The Director of Public Works may from time to time determine
where sidewalks shall be constructed and establish the width, determine
the materials, prescribe the methods of construction of standard sidewalks
and set the standards for different streets.
No public sidewalks shall hereafter be constructed without first
obtaining a permit from the Village. The application for a permit
shall be made in writing upon a form furnished by the Village Clerk.
Upon the laying of a sidewalk, the permit holder shall notify
the Director of Public Works or Building Inspector, who shall inspect
the sidewalk to determine whether it conforms with the requirements
of the permit. If the sidewalk does not conform, the Director of Public
Works shall order the work to be removed and replaced in accordance
with specifications on file with the Village Clerk within 20 days
after the service of a written notice ordering such removal. If the
owner refuses to replace such construction within 20 days after the
service of the notice therefor, the Village may perform the work and
assess the cost of such work against the owner.