Type of Service
|
Fee
| |
---|---|---|
Minimum fee R3/R5
|
$65
| |
Minimum fee all other uses and commercial
|
$105
| |
New construction, including additions, per cubic foot of volume
|
$0.045
| |
Minimum fee for any new principal structure R5
|
$1,200
| |
Minimum fee for any new accessory structure R5
|
$150
| |
Minimum fee for additions 120 square feet or less R5
|
$250
| |
Minimum fee for additions greater than 120 square feet R5
|
$350
| |
Modular structures: per $1,000 of cost
|
$30
| |
Renovations, alterations and repairs
| ||
Up to first $50,000 in cost per $1,000
|
$27
| |
From $50,001 to $100,000 in cost per $1,000
|
$25
| |
Over $100,001 in cost per $1,000
|
$24
| |
Demolition
| ||
R5 use group complete
|
$250
| |
All other use groups complete
|
$700
| |
Interior demolition all use groups
|
$150
| |
Garage or accessory building demolition all use groups
|
$250
| |
Fuel storage tanks, removal or abandon
| ||
Up to 275 gallons
|
$75
| |
276 to 1,000 gallons
|
$125
| |
Each additional 500 gallons
|
$50
| |
Moving a building
| ||
Per $1,000 of estimated cost of work
|
$25
| |
Asbestos abatement with administrative certificate
|
$175
| |
Lead hazard abatement with certificate of clearance
|
$195
| |
Swimming pools, building permit only
| ||
Aboveground pools
|
$150
| |
In-ground pools, per $1,000 of estimated cost
|
$25
| |
Sheds, per $1,000 of estimated cost
|
$24
| |
House and construction trailers, each
|
$150
| |
Tents, over 900 square feet or 30 feet of length in one direction
|
$110
| |
Retaining walls, 4 feet or more in height, per $1,000 of estimated
cost
|
$24
| |
Signs per square foot
|
$3
| |
Certificate of occupancy: U.C.C.
| ||
Residential (new construction or rehabilitation)
|
$100
| |
Nonresidential
|
10% of permit fee
| |
Certificate of continued occupancy: U.C.C., applicant requested
| ||
General visual inspection by all Subcode Officials: per subcode
|
$100
| |
Temporary certificate of occupancy
| ||
Initial issuance
|
No fee
| |
Subsequent renewals, each
|
$35
| |
Plan review: nonrefundable percentage of permit fee
|
20%
| |
Change of contractor: plus any additional items or cost
|
$35
| |
Withdrawn permit, administrative fee: percentage of permit fee
|
30%
| |
Reinstatement of lapsed permit fee: percentage of original permit
fee
|
80%
| |
Permit surcharge (state mandated)
|
See N.J.A.C. 5:23-4.19(b)
| |
Variation application as per N.J.A.C. 5:23-2.10
| ||
Class I structures
|
$550
| |
Class II and III structures
|
$200
| |
Resubmission: Class I structures
|
$200
| |
Resubmission: Class II and III
|
$100
|
Special inspection fee request: Any request for a required code
inspection either before or after regular Building Department hours
of business or on holidays and weekends shall be required to pay,
in addition to any established permit and certificate fees, the current
contractual hourly compensation rate (one and one half times their
normal hourly salary) based on the amount of time required for said
inspection with a two-hour minimum.
|
Type of Service
|
Fee
| ||
---|---|---|---|
Minimum fee R3/R5
|
$65
| ||
All other uses and commercial
|
$105
| ||
Electrical devices (lighting outlets, receptacles, switches,
smoke and heat detectors, emergency lights, exit lights, communication
points and fire alarm devices
| |||
1 to 20 devices
|
$65
| ||
Each additional 20 devices
|
$30
| ||
Dishwasher, disposal unit, instant hot (each)
|
$45
| ||
Temporary trailers (each) plus the service
|
$60
| ||
Motors (all except those in plug-in appliances)
| |||
1 to 10 horsepower
|
$50
| ||
11 to 50 horsepower
|
$100
| ||
51 to 100 horsepower
|
$175
| ||
Greater than 100 horsepower
|
$450
| ||
Transformer/generator/appliance equipment/ovens, ranges, warming
trays
| |||
1 to 10 kilowatt
|
$40
| ||
11 to 45 kilowatt
|
$65
| ||
46 to 112.5 kilowatt
|
$105
| ||
Over 112.5 kilowatt
|
$455
| ||
Service entrance, panel, subpanel or disconnect (each)
| |||
Up to 100 amps
|
$85
| ||
101 to 200 amps
|
$105
| ||
201 to 400 amps
|
$205
| ||
401 to 1,200 amps
|
$500
| ||
Over 1,201 amps
|
$750
| ||
Additional meters included in service
|
$35
| ||
Air-conditioning units (includes disconnect, compressor/condenser
air handler) each
|
$100
| ||
Replacement of any system part
|
$60
| ||
Burglar alarm system (complete)
|
$75
| ||
Swimming pools (includes receptacle, switch, trench, bonding
and equippotential bonding matt)
|
$180
| ||
Hydromassage tub (interior)
|
$45
| ||
Hot tub, spa (exterior) same as a pool
|
$180
| ||
Certificate of compliance, annual inspection for public swimming
pools, spas and hot tubs
|
$100
| ||
Photovoltaic Systems
| |||
Solar modules
| |||
1 to 20 modules
|
$65
| ||
Each additional 20 modules
|
$35
| ||
1 to 10 KW
|
$65
| ||
11 to 50 KW
|
$95
| ||
51 to 100 KW
|
$125
| ||
Greater than 100 KW
|
$580
| ||
Disconnects and invertors
| |||
Up to 100 amps (each)
|
$85
| ||
101 to 200 amps (each)
|
$105
|
Type of Service
|
Fee
|
---|---|
Elevator subcode fees
|
80% of state fees and subject to change by the state pursuant
to N.J.A.C. 5:23-12.6 plus 25% administrative fee
|
Elevator plan review shall be in accordance with N.J.A.C. 5:23-4.20
(6 and 7)
|
Type of Service
|
Fee
| |
---|---|---|
Minimum fee R3/R5
|
$65
| |
All other uses and commercial
|
$105
| |
Sprinkler systems, each
| ||
Pipe schedule
|
$75
| |
Hydraulically calculated
|
$75
| |
R5 use group, 20 or fewer heads
|
$65
| |
Sprinkler system heads, all other use groups
| ||
1 to 20 heads
|
$82
| |
21 to 100 heads
|
$152
| |
101 to 200 heads
|
$289
| |
201 to 400 heads
|
$750
| |
401 to 1,000 heads
|
$1,036
| |
Over 1,000 heads
|
$1,775
| |
Sprinkler system supervisory devices (tamper switches low/high),
each
|
$20
| |
Standpipes, each
|
$289
| |
Dry pipe/alarm valves, each
|
$60
| |
Preaction valves, each
|
$150
| |
Water service for a fire line
|
$150
| |
Fire alarm systems
| ||
Control panels, R5 use group, each
|
$65
| |
Control panels, all other use groups, each
|
$85
| |
Fire alarm system devices (i.e., smoke detector heads, heat
detector heads, pull stations, water flow alarms)
| ||
1 to 20 devices
|
$65
| |
21 to 100 devices
|
$130
| |
101 to 200 devices
|
$310
| |
201 to 400 devices
|
$650
| |
401 to 1,000 devices
|
$850
| |
Over 1,000 devices
|
$1,200
| |
Fire alarm panel, new installation or replacement
|
$100
| |
Fire alarm system security devices (door locks, electromagnetic
releases), each
|
$30
| |
Fire alarm system signaling devices (i.e., horns, strobes, bells)
each
|
$8
| |
Independent preengineered systems, each
| ||
Wet chemical system
|
$200
| |
All other systems
|
$250
| |
Gas- or oil-fired appliances, each
| ||
R5 use group
|
$65
| |
All other use groups
|
$85
| |
Fireplaces
|
$75
| |
Metal chimney liner
| ||
Residential
|
$75
| |
Commercial
|
$125
| |
Exhaust systems, each
| ||
Commercial kitchen hood
|
$200
| |
Smoke control system
|
$350
| |
Incinerators, crematorium, each
|
$375
| |
Fuel storage tanks: installation, each
| ||
Up to 275 gallons
|
$75
| |
276 to 1,000 gallons
|
$100
| |
1,001 gallons to 5,000 gallons
|
$250
| |
Over 5,000 gallons
|
$500
| |
Fire pump, each
|
$350
| |
Water service for fire line
| ||
Up to 2 inch
|
$100
| |
2 1/2 inch to 5 inch
|
$200
| |
6 inch or larger
|
$300
|
Type of Service
|
Fee
| |
---|---|---|
Minimum fee R3/R5
|
$65
| |
All other uses and commercial
|
$105
| |
Fixtures (i.e., lavatories, kitchen sinks, basins, urinals,
water closets, bathtubs, shower stalls, sill cocks, laundry tubs,
floor drains, drinking fountains, dishwashers, garbage disposals,
clothes washers and similar devices, each
|
$25
| |
Stacks, each
|
$45
| |
Special devices (i.e., grease traps, oil separators, refrigeration
units, utility service connections, backflow preventers, gas service
interceptors, and fuel oil piping), each
|
$75
| |
Utilization equipment (i.e., steam boilers, hot-water boilers,
warm-air furnaces), each
| ||
R5 use group
|
$65
| |
All other use groups
|
$95
| |
Air-conditioning units, each
| ||
R5 use group
|
$65
| |
All other use groups
|
$75
| |
Water heaters, each
| ||
R5 use group
|
$70
| |
All other use groups
|
$100
| |
Gas piping, each
| ||
R5 use group
|
$65
| |
All other use groups
|
$75
| |
Vapor recovery systems, each
|
$100
| |
Required annual reinspections (i.e., cross connections, backflow
preventers)
|
$100
| |
Medical gas piping, per outlet
|
$25
| |
Annual testing of backflow preventers
| ||
1 to 4 devices
|
$75 per device
| |
5 or more devices
|
$60 per device
|
Type of Service
|
Fee
| |
---|---|---|
(A)
|
Minimum fee (R3/R5)
|
$85
|
(B)
|
Mechanical review for R-3/R-5
|
$65
|
(C)
|
Replacement: furnaces, boilers, A/C and HVAC units
|
$85 per unit replaced
|
Rooftop HVAC units
|
$140 per unit replaced
| |
(D)
|
Installation of above- or underground fuel storage tanks for
R-3/R-5
| |
Up to 275 gallons
|
$75 per unit
| |
276 to 1,000 gallons
|
$100 per unit
| |
(E)
|
Fuel oil or gas piping connections for R-3/R-5
|
$65 per unit
|
(F)
|
New installations: fireplaces, solid-fuel stoves, boilers, furnaces,
A/C, HVAC, generators, chimneys and chimney relinings for R-3/R-5
|
$85 per unit
|
(G)
|
Each additional unit over the initial (Lines C, D, E, F, from
above)
|
$40 per unit
|
Activity or Occupation
|
Fee
| |
---|---|---|
Antique shop
|
$100
| |
Auto body shop
|
$175
| |
Auto repair shop
|
$175
| |
Bakery
|
$120
| |
Beauty salon
|
$100
| |
Business from home
|
$100
| |
Butcher shop
|
$150
| |
Cabins and motels
|
$2,500 per premises and $16 per separate unit
| |
Car wash
|
$300
| |
Coin-operated machines or games (excluding amusement
machines):
| ||
Food and beverage
|
$25 for each machine
| |
Gum ball machines, novelties
|
$25 per machine
| |
Jukebox
|
$25 for each
| |
Kiddie rides
|
$25 for each
| |
Laminating machine
|
$30 per machine
| |
Vacuum cleaner
|
$25
| |
Concert
|
$50
| |
Dry cleaners
|
$100
| |
Entertainment
|
$360
| |
For a single day or days
|
$25 per day
| |
Garage sale
|
$5
| |
Gas station
|
$120, plus $25 per pump
| |
General merchandise
|
$100
| |
Grocery store
|
$120
| |
Limousine service
|
$50
| |
Milk trucks
|
$160
| |
Mobile vendors
|
$160
| |
Motor vehicle authorization letter
|
$25
| |
Movie theater
|
$300
| |
New car dealer
|
$360
| |
Parking lots
|
$420
| |
Restaurant, lunchroom or diner
|
$125
| |
Theater
|
$610
| |
Used car dealer
|
$360
| |
Cannabis establishments
[Added 12-27-2021 by Ord. No. 2021-16] |
$35,000 per class of license
|
Zoning Permit
|
Fee
|
---|---|
(includes review for use and/or development)
| |
Initial (residential) owner-occupied
|
$25
|
Initial (residential) non-owner-occupied
|
$75
|
Initial (commercial)
|
$75
|
Amended application, each
|
$25
|
Sign applications
|
$75
|
Certificate for any rental unit
|
$50
|
Certificate for resale or rental of a commercial property (CCO)
|
$200
|
Reinspection of any residential unit
|
$25
|
Reinspection of any commercial unit
|
$50
|