[Amended 1-17-2012]
The owner or authorized agent of the owner may
apply for a permit on forms provided by the Town prior to initiating
any construction. The application shall be accompanied by plans, specifications
or other information deemed pertinent by the Town Engineer which is
supplemental to that furnished on the application form.
A. An inspection charge as determined by the WPCA per
connection will be due at the time of application for a sewer permit.
Refer to the WPCA Schedule of Charges for additional information.
B. All permits issued under this article shall be kept
on the premises at all times when work is in progress.
The Town of Tolland currently has no water pollution
treatment facility of its own and has entered into a contract to purchase
capacity from the Town of Vernon. This capacity is limited, and the
WPCA must utilize this capacity in a manner which, in its opinion,
best benefits the citizens of the Town of Tolland. To the extent possible,
connection of municipal buildings and properties to the public sewer
system shall be given first priority. Remaining capacity shall be
distributed throughout the designated sewer service areas whether
or not sewer service within these areas currently exists. In order
to ensure that capacity is available as needed in designated sewer
service areas, no connections to the public sewer shall be permitted
for properties lying outside of the sewer service area unless such
connection is ordered by the WPCA.