Standards for submission of the preliminary
site plan and written description of the proposed project are as follows.
The developer shall submit three sets of preliminary
site plans. The developer shall submit additional sets of preliminary
site plans as required by the Town.
[Amended 12-11-2007 by L.L. No. 3-2007]
Once the project has been reviewed by the Town agencies, a determination will be made as to whether the proposed project generally is in compliance with the Town planning, zoning, environmental, stormwater and building codes. The Code Enforcement Officer will be responsible for informing the developer of any unusual requirements, such as variances in zoning, planning or permits from the Town and various other governmental agencies. If a stormwater pollution prevention plan (SWPPP) was submitted together with the preliminary site plan pursuant to §
135-2C of this chapter, such site plan and SWPPP shall not be approved unless they comply with the requirements of Article
XIV of Chapter
245, Zoning, of the Town Code.
No property may be subdivided prior to formal
review by the Town of Niagara Planning Board and formal approval of
the Town Board of the Town of Niagara, at a meeting of the Town Board.
Standards for the final site plan are as follows.
Regarding horizontal and vertical control, the control for the project must be tied to the Town system as specified in Article
II of these specifications.