the professional shall prepare a map of the site showing all karst features or feature indicators. The mapping shall indicate, but shall not be limited to, the following features:
[1] 
Closed depressions.
[2] 
Open sinkholes.
[3] 
Seasonal high-water table indicators.
[4] 
Outcrops of bedrock.
[5] 
Unplowed areas of plowed fields.
[6] 
Surface drainage into ground.
[7] 
Ghost lakes after rainfall.
(c) 
Based upon the work performed in Subsection L(10)(a), the professional shall determine what further testing should be done by the applicant to ensure compliance with the performance standards set forth in § 175-42Q. Testing methodology shall be reasonable under the circumstances, including:
[1] 
The scale of the proposed development.
[2] 
The hazards revealed by examination of available data and site inspection.
(d) 
The applicant shall cause the additional testing established in Subsection L(10)(c) to be done. The test results shall be included with the submission and shall be referred to the Municipal Engineer.
(e) 
The Township Engineer shall report to the Planning Commission, with a copy to the landowner, his or her opinion as to the adequacy of the study and as to the capability of the site to support the proposed development in a manner in which the risks attendant to development in carbonate areas are either eliminated or minimized. Recommendations for site development, including stormwater management, the layout of utility lines and building location may be included. Additional studies or testing as deemed necessary by the Township Engineer in order to produce an adequate study, given the scale of the proposed development and the hazards revealed, may be required of the applicant.
[7]
Editor's Note: Map 1, Carbonate Geology, is included as an attachment to this chapter.
M. 
Architectural drawings.
(1) 
Floor plans of the proposed building(s).
(2) 
Colored elevations of all sides of the proposed building(s).
(3) 
Colored rendering of the building(s) and partial site.
(4) 
Additional drawings as requested by the Planning Commission to help understand the proposed building and site utilization.