[Ord. No. 5551, 10-30-2017; Ord. No. 5685, 3-23-2020]
A. This Chapter seeks to provide those standards, criteria, procedures, and controls necessary to avoid adverse effects and minimize the harmful physical and economic effects of flooding from stormwater within the City of Creve Coeur. This goal is to be accomplished through the requirements of special measures set forth in Stormwater Management Plans to mitigate by means of detention and controlled discharge of the differential runoff from a property (unless excepted from regulation hereunder) whereon any grading, excavation, filling, or other disturbance of the natural vegetation or any construction, erection, or alteration of a building or structure is to be undertaken. Erosion control requirements are specified in Chapter
420, Land Disturbance Code.
B. Design Standard. This Chapter adopts the Rules and Regulations and
Engineering Design Requirements for Sanitary Sewer and Stormwater
Drainage Facilities, dated February 2018, of the Metropolitan St.
Louis Sewer District (MSD) as the City's sanitary and stormwater design
standard. This document and its regulations shall be referenced herein
as "MSD Regulations." This Chapter may need to be revised in the event
that MSD changes their ordinance.
[Ord. No. 5551, 10-30-2017; Ord. No. 5685, 3-23-2020]
A. The provisions of this Chapter shall apply to all land disturbance permits (as defined in Section
420.020) and residential development permits issued by the City of Creve Coeur. This shall include, but not be limited to, all new homes, swimming pool additions, and detached garages, regardless of size or area of land disturbance. This shall also include any site improvement or building addition with a temporary or permanent land disturbance of two thousand (2,000) square feet or more.
B. Exceptions. The following activities and situations shall be exempt
from the requirements of this Chapter:
1.
Building permits for entirely interior work.
2.
Permitted development of any undeveloped lot of record of less
than one-fourth (1/4) acre existing as of January 1, 2017.
3.
The planting, trimming, pruning or removal of trees, shrubs,
grass, weeds, vegetation, ground cover or other plant material when
such actions are incidental to and part of the normal maintenance
of land and property in the City of Creve Coeur.
C. In considering the applicability of the exceptions listed above,
the effective acreage for a project, development, or subdivision is
not limited to a fractional part of the total concept. Rather, if
a project is developed in phases or small plats, the total acreage
of the project, development, or subdivision will be considered.
D. The Director of Public Works has the discretion to require that,
for any building permit, the applicant provide a grading plan, a siltation
control plan, and/or a Stormwater Management Plan.
[Ord. No. 5551, 10-30-2017]
A. Definition. No adverse effect shall mean that the proposed changes
to a property will not increase the volume, direction, velocity, or
intensity of stormwater runoff for adjoining properties for the design
storm.
B. Design Storm. For the purposes of determining "no adverse effect,"
the design storm shall be 15-year rainfall intensity for a duration
of twenty (20) minutes (15-year, 20-minute storm).
1.
Table 4-2 of the MSD Regulations lists specific stormwater runoff
rates for the design storm.
2.
The determination of the change to the site's stormwater runoff
rate will be based upon comparing the stormwater runoff rates in MSD's
Table 4-2 for the existing and proposed conditions of the site.
C. Site Grading. Sites shall be designed such that the proposed conditions
will not increase the volume or speed of stormwater runoff onto any
adjacent property.
1.
For subdivisions with stormwater detention or retention facilities
that are demonstrated by the applicant to have the capacity to accommodate
the site's differential stormwater runoff, the site's differential
stormwater runoff will be allowed to flow directly into these facilities
or directly into an enclosed system which flows into such a facility,
provided that no other properties are crossed in order to do so.
2.
For subdivisions without stormwater detention or retention facilities,
the differential stormwater runoff for a development will need to
be contained on site.
[Ord. No. 5551, 10-30-2017; Ord. No. 5685, 3-23-2020]
A. Stormwater Management Plan Required. Except as otherwise provided in Section
425.020, no permit shall be issued to construct, erect, or alter any building or structure or to clear, grade, excavate, fill, remove topsoil from, or otherwise change the contour of any property within the City until a Stormwater Management Plan has been submitted, approved, and recorded in accordance with the provisions of this Chapter.
1.
A Stormwater Management Plan shall be those documents, plans, calculations, and any other information necessary to demonstrate, to the satisfaction of the Director of Public Works, that the proposed work creates no adverse effect, as defined in Section
425.030.
2.
The amount of detail provided in the Stormwater Management Plan
will depend on the extent and nature of the project. At a minimum,
the Stormwater Management Plan will include contoured site plans,
details, and calculations that show the proposed improvements, the
pre-construction and post-construction runoff calculations for the
site, specifications and details regarding the proposed mitigation
method(s), and the location(s) of the stormwater mitigation on the
site.
B. Review Process. Designs, plans, and specifications of all drainage facilities, as defined in Section
425.120, that are proposed to be constructed, connected to, altered, or reconstructed by any person or corporation, private or public, within the City boundaries shall be submitted to the City and MSD for review, comment, and revision, leading to approval, approval with comments, or rejection. The design engineer shall meet with the Director of Public Works before starting stormwater facilities design to review the Stormwater Management Plan. The Stormwater Management Plan must be reviewed with the Director of Public Works before submittal to MSD. Such designs, plans and specifications (excluding house connections, curb cuts, or similar work as determined by the Director of Public Works) shall be prepared and sealed by a professional engineer registered in the State of Missouri and shall meet the minimum standards of the City, MSD, and the Missouri Department of Natural Resources before approval is granted.
C. Procedure.
1.
Preliminary Conferences. At any time prior to formal submission
of project plans, the owner's engineer may arrange for a preliminary
conference with the Director of Public Works to obtain informal guidance
in project plan preparation with the City. Preliminary conferences
are recommended for all permit applications, especially in unique
or unusual circumstances, but preliminary conferences are required
for land disturbance activities. The preliminary conference is intended
to expedite the subsequent formal review and approval process. This
includes review of the downstream areas jointly by the City and the
developer's engineer with photographs, online content, geographic
information system (GIS), and other pertinent information as determined
by the Director of Public Works.
2.
Application. When required, a Stormwater Management Plan shall
be included with the permit application for the proposed project to
the Director of Public Works by the owner of the land prior to the
time any work subject to this Chapter is begun on the land. Said plans
must accompany any such application, parts of which may also be on
forms prepared by the City.
3.
Approval Process. Upon receipt of any application and plan,
the Director of Public Works shall consider the plan in light of the
provisions of this Chapter and shall approve the plan, disapprove
the plan or approve the plan with modifications, noting thereon any
changes that will be required.
4.
Notification. The City shall promptly notify the applicant of
the City's decision on a plan. Such notification shall be within forty-five
(45) calendar days after the plan has been properly filed. Any approved
plan shall be issued, dated, and bear the manual signature of the
Director of Public Works or his/her designee.
5.
Site Development Plan Approval. A Stormwater Management Plan may, as required, be included in and made part of an application for site development plan approval in accordance with Section
405.1080 or of an application for approval of improvement plans for a subdivision in accordance with Chapter
410 of the Creve Coeur subdivision regulations.
6.
Upon approval, the owner shall provide proof that the Stormwater
Management Plan has been recorded with the St. Louis County Recorder
of Deeds.
7.
The Director of Public Works may waive the requirement to record the Stormwater Management Plan if the Director of Public Works determines that the Stormwater Management Plan sufficiently demonstrates that, without the need for any mitigation features, the proposed activities and site changes will cause no increase in stormwater runoff and no adverse effect, as defined in Section
425.030.
D. Downstream Conveyance System. For land disturbance activities, the
developer is required to evaluate the downstream conveyance system
where the connection is receiving the proposed development's runoff
in order to determine if it has the capacity to receive the proposed
development's runoff. The evaluation has to continue until the proposed
development's runoff is less than ten percent (10%) of the downstream
conveyance system. The Director of Public Works can request additional
studies further downstream if a stormwater problem is anticipated.
E. Corrective Action. If a development during or after construction
adversely affects downstream property, corrective action will be required
by the developer and/or landowner as determined by the Director of
Public Works. The development shall make the required study and repairs
during construction or after completion of the proposed development
according to the Stormwater Management Plan, as directed by the Director
of Public Works, if the stormwater-related problems downstream of
the development can be demonstrated to be caused by the development.
F. Time Of Validity.
1.
An approved Stormwater Management Plan shall become invalid
if the authorized work is not commenced within six (6) months after
issuance of the permit, if the authorized work is suspended or abandoned
for six (6) months, or if the project is not completed within one
(1) year after the issuance of the land disturbance or residential
development permit.
2.
An updated plan shall be subject to the provisions of this Chapter
in effect at the time of resubmission.
[Ord. No. 5551, 10-30-2017]
A. Refer to the MSD Regulations for full details regarding information
to be submitted to MSD for applicable land disturbance permits. Plan
review may be delayed if all required information is not provided
by the applicant.
B. To facilitate the review of plans before approval for construction,
the design engineer shall submit with the plans a Stormwater Management
Plan containing all necessary data, maps, computations, and checklists
as defined in the MSD Regulations in support of the designs and plans.
[Ord. No. 5551, 10-30-2017]
A. The developer will need to confirm with MSD whether MSD will accept
for dedication any sewers and pump stations within easements dedicated
to MSD that have been constructed to MSD standards and for which the
requirements stated herein have been met.
B. The maintenance of these facilities will remain the responsibility
of the project Owner and their successors in interest until such time
that they have been accepted for dedication by MSD.
[Ord. No. 5551, 10-30-2017]
Upon receipt of a written statement from the Owner that further
work on the project has been abandoned, or upon Owner's failure to
promptly complete work after notice of apparent abandonment, the City
and MSD shall determine whether or not the uncompleted work is required
to ensure the public health, safety and welfare. Should it be determined
that completion of the work is necessary, the Owner shall complete
such work immediately. Otherwise, the City may utilize the monies
deposited in the construction escrow for the project to complete this
work or seek other applicable remedies.
[Ord. No. 5551, 10-30-2017]
A. The City will require that certain fees be paid prior to the acceptance
of the plans for review or the subsequent approval of the project
plans. Failure to submit the fees in a timely manner could delay the
review and approval of the plans. No plans will be approved until
all required fees have been paid.
B. Because the amounts of these fees are subject to change, no amount
for these fees is given herein. Please contact the City and MSD for
a current list of fees. See Appendix B to Title IV — Community
Development and Public Works Fee Schedule for fees required by the
City for plan submittal and approval.
C. MSD may apply its own fees to the project proposal.
D. Recording Fees. The owner will be responsible for paying the recording
fees for all documents to be recorded with the Recorder of Deeds for
St. Louis County.
[Ord. No. 5551, 10-30-2017]
A corporate surety bond or cash escrow, conditioned upon carrying
out all and every part of approved plans for at least the sum estimated
to be the full costs of carrying out such plans, shall be furnished
to the City whenever such costs are estimated to exceed five hundred
dollars ($500.00). The bond or escrow shall be released upon proper
completion of all of the requirements of such approved plans.
[Ord. No. 5551, 10-30-2017]
A. Detention/retention facilities, when mandatory, are to be built in
conjunction with the storm sewer installation and/or grading. Since
these facilities are intended to control increased runoff, they must
be partially or fully operational soon after the clearing of the vegetation.
B. Silt and debris connected both with early construction and with general
erosion from the site and elsewhere in the watershed after construction
shall be removed periodically from the detention area and/or control
structure in order to maintain the facility close to its full storage
capacity.
C. The responsibility of maintenance of the detention/retention facilities
in subdivision projects shall remain with the developer until such
time as applicable escrows are released. Upon release of escrows the
maintenance responsibility for facilities on common ground shall be
vested jointly and severally in the trustees of the subdivision by
virtue of the trust indenture and the owners of the subdivision lots
and their successors in interest. The indenture of the trust should
clearly indicate resident responsibility for maintenance in cases
of projects without common ground, but the absence of such a provision
shall not eliminate such responsibility.
D. The responsibility of maintenance of the detention/retention facilities
in single owner development projects shall remain with the general
contractor until final inspection of the development is performed
and approved and a legal occupancy permit is issued. After legal occupancy
of the project, the maintenance of detention/retention facilities
shall be vested with the owner of the lot and their successors.
[Ord. No. 5551, 10-30-2017; Ord. No. 5685, 3-23-2020]
A. Enforcement. This Chapter shall be enforced by the Director of Public
Works. The construction, reconstruction and/or alteration of buildings
shall not be undertaken and the development of land shall not be commenced
except in accordance with the provisions of this Chapter, as applicable.
No permit or application for the construction or alteration of buildings
and/or land shall be approved if the project would be in violation
of this Chapter.
The Director of Public Works is authorized to institute any
appropriate actions or proceedings to prevent, halt, or correct construction
or maintenance that is found to be in violation of this Chapter.
B. Notice Of Violation And Sanctions. If the Director of Public Works
finds that any of the provisions of this Chapter are being violated
in the completion and/or maintenance of a Stormwater Management Plan,
he/she shall notify in writing the person(s) responsible for such
violation, indicating the nature of the violation and ordering the
action necessary to correct it. The Director of Public Works shall
take any other action authorized by law to ensure compliance with
or to prevent violation of the provisions of this Chapter.
C. Violations. Violations of this Chapter shall include, but are not
limited to, the following:
1.
The alteration or construction of buildings and/or land not
in accordance with the provisions of this Chapter.
2.
Failure to obtain the necessary approvals as required by this
Chapter.
3.
Failure to maintain the approved and recorded Stormwater Management
Plan for the property.
D. Persons Liable For Violation. Those chargeable, singly or jointly,
with violations of this Chapter shall include, but shall not be limited
to, the following:
1.
Those who commit, assist in, or otherwise participate in a violation.
2.
The owner or other persons who maintain the building, premises,
property, or other place where the violation has been committed exists.
3.
The owner's agent or person in charge of the building, premises,
property or other place where the violation has been committed or
exists.
4.
The developer, engineer, architect, contractor, subcontractor,
or any other person who performs work or enters into a contract for
work in violation of this Chapter.
E. Violations And Penalties.
1.
In case any building, structure, or land is erected, constructed,
reconstructed, altered, converted, maintained, or used in violation
of this Chapter, or of any ordinance or other regulation made under
authority conferred by Sections 89.010 to 89.140, RSMo., the proper
local authorities of the City, in addition to other remedies, may
institute any appropriate action or proceedings to prevent such unlawful
erection, construction, reconstruction, alteration, conversion, maintenance,
or use, to restrain, correct, or abate such violation, to prevent
the occupancy of such building, structure, or land, or to prevent
any illegal act, conduct, business, or use in or about such premises.
Such regulations shall be enforced by an officer empowered to cause
any building, structure, place or premises to be inspected and examined
and to order in writing the remedying of any condition found to exist
therein or thereat in violation of any provision of the regulations
made under authority of Sections 89.010 to 89.140, RSMo.
2.
The owner or general agent of a building or premises where a violation of any provision of said regulations has been committed or shall exist, or other persons or parties liable for said violation, as indicated in Section
425.110(D) shall be guilty of an ordinance violation punishable by a fine of not less than ten dollars ($10.00) and not more than five hundred dollars ($500.00) for each and every day that such violation continues, or by both such fine and imprisonment in the discretion of the court. Notwithstanding the provisions of Section 82.300, RSMo., however, for the second and subsequent offenses involving the same violation at the same building or premises, the punishment shall be a fine of not less than two hundred fifty dollars ($250.00) or more than one thousand dollars ($1,000.00) for each and every day that such violation shall continue or by imprisonment for ten (10) days for each and every day such violation shall continue, or by both such fine and imprisonment in the discretion of the court.
3.
Any such person who having been served with an order to remove
any such violation shall fail to comply with such order within ten
(10) days after such service or shall continue to violate any provision
of the regulations made under authority of Sections 89.010 to 89.140,
RSMo., in the respect named in such order shall also be subject to
a civil penalty of two hundred fifty dollars ($250.00).
[Ord. No. 5551, 10-30-2017]
In addition to words and terms that may be defined elsewhere
in this Chapter, the following words and terms shall have the meanings
defined below:
CHANNELS
A natural or artificial watercourse.
CITY
The City of Creve Coeur.
DEVELOPED RUNOFF RATE
The peak flow corresponding to a selected rainfall event
as a result of developed site conditions.
DIFFERENTIAL VOLUME OF STORMWATER
The amount of differential stormwater volume between the
pre-developed and developed runoff rates which the detention basin
must detain (hold).
DRAINAGE FACILITY
Any system of artificially constructed drains, including
open channels and sewers, used to convey stormwater, surface or ground
water, either continuously or intermittently, to natural watercourses.
ENGINEER
A registered professional engineer currently certified by
law in the State of Missouri.
IMPERVIOUS SURFACE
Materials through which no stormwater or only an incidental
amount of stormwater is able to pass. Examples of impervious surfaces
include, but are not limited to, building roofs, asphalt pavement,
and concrete pavement.
LAND DISTURBANCE
Clearing, grading, removal of improvements, or any other work that temporarily or permanently exposes the ground surface or subsurface to erosion. Section
420.020 includes additional discussion and definitions related to land disturbance.
MDNR
The Missouri Department of Natural Resources.
MSD
The Metropolitan St. Louis Sewer District.
OUTFALL
The point location or structure where wastewater or drainage
discharges.
PERSON
Any individual, firm, proprietorship, partnership, company,
municipality, association, society, corporation, group or other entity.
PRE-DEVELOPED RUNOFF RATE
The amount of flow from an existing site prior to new development
or improvements as computed by the Rational Formula.
PRIVATE FACILITIES
Any device, structure, or feature that has not been expressly
adopted for maintenance by the City of Creve Coeur, the Metropolitan
St. Louis Sewer District, or other municipal, County, State, or Federal
entity.
RATIONAL METHOD
A means to calculate flow quantities, by which:
Q = A * P * I
|
Where:
|
|
Q
|
=
|
runoff, in cubic feet per second
|
|
A
|
=
|
tributary area, in acres
|
|
P
|
=
|
runoff factor based upon runoff from pervious and impervious
surfaces
|
|
I
|
=
|
average intensity of rainfall, in inches per hour, for a given
period and a given frequency
|
The definition of these factors, including the tables used to
select the appropriate values, are outlined in Section 4.030 Stormwater
Design Criteria of the MSD Regulations.
|
RESIDENTIAL DEVELOPMENT PERMIT
A permit from the City of Creve Coeur that is required for any new home (including "tear-down/rebuild" homes), home addition, garage, or swimming pool on residential property. This permit combines the applicable building permit(s) according to Section
500.040 and land disturbance permits according to Section
420.070. Fees for a Residential Development Permit are described in Appendix B to Title IV - Community Development and Public Works Fee Schedule.
RESOLUTION
A resolution duly adopted by the City Council of the City
of Creve Coeur.
RETENTION
A stormwater runoff facility designed to retain (hold) stormwater
both permanently and temporarily (above normal pool elevation) during
and immediately after a runoff event.
STORMWATER DETENTION
A stormwater runoff facility designed to detain (hold) stormwater
temporarily during and immediately after a runoff event.
STORMWATER MANAGEMENT PLAN
Study and design for a stormwater conveyance system, a downstream
evaluation system, detention requirements, floodplain/floodway, sink
hole and regulating permitting requirements.
SWALE
A broad, shallow watercourse.
TIME OF CONCENTRATION
Consists of inlet time plus the travel time in the sewer
or channel from the most remote point in the watershed to the point
under consideration.
TRAVEL TIME
The time it takes for the runoff to flow through the drainage
system from one point of reference to the next point of reference.
U.S.G.S.
United States Geological Survey.
WATERCOURSE
A stream of water or a natural channel through which water
may flow.