[Amended 9-24-2014 by Ord. No. 7-2014]
The applicant may submit whatever information he deems useful.
However, to facilitate the fullest possible response from the Planning
Commission, the applicant is encouraged to submit the information
listed below.
A. An existing resources/site analysis plan (ER/SA) as set forth in §
360-14C. For the purposes of the concept plan, topography may be taken from USGS maps, wetlands may be taken from maps published by the United States Fish and Wildlife Service or the United States Department of Agricultural Natural Resources Conservation Service, and woodlands may be taken from aerial photograph.
B. A site location and identification map as set forth in §
360-14B.
C. An aerial photograph with property lines indicated. The conceptual
layout may be imposed on the aerial photograph.
D. Zoning information, including applicable district lot area and bulk
regulations. Adjusted tract area calculations, density and greenway
land requirements, including proposed development data.
E. A schematic layout indicating a general concept for land conservation
and development at the same scale as the ER/SA plan. The concept plan
may be prepared as a simple overlay on top of the ER/SA plan.
(1) In the case of land developments, locations of proposed buildings
and major structures, parking lots and other improvements.
(2) In the case of conservation subdivisions, a schematic layout indicating conformance with the four-step design process set forth in §
360-41 of this chapter.
F. Streets on and adjacent to the tract.
G. General description of proposed method of water supply, sewage disposal,
and stormwater management.
H. A statement indicating that the concept plan is a schematic drawing
not intended for construction purposes.
I. Drafting standards set forth in §
360-14A shall be met.
[Amended 9-24-2014 by Ord. No. 7-2014]
Preliminary plans shall be prepared by an engineer, land surveyor,
and/or landscape architect registered in the Commonwealth of Pennsylvania
to perform such duties. The plan shall bear the seal and signature
of such registered professionals licensed in Pennsylvania. Metes and
bounds descriptions shall be prepared by land surveyors, and designs
which entail engineering shall be prepared by registered engineers
with appropriate expertise. The preliminary plan shall show, be accompanied
by, or be prepared in accordance with the following:
A. Drafting standards.
(1) The plan shall be clearly and legibly drawn at a scale of 10 feet,
20 feet, 30 feet, 40 feet, 50 feet, 60 feet or 100 feet to the inch.
Profile plans shall maintain a ratio of 1:10 vertical to horizontal.
(2) Dimensions for the entire tract boundary shall be in feet and decimals;
bearings shall be in degrees, minutes and seconds. Lot line descriptions
shall read in a clockwise direction. The description shall be based
upon a survey and not have an error of closure greater than one foot
in 10,000 feet. If a landowner is going to retain a single lot with
a lot area that is three times the minimum lot size requirement, the
boundary of that lot may be identified as a deed plotting and may
be drawn at any legible scale; if the retained lot is less than three
times the minimum lot size requirement, its existing perimeter must
be described to the accuracy requirements above.
(3) The sheet size shall be 24 inches by 36 inches. If the plan is prepared
in two or more sections, a key map showing the location of the sections
shall be placed on each sheet. If more than one sheet is necessary,
each sheet shall be numbered to show the relationship to the total
number of sheets in the plan (e.g., Sheet 1 of 5).
(4) Plans shall be legible in every detail to the satisfaction of the
Township.
(5) All profile sheets shall include the corresponding horizontal alignment.
Utilities and stormwater facilities located in a given area shall
be provided on the same sheet to show their interrelationship. All
plan information shall be provided in an easy to read format. Applicants
are encouraged to follow the standard plan format provided in Appendix
No. 6.
B. Location and identification. A location map showing the location
of the proposed subdivision or land development within its neighborhood
context shall be submitted with the information below:
(1) The proposed project name or identifying title.
(2) The municipality in which the project is to be located. If the tract
of land is located in the vicinity of a municipal boundary line, the
location of the boundary shall be shown.
(3) A location map, drawn to scale, relating the property to at least
two intersections of existing road center lines.
(4) The name and address of the owner, authorized agent of the tract,
the developer and the firm that prepared the plans.
(5) Source of title to the land included within the subject application,
as shown in the office of the Cumberland County Recorder of Deeds.
If equitable owner, the name, address and reference to the equity
agreement.
(6) The map and lot number assigned to the property by the Cumberland
County Tax Assessment Office.
(7) The file or project number assigned by the firm that prepared the
plan, the plan date, and the date(s) of all plan revisions.
(8) A North arrow, a graphic scale, and a written scale.
(9) The total acreage, including the adjusted tract acreage, of the entire
existing tract.
(10)
A statement on the plan identifying the zoning ordinance district for the subject property and surrounding land. Additionally, the lot size and/or density, lot coverage, building coverage, and yard requirements of Chapter
415, Zoning, shall be identified for the subject property.
(11)
A statement on the plan identifying any existing waivers, variances,
special exception, conditional use, and existing nonconforming structures/uses.
C. Existing resources and site analysis plan (ER/SA). For all subdivisions
and land developments, an ER/SA plan shall be prepared to provide
a comprehensive analysis of existing conditions, both on the proposed
development site and within 500 feet of the site. Conditions beyond
the tract boundaries may be described based on existing published
data available from governmental agencies and from aerial photographs.
The following information shall be shown:
(1) Existing natural features.
(a)
A vertical aerial photograph at a scale that matches the scale
of the ER/SA plan, with property lines shown.
(b)
Existing contours, at a minimum vertical interval of two feet
for land with average natural slope of 4% or less and at a minimum
vertical interval of five feet for more steeply sloping land. Contours
shall be accompanied by the location of the bench mark within or immediately
adjacent to the subject tract and a notation indicating the datum
used. Contours plotted from the United States Geodetic Survey may
only be used for subdivision plans which require no new streets or
other public improvement. Unless required by the Planning Commission
for site evaluation, contour data is not necessary beyond the subject
property. The United States Geodetic Survey shall be used for bench
mark datum. This information is not subject to recording with the
Cumberland County Recorder of Deeds.
(c)
The location and delineation of wetlands, ponds, streams, ditches,
drains, and natural drainage swales, as well as the one-hundred-year
floodplains.
(d)
Vegetative cover conditions on the property according to general cover type, including cultivated land, permanent grass land, meadow, pasture, old field, hedgerow, woodland and wetland, specimen trees, the actual canopy line of existing trees and woodlands. Vegetative types shall be described by plant community, relative age, and condition. For woodlands, an evaluation shall be submitted meeting the requirements of Subsection
C(6) below.
(e)
Soil series, types and phases, as mapped by the United States
Department of Agriculture Natural Resources Conservation Service in
the published soil survey for Cumberland County, and accompanying
data tabulated for each soil relating to its suitability for construction
(and, in unsewered areas, for septic suitability). The following soil
types shall be specifically identified:
[2]
Seasonal high-water table soils.
[4]
Class I and II agricultural soils.
[5]
Soil hydrologic group (i.e., Group A, B, C or D).
(f)
Ridgelines and watershed boundaries.
(g)
Geologic formations, including rock outcroppings, cliffs, sinkholes
and fault lines, based on available published information or more
detailed data obtained by the applicant.
(h)
Any portion of the tract identified as an important natural habitat in Subsection
E(10) below shall include the information required therein.
(i)
A viewshed analysis showing the location and extent of views
into the property from public roads and from public parks, public
forests, and state gamelands. Significant scenic views from the property
shall also be delineated.
(2) Existing man-made features, including:
(a)
Location, dimensions and use of existing buildings, driveways
and any other man-made features on the site.
(b)
Locations of trails that have been in public use (pedestrian,
equestrian, bicycle) or are proposed on a Township or Cumberland County
open space or greenway plan.
(c)
Any easements, deed restrictions, rights-of-way, or any other
encumbrances upon the land, including location, size and ownership.
(d)
Site features or conditions such as hazardous waste, dumps,
underground tanks, active and abandoned wells, quarries, landfills,
sand mounds, and artificial land conditions.
(e)
Locations of historic features on the tract, including, but not limited to building, foundations, cellar holes, stone walls, earthworks, and burial sites. An historic features report shall be submitted in accordance with Subsection
E(9).
(f)
The names of all immediately adjacent landowners, and the names
and plan book record numbers of all previously recorded plans for
adjacent parcels.
(g)
Concept or preliminary plans for conservation subdivisions shall include documentation of the four step design process set forth in §
360-41. When requested by the Township, the applicant shall submit four separate sheets indicating the delineation of each step of the design process.
(3) The location and description of existing lot line markers and monuments
along the perimeter of the entire existing tract.
(4) The following items when located: (a) on the subject tract; (b) within
200 feet of the subject tract; or (c) beyond 200 feet of the subject
tract when the item affects the subject tract, as determined by the
Township Engineer:
(a)
The location, size and name of existing rights-of-way and cartways
for streets, access drives, driveways and service streets.
(b)
The location and size of the following existing features (e.g.,
public sanitary sewer facilities, public water supply facilities,
fire hydrants, buildings, swales, watercourses, bodies of water, floodplain,
wetland and stormwater management facilities which affect stormwater
runoff on the subject tract) and any related rights-of-way.
(c)
The location and size of existing rights-of-way for electric,
telephone, cable television, gas and oil transmission lines and railroads.
(5) The location and size of the existing individual on-lot sanitary
sewer disposal facility and water supply facility when located on
the subject tract or within 100 feet of the subject tract. Where access
to the adjacent lot is not possible, the locations of utilities on
such lots may be approximated.
(6) The locations of existing wooded areas or tree lines shall be shown,
with a mapping of areas proposed to be removed or maintained. In addition,
the locations and general species of individual trees with a trunk
diameter of 18 inches or greater shall be shown (other than trees
within the wooded areas proposed to be maintained), with a description
of whether the tree is proposed to be removed or maintained. Trunk
diameter shall be measured at a height of 4.5 feet above the ground
level.
(a)
For wooded areas and trees proposed to be maintained, the applicant
shall provide a written description of methods that will be used to
protect the trees during construction, such as placing temporary fencing
under the dripline of the tree, to avoid compaction of the root system.
(b)
The locations of existing healthy trees with a trunk diameter
over 18 inches and wooded areas shall be a major consideration in
the location of proposed common open space or parkland and in the
location of new buildings and parking areas.
(c)
Where building or alteration is proposed on natural slopes of
over 15%, the applicant shall prove to the satisfaction of the Township
that the removal of healthy trees with a trunk width of over six inches
(measured at a height 4.5 feet above the ground level) and other attractive
natural vegetation will be minimized.
(7) For buildings that are estimated to be 80 years or older on the tract, in addition to locations as required by Subsection
C(2)(e), their locations shall be shown and a description and a photo of the building shall be provided. The applicant shall also describe whether the building is proposed to be maintained, changed in use, renovated or removed. See also Subsection
E(9) of this section. The Board of Supervisors shall be authorized to grant a waiver or modification to a requirement of this chapter where the applicant proves such action is needed to assist in preserving a historic building.
D. Proposed features.
(1) Complete description of the center line for all new streets. This
description shall include distances and bearings with curve segments
comprised of radius, tangent, arc and chord. The description shall
not have an error of closure greater than one foot in 10,000 feet.
(2) Approximate lot line dimensions and lot areas for all parcels. Along
existing street rights-of-way, the description shall utilize the existing
deed lines.
(3) Lot numbers in consecutive order.
(4) In the case of land development plans, the location and configuration
of proposed buildings, parking compounds, streets, access drives,
driveways, and all other significant facilities. Building elevation
drawings shall also be provided.
(5) A statement on the plan indicating the proposed total number of lots,
units of occupancy, density, minimum lot size, lot coverage, building
coverage, types of sanitary sewage disposal, type of water supply,
name of authority providing sanitary sewage disposal and water supply
(if applicable), and proposed land use. The location of each land
use if several types of uses are proposed. This statement shall also
include the criteria needed to calculate off-street parking, lot coverage
and other requirements of the prevailing Township Zoning Ordinance.
(6) Easements for utilities, access, stormwater facilities, etc.
(7) Building setback lines, with distances from the property and street
right-of-way. A typical example may be used to identify side and rear
yard setback; however, odd- or unusual-shaped lots shall be plotted
with all setback lines.
(8) Identification of buildings and other structures to be demolished.
Additionally, the schedule for demolition shall be acknowledged on
the plan.
(9) Typical street cross-section for each proposed street and typical
cross-section for any existing street which will be improved as part
of the application. Each cross-section shall include the entire right-of-way
width. Cross-sections for improvements to existing streets shall be
provided for each fifty-foot station location.
(10)
Vertical and horizontal alignment on the same sheet for each
proposed street, stormwater management facility, sanitary sewer (including
manhole numbers), and water distribution system. All street profiles
shall show at least the existing (natural) profile along the center
line, proposed grade at the center line, and the length of all proposed
vertical curves for streets. All water distribution and sanitary sewer
systems shall provide manhole locations, size and type of material.
This information is not subject to recording with the Cumberland County
Recorder of Deeds.
(11)
Proposed names for new streets, pavement markings and traffic
control devices.
(12)
Location and material of all permanent monuments and lot line
markers, including a note that all monuments and lot line markers
are set or indicating when they will be set.
(13)
In the case of land development plans, a grading plan. The grading
plan shall include finished grades and ground-floor elevations. This
information may be provided on separate sheets and is not subject
to recording in the office of the Cumberland County Recorder of Deeds.
(14)
A statement on the plan indicating any proposed waivers or variances.
This statement must be revised, upon action on the request and prior
to recordation of the plan, to acknowledge the outcome of the requested
waiver or variance.
(15)
Identification of any lands to be dedicated or reserved for
public, semipublic, or community use.
(16)
For a development in the Conservation Subdivision Overlay (CSO) zone, see §
360-12G, which may allow the deferral of certain submission requirements and certain additional modifications and waivers.
E. Reports.
(1) Sketch plan. A plan drawn to the standards of a concept plan for
the entire landholding when, in the opinion of the Township, the application
significantly impacts the undeveloped portion of the landholding.
The application will be considered in light of its relationship to
the entire landholdings.
(2) Sanitary sewer. A sewer facilities plan revision (plan revision module
for land development) or supplement, when required by the Pennsylvania
Sewage Facilities Act, Act 537 of 1966, as amended.
(3) Groundwater supply.
(a)
A water supply capacity report for projects which propose a
groundwater system of greater than 25 residential units (single or
cumulative), or commercial uses or industrial uses which propose the
single or cumulative groundwater system greater than 7,500 gallons
per day.
(b)
A water supply capacity report shall be prepared by a professional
engineer with expertise in hydrology, soils and geology. The report
must demonstrate that the groundwater recharge on the subject property
after development, during drought conditions (precipitation at 40%
below normal), will exceed the anticipated water usage and that the
project will not lower the groundwater table in the area to the extent
of decreasing the groundwater supply available to other property below
safe levels.
(4) Stormwater. A stormwater management plan in accordance with the Silver
Spring Township Stormwater Management Ordinance in effect at the time
of filing of the preliminary plan.
(5) Steep slope. A steep slope report for all applications involving construction on lands that possess slopes exceeding 25%. Standards for boundary interpretation are provided in §
360-35. The steep slope report shall include the following:
(a)
A topographic map of the site which highlights those areas that
possess slopes exceeding 25%. Also reflected on this map shall be
all existing and proposed site alterations and improvements (e.g.,
buildings, streets, access drives, driveways, parking compounds, utilities,
etc.) that are located within the steep slope area.
(b)
Only in those instances where construction and/or modification
is proposed to the existing topography and vegetative cover within
areas of 25% or greater slope, the applicant shall provide a detailed
description of the methods that are being used to:
[1]
Protect and stabilize areas that have a high potential for soil
erosion;
[2]
Accommodate stormwater runoff;
[3]
Assure structural safety and minimize harm to the environment
associated with construction on steep slopes;
[4]
Protect and preserve on-site and off-site valuable natural wildlife,
plant habitats, and water quality;
[5]
Protect steep slopes on adjoining properties; and
[6]
Assure adequate foundations for buildings and/or structures.
(c)
Only in those instances where construction and/or modifications
to the existing topography and vegetative cover in areas of 25% or
greater slopes, the applicant shall provide a soils engineering report.
A soils engineering report shall be prepared by a registered professional
engineer with expertise in soil, geology and construction. The report
shall include:
[1]
The nature, types, distribution and stability of the surface
and subsurface soils for load bearing, stability and compaction;
[2]
Extent, description and location of exposed rock and bedrock;
[3]
Erodibility of surface soil; and
[4]
Depth to seasonal high-water table.
(6) Traffic impact report. A traffic impact report shall be submitted for all residential land uses which exceed 25 lots or units in whole or in part, nonresidential uses that require more than 50 parking spaces, or upon a determination by the Board of Supervisors that the volume or type of anticipated vehicle movements may adversely impact road conditions. The Board of Supervisors may waive, in whole or in part, the requirement for a traffic impact report at its discretion in accordance with the provisions of Subsection
E(6)(f). The purpose of the traffic impact report is to insure that proposed developments do not adversely affect the transportation network, to identify any traffic problems, and to determine traffic problems on Township, county or state roads in the vicinity of the proposed project. The report also will assist in the protection of air quality, the conservation of energy and the safety of the motoring public. The report shall present specific determination of necessary traffic control signing (i.e., stop signs, speed limit signing, warning signs, no-parking signing, etc.), conforming to Title 75, Vehicles, of the Pennsylvania Consolidated Statutes, and applicable Township requirements.
(a)
Preparer. The traffic impact report shall be prepared by a qualified traffic engineer and/or transportation planner with previous traffic study experience. The requirements, procedures and standards for the report are set forth in Subsection
E(6)(c) of this section.
(b)
Definitions. The following words and phrases shall have the
particular meaning assigned below for this section of the chapter:
LEVEL OF SERVICE
This evaluation is defined in the 1985 Highway Capacity Manual,
Special Report 209, as amended, as operational conditions within a
traffic stream (or at an intersection approach). Level-of- service
also generally describes these conditions in terms of such factors
as speed, travel time, freedom to maneuver, traffic interruptions,
comfort and convenience and safety. Six levels of service are defined
for each type of traffic facility, ranging from A to F.
[1]
Level-of-service A indicates free flow;
[2]
Level-of-service B indicates stable flow;
[3]
Level-of-service C indicates stable, but inhibited, flow;
[4]
Level-of-service D indicates high-density, restricted, stable
flow;
[5]
Level-of-service E indicates operation at or near capacity;
[6]
Level-of-service F is indicative of flow breakdown.
MAJOR INTERSECTION
Any intersection where traffic generated by the proposal
will have a significant effect on the operation of traffic through
the intersection. Where doubt exists, the qualified traffic engineer
and/or planner shall seek guidance from the Silver Spring Township
Board of Supervisors and/or the Township Traffic Engineer prior to
the submission of the study.
QUEUE ANALYSIS
This procedure includes the average queue and maximum queue
of vehicles which will be observed in each traffic stream and intersection
approach, measured in both feet and vehicles. Various statistical
and/or computer models may be applied.
STUDY AREA
This area will extend along all Township, county and state
roads serving the development and will extend to all major intersections
along all roads within one mile of the site involved. Where doubt
exists, the qualified traffic engineer and/or transportation planner
will seek guidance from the Silver Spring Township Board of Supervisors
or its designee prior to the submission of the study.
TRIP GENERATION
The total count of trips to and from a study site per unit
of land use (i.e., acres, dwelling unit, etc.) as established by the
most recent edition of the Institute of Transportation Engineers,
Trip Generation Report. For land uses not listed in this report or
if information is determined through a small sample size, the qualified
traffic engineer and/or transportation planner shall seek guidance
from the Silver Spring Township Board of Supervisors or its designee
prior to the submission of the study.
VOLUME/CAPACITY ANALYSIS
This procedure compares the volume of a traffic facility
to its capacity. The procedure described in the 1985 Highway Capacity
Manual, Transportation Research Board Special Report 209, as amended,
shall be followed.
WARRANTS FOR TRAFFIC SIGNAL INSTALLATION
This is a series of warrants which detail the minimum traffic
volume, pedestrian volume or other criteria necessary for the installation
of a traffic signal. These criteria are contained in the most recent
edition of the Manual on Uniform Traffic Control Devices for Streets
and Highways, United States Department of Transportation, Federal
Highway Administration.
(c)
General requirements and standards. The traffic impact report
shall be in the following format and contain the specified information:
[1]
Introduction. The objective of this section is to clearly identify
the land use and transportation setting for the site and its surrounding
area. This section shall include the following four subsections:
[a] Site and study area boundaries. A brief description
of the size, location, general terrain features, proposed land uses,
construction staging and completion date of the proposed land development.
If the development is residential, types of dwelling units and number
of bedrooms shall be included. Also, the description shall include
probable socioeconomic characteristics of site users with respect
to transportation needs of the site (i.e., number of senior citizens).
[b] Existing and proposed site uses. The existing and
proposed uses of the site shall be identified in terms of type and
zoning classification category.
[c] Existing and proposed nearby uses. A complete description
of: the existing land uses in the vicinity of the site, as well as
their current zoning, proposed uses for adjacent land, other major
existing and proposed land development.
[d] Existing and proposed roadways and intersections.
The description shall contain full documentation of the proposed internal
and existing external transportation system. This description shall
include proposed internal vehicular bicycle and pedestrian circulation,
all proposed ingress and egress locations, all internal roadways (widths
and rights-of-way), parking conditions, traffic channelizations, and
any traffic signals or other intersection control devices at all intersections
within the site. Also, locations for all signing (i.e. speed limits,
etc.) shall be shown and verified. This subsection shall describe
the entire external roadway system within the study area. Major intersections
in the study area shall be identified and illustrated. All existing
and proposed public transportation services and facilities documented.
All future highway improvements within Silver Spring Township and
the study area, including proposed construction and traffic signalization,
shall be noted. Improvements from the Pennsylvania Department of Transportation's
twelve-year Highway and Bridge Program within Silver Spring Township
and the study area shall also be noted. Any proposed or in-place roadway
improvements due to proposed surrounding developments shall be noted.
[2]
Analysis of existing conditions. This section shall describe
the results of the volume/capacity analysis to be completed for the
roadways and intersections in the study area under existing conditions
as well as any data collection efforts that are required. This section
shall include the following three subsections:
[a] Daily and peak hour volumes. Schematic diagrams
shall be presented depicting existing traffic volumes for average
daily traffic (ADT), the weekday peak highway traffic hour(s) and
peak development-generated hour(s), and the Saturday peak traffic
hour. All documentation must be contained in the report. Turning movement
and mainline volumes shall be presented for all peak hour conditions
(weekday a.m. peak, weekday p.m. peak, weekday site-generated and
Saturday peak); while only mainline volumes are required for ADT,
source and method of computation must be included.
[b] Volume/capacity analysis at critical points. A
volume/capacity analysis based upon existing volumes shall be performed
during the weekday and Saturday peak traffic hour(s) and the peak
development-generated hour(s) for all roadways and major intersections
in the study area.
[c] Levels of service at critical points. Based on the results obtained in the previous section, levels of service are to be determined and presented as in the definition in Subsection
E(6)(b).
[3]
Analysis of future conditions without the proposed development.
This section shall describe the anticipated traffic volumes in the
future and the ability of the roadway network to accommodate this
traffic without the proposed development. The future year(s) for which
projections are made shall be development completion year unless reported
otherwise by the Silver Spring Township Board of Supervisors. Factors
included within this section include, but are not limited to, background
traffic growth expansion and traffic generated by other proposed developments
as well as associated improvements. This section shall include the
following three subsections:
[a] Daily and peak-hour traffic volumes. This section
shall clearly indicate the method and assumptions used to forecast
future volumes in order that Township personnel can duplicate these
calculations. The schematic diagrams depicting future volumes shall
be similar for those described previously in Subsection E(6)(c)[2][a]
in terms of location and times (daily and peak hours).
[b] Volume/capacity analysis at critical points. The
ability of the roadway system to accommodate future traffic (without
the proposed development) is to be described in this section. If roadway
improvements or modifications are committed for implementation, the
volume/capacity analysis should be presented for these conditions.
Periods of analysis shall be presented for these conditions. Periods
of analysis shall be the same as those previously performed in Subsection
E(6)(c)[2][b].
[c] Levels of service at critical points. Based on the results obtained in the previous section, levels of service are to be determined and presented as in the definition in Subsection
E(6)(b).
[4]
Trip generation. The estimation of vehicular trips to result
from the proposed development shall be completed for average weekday,
average Saturday, peak traffic hours during the weekday a.m. and p.m.
peak traffic hours, the weekday peak development generated hour and
the Saturday peak traffic hour. These development-generated traffic
volumes shall be provided for the in-bound and out-bound traffic movements
as estimated, and the reference source(s) and methodology followed
shall be documented. Any characteristics of the site which may cause
particular trip-generation problems shall be noted.
[5]
Trip distribution. The direction of approach for site-generated
traffic will be presented in this section for the appropriate time
periods. As with all technical analysis steps, the basic method and
assumptions used in this work must be clearly stated in order that
Township officials may replicate these results.
[6]
Traffic assignment. This section describes the utilization of study area roadways by site-generated traffic. The proposed traffic volumes shall be combined with anticipated traffic volumes – from Subsection
E(6)(c)[3].
[7]
Analysis of future conditions within the proposed development.
This section describes, in the below three subsections, the adequacy
of the roadway system to accommodate future traffic with development
of the site.
[a] Daily and peak-hour traffic volumes. Mainline and
turning movement volumes shall be presented, in schematic form, for
the highway network in the study area as well as driveways and internal
circulation roadways for the appropriate time periods (identified
previously).
[b] Volume/capacity analysis at critical points. Similar
to Subsection E(6)(c)[2][b] and [3][b], a volume/capacity analysis
shall be performed for the appropriate peak hours for future conditions
with the site developed as proposed.
[c] Levels of service at critical points. Based upon
the results obtained in the previous section, levels of service are
to be determined and presented as in Subsection E(6)(c)[2][c] and
[3][c].
[8]
Recommended improvements. A description of proposed improvements to remedy deficiencies shall be included in this section. Improvements shall be identified which would replace capacity and/or return predevelopment levels of service conditions. Alternative improvement schemes shall be presented for post-development traffic volumes to operate at a minimum level-of-service D, or in no circumstances at a level of service worse than predevelopment condition. These recommendations shall separately identify committed projects of governmental agencies which were described and independently identified in Subsection
E(6)(c) and reflected in the analysis contained in Subsection
E(6)(c)[2] and
[3]. This section shall include the following three subsections:
[a] Proposed recommended improvements. This section
should describe the location, nature and extent of proposed improvements
to assure sufficient detail. The listing of recommended improvements
shall include, but not be limited to, the following elements: internal
circulation design, speed limit, stop and no-parking sign locations,
site access location and design, external roadway and intersection
design and improvements and traffic signal installation and operation
including phasing and timing. All physical roadway improvements shall
be shown in sketches. This listing shall also include, for each improvement:
preliminary cost estimates, funding source, timing and likelihood
of the improvement implementation and the party responsible for the
improvement.
[b] Volume/capacity analysis at critical points. Another
iteration of the volume/capacity analysis shall be presented and described
which demonstrates the anticipated results of making recommended improvements.
[c] Levels of service at critical points. Based on
the results obtained in the previous section, levels of service for
the study area with improvements shall be presented.
[9]
Conclusion. The last section of the report shall be a clear
concise description of the findings. It is anticipated that this concluding
section should serve as an executive summary.
(d)
Time of submission. The traffic impact report shall be submitted
to the Township with the preliminary plan application. An application
for preliminary plan approval shall be deemed incomplete and unacceptable
for filing if the traffic study is not included in the submission,
and the time period for approval of such plans pursuant to Section
508 of the Pennsylvania Municipalities Planning Code, 53 P.S. § 10508,
shall not commence until the report is received by the Township. The
design plans for street improvements shall not be submitted to the
Pennsylvania Department of Transportation until the plans have been
reviewed by the Silver Spring Township Planning Commission, the Silver
Spring Township Engineer, and approved by the Silver Spring Township
Board of Supervisors. The submittal to PennDOT shall be accompanied
by the comments of Silver Spring Township.
(e)
Implementation. The Silver Spring Township Planning Commission,
Engineer and Board of Supervisors shall review the traffic impact
report to analyze its adequacy in solving any traffic problems that
may occur due to the development. If the report of the Township Engineer,
in reviewing the traffic study of the developer, makes additional
recommendations or recommendations different from that of the traffic
consultant of the developer, then the Board of Supervisors may require
these added improvements to be completed by and at the cost of the
developer, and those added improvements may be attached to the overall
land development or subdivision approval as conditions to approval.
The Silver Spring Township Board of Supervisors may decide that certain
improvements contained in the report, within the study area, are mandatory
for development and may attach these as conditions to the approval.
(f)
Waivers. The Board of Supervisors of Silver Spring Township may waive or modify, in whole or in part, the requirement for a traffic impact report or any of the requirements and standards set forth in Subsection
E(6)(c) of this section if literal enforcement will exact undue hardship because of peculiar conditions pertaining to the land in question, provided that such waiver or modification will not be contrary to the public interest and that the purpose and interest of this article be observed. In considering any waiver or modification, the Board of Supervisors may consider, in its discretion, but are not limited to considering, such factors as the location of the subject property, its proximity to intersections and major roadways, the size and density of the proposed subdivision or land development, the number and location of proposed accesses to the subject property and the nature of the use proposed.
(7) Park and recreation.
(a)
A park and recreation report for residential developments of
50 or more units. Said report shall include the following minimum
considerations:
[1]
A description of the total projected number of residents in
their respective age groups.
[2]
A description of those existing public recreation facilities
located within a one-half-mile radius of the site.
[3]
A description of the adequacy of existing recreation facilities
to serve the proposed residents, taking into consideration current
usage.
[4]
A discussion of potential for any recreation facilities to be
provided by the developer to accommodate new residents and/or compensate
for any anticipated deficiencies of the Township's recreational
facilities.
[5]
A description of any recreation facilities to be provided by
the developer.
[6]
A discussion on the relationship of the proposal to the prevailing
Township Park and Recreation Study.
[7]
A description of responsibility for maintenance of any recreational
facilities to be provided by the developer.
[8]
A description of accessibility of the proposed facilities to
general Township residents.
[9]
A description of any contributions in accordance with §
360-38 of this chapter that the developer plans to make for Township recreation to compensate for expected impacts.
[10] Source of standards used in the data presented.
(b)
The park and recreation report will be transmitted to the Township
Recreation Advisory Council for review.
(8) Archaeological resources. All applications involving lands identified
on the Silver Spring Township Comprehensive Plan's Natural and
Cultural Features Map by the Pennsylvania Historical and Museum Commission
(PHMC) as containing a potential or known site of archaeological significance
shall plot the location of the archaeological resource.
(9) Historical features.
(a)
All applications involving structures or lands that: are listed
on the National Register of Historic Places; receive a determination
of eligibility from the National Register from the National Park Service;
are listed on the Cumberland County Historical Society Register shall
be designed to preserve, adaptively reuse, or otherwise provide for
the historic features. Modifications and exterior alterations to historic
features or sites, or new construction adjacent to historic features,
shall be consistent with the Secretary of the Interior's Standards
for Rehabilitation of Historic Properties, as published by the National
Park Service.
(b)
Subdivisions and land developments shall also be designed so
that new structures do not block historic views or obstruct the view
of historic properties, and new construction shall be consistent with
the Secretary of the Interior's Guidelines. If, because of size,
construction material, or type of use, a proposed land development
or subdivision would jeopardize the historic value of a site or structure,
such new construction shall be screened or otherwise visually buffered.
(10)
Important natural habitats. All applications for lands that
possess an important natural habitat, as defined herein, shall plot
the location of the natural resources. Important natural habitat is
defined as follows:
(a)
Wetlands, as defined by criteria of the United States Department
of Interior, Fish and Wildlife Service; or
(b)
Pennsylvania Natural Diversity Inventory (PNDI) confirmed extant
plant and animal species and communities that are listed as "Pennsylvania
Threatened" or "Pennsylvania Endangered"; or
(c)
PNDI-confirmed extant plant and animal species and communities
that have a state rank of S1 or S2.
(11)
Carbonate assessment report.
(a)
All land developments and subdivisions required by this chapter
to provide a carbonate assessment report shall be evaluated by a licensed
professional civil engineer with expertise in geotechnical engineering
or a licensed professional geologist. Each of said experts will be
licensed in their field of expertise by the Commonwealth of Pennsylvania.
A list of the engineer's/geologist's qualifications shall be submitted
to the Township prior to the commencement of the site evaluation.
The Township reserves the right to reject any report that in its opinion
was authored by an individual or firm which does not possess the background
to properly assess the site conditions as they relate to this chapter.
Further, the carbonate assessment report submitted to the Township
must be signed by the licensed professional civil engineer with expertise
in geotechnical engineering and/or a licensed professional geologist.
(b)
The format and content of the carbonate assessment report shall
include, but not be limited to, the following:
[1]
Statement of purpose. This section shall indicate those standards
being addressed in the report and whether the applicant is attempting
to demonstrate compliance or justify noncompliance with those specific
standards.
[2]
Description of existing conditions. This section shall present
a description of existing characteristics of the property with respect
to geology, topography, groundwater and surface water hydrology, soils,
vegetation and existing improvements and uses of property.
[3]
A map, at a scale no smaller than one inch equals 100 feet and
a contour interval of two feet, indicating the location of the property
and all proposed improvements.
[4]
The developer/applicant shall submit information for the effected
properties, indicating the presence of any of the following carbonate
features: depressions, fissures, lineaments, faults, ghost lakes,
bedrock, outcrops, sinkholes, seasonal high-water levels, soil mottling,
springs, surface drainage entering the ground, disappearing lakes
or streams and caverns.
[5]
The professional shall prepare a map of the site showing all
Karst features or feature indicators. The mapping shall indicate,
but shall not be limited to, the following features: closed depressions,
open sinkholes, seasonal high-water table indicators, outcrops of
bedrock, unplowed areas in plowed fields, surface drainage into ground,
and ghost lakes after rainfall.
[6]
A recommended plan for the repair or remediation of surface
or subsurface features that may impact the proposed development as
well as the adjacent improved or unimproved properties.
[7]
The information requested above shall be based upon previously
published data and field surveys, which may include test boring, excavation
of test pits, air-track probes, and geophysical methods.
(c)
In addition to the carbonate assessment report, the developer
shall also be required to provide the following information:
[1]
A plan indicating the existing and proposed drainage conditions,
locations of all proposed private and public sewage disposal systems,
and the location of existing private and public water supplies on
adjoining properties (within 1,000 feet of applicant's property).
[2]
Type, location and phasing of proposed site disturbance and
construction, as well as proposed future ownership, utilization and
maintenance of the property and the proposed improvements.
[3]
Proposed measures to control potential adverse environmental
impacts on groundwater quality and stormwater management resulting
from the development and utilization of the property to include the
installation of a ground source heat pump system.
[4]
Plans describing the design and construction of the proposed
stormwater management facilities proposed for the project. A description
of the minimum requirements is outlined below.
(d)
The carbonate assessment report is recommended as part of the
concept plan process, but shall be required as part of the preliminary
or final plan process. Four copies of the report shall be submitted
to the Township. The report shall be reviewed by the Township Engineer
and other consultants as designated by the Township. The Township
may require additional information to be submitted if it concludes
that such information would be instrumental in assessing the proposed
development as it relates to this chapter.
(12)
Greenway land management plan. For subdivision and land development
applications requiring greenway land:
(a)
Using the preliminary plan as a base map, the boundaries, acreage
and proposed ownership of all proposed greenway land shall be shown,
including a plan containing the following information:
[1]
Proposed ownership, use restrictions, limitations on buildings
and improvements;
[2]
Necessary regular and periodic operation and maintenance tasks
and responsibilities for the various forms of greenway lands (i.e.,
lawns, playing fields, meadow, pasture, cropland, woodlands and other
greenway elements) including mowing, control of invasive species,
etc.;
[3]
Estimate of staffing needs, insurance requirements, and associated
costs, and defining the means for funding the maintenance of the greenway
land on an ongoing basis. Such funding plan shall include the means
for funding long-term capital improvements as well as regular yearly
operating, maintenance and capital reserve costs.
[4]
Such management plans shall be consistent with the requirements of §
415-30I of Chapter
415, Zoning, of this Code.
F. Certifications and notifications.
(1) Where the land included in the subject application has an electric
or telephone transmission line, a gas pipeline, or a petroleum or
petroleum products transmission line located within the tract, the
application shall be accompanied by a copy of the right-of-way agreement
or a letter from the owner or lessee of such right-of-way stating
any conditions on the use of the land and the minimum building setback
and/or right-of-way lines. This requirement may also be satisfied
by submitting a copy of the recorded agreement.
(2) A statement by the individual responsible for the data to the effect
that the survey, plan and/or other general data are correct (see Appendix
No. 1). This statement must be placed on both plans and reports.
(3) A statement acknowledging that the subdivision or land development
shown on the plan is presented with the consent of the landowner.
(4) A statement that a highway occupancy permit is required pursuant
to Section 420 of the Act of June 1, 1945 (P.L. 1242, No. 428), as amended, before any improvements
are initiated within a state highway, or a street, access drive, or
driveway intersection to a state highway is permitted.
(6) (Optional) A statement acknowledging Township action (see Appendix
Nos. 3 and 4).
G. Filing fee. The preliminary plan shall be accompanied by a check
or money order drawn to Silver Spring Township in an amount specified
on the fee schedule adopted by resolution of the Board of Supervisors
and available at the Township Building. Additionally, the applicant
shall provide the Township with the filing fee established by Cumberland
County for review by the County Planning Commission.
Final plans shall be prepared by an engineer, land surveyor
and/or landscape architect registered in the Commonwealth of Pennsylvania
to perform such duties. Metes and bounds descriptions shall be prepared
by land surveyors, and designs which entail engineering shall be prepared
by registered engineers with appropriate expertise. The final plan
shall show, be accompanied by, or be prepared in accordance with the
following:
A. Drafting standards. The same standards are required for a final plan as specified for a preliminary plan in §
360-14A, except that plans to be recorded shall be sized 18 inches by 24 inches.
B. Location and identification. The same standards are required for a final plan as specified for a preliminary plan in §
360-14B.
C. Existing features. The same standards are required for a final plan as specified for a preliminary plan in §
360-14C.
D. Proposed features. In addition to the following data, the same standards are required for a final plan as specified for a preliminary plan in §
360-14D.
(1) Complete description of the center line and right-of-way line for
all new and existing streets. This description shall include distances
and bearings with curve segments comprised of radius, tangent, arc
and chord. The description shall not have an error of closure greater
than one foot in 10,000 feet.
(2) Complete description of all lot lines, with accurate bearings and
distances, and lot areas for all parcels. Curve segments shall be
comprised of arc, chord, bearing and distance. Along existing street
rights-of-way, the description may utilize the existing deed lines
or road center lines. Along all proposed street rights-of-way, the
description shall be prepared to the right-of-way lines. The description
shall not have an error of closure greater than one foot in 10,000
feet.
(3) Locational dimensions for easements with sufficient detail to provide
easy on-site location. Easements which do not follow property lines
shall be located by a center-line metes and bounds description.
(4) Recorded easements for off-site utilities, access, and stormwater
facilities.
(5) For proposed buildings and other major structures, other than single-family
detached dwellings, the plans shall include information to tie two
opposing proposed points, such as building corners, to existing physical
features on the site. Each proposed point shall be tied to at least
two existing physical features. These requirements can be modified
or adjusted by the Township Engineer, as requested, to accommodate
actual field conditions.
E. Reports. The same standards are required for a final plan as specified for preliminary plan in §
360-14E. If the reports were submitted with the preliminary plan and the contents are unchanged, they may be submitted by reference as opposed to full text submission.
F. Certifications and notifications. In addition to the following data, the same standards are required for a final plan as specified for a preliminary plan in §
360-14F.
(1) A statement on the plan acknowledging final plan approval (see Appendix
No. 5). This statement must be placed on the first sheet of
plans which are subject to recording in the office of the Cumberland
County Recorder of Deeds.
(2) A statement on the plan acknowledging plan review by the Township
Planning Commission and Township Engineer (see Appendix No. 3). This statement must be placed on the first sheet of
plans which are subject to recording in the office of the Cumberland
County Recorder of Deeds.
(3) The submission of a notice from the Pennsylvania Department of Environmental
Protection that a sewer facilities plan revision, supplement, waiver
or exemption has been approved.
(4) A notarized statement on the plan signed by the landowner, duly acknowledged
before an officer authorized to take acknowledgment of deeds, to the
effect that the subdivision or land development shown on the plan
is the act and the deed of the owner, that all those signing are all
the owners of the property shown on the survey and plan, and that
they desire the same to be recorded (see Appendix No. 2). This must be dated following the last change or revision
to said plan.
(5) A statement on the plan of dedication of streets and other public
property as well as area that is not to be offered for dedication
(see Appendix No. 2).
(6) The submission of such written notices of approval as required by
this chapter, including written notices approving the street name,
encroachments along state routes, water supply systems, sanitary sewage
systems, and stormwater runoff to adjacent properties.
(7) A statement on the plan to accommodate the Cumberland County Recorder
of Deeds information (see Appendix No. 5).
(8) The submission of an improvement guarantee in accordance with Article
V.
(9) A statement on the plan that all public improvements will comply
with the latest edition of Township's Improvements Specifications
Manual.
(10)
The submission of an application.
(11)
The submission of an executed improvement guarantee agreement,
which sets forth the responsibilities of all parties regarding the
installation and inspection of the required improvements.
(12)
The submission of planned community documents and homeowners'
association documents to be reviewed and approved by the Township
Solicitor.
(13)
A statement on the plan that the development shall be constructed
in accordance with the plan and all applicable ordinances.
G. Filing fee. The final plan shall also be accompanied by a check or
money order drawn to Silver Spring Township in an amount specified
on the fee schedule adopted by resolution of the Board of Supervisors
and available at the Township Building. Additionally, the applicant
shall provide the Township with the filing fee established by Cumberland
County for review by the County Planning Commission.