This chapter shall be known and referred to as the "Stormwater
Control Ordinance of the Township of Montague, Sussex County, New
Jersey."
Flood control, groundwater recharge, and pollutant reduction
shall be achieved through the use of stormwater management measures,
including green infrastructure best management practices (GI BMPs)
and nonstructural stormwater management strategies. GI BMPs and low-impact
development (LID) should be utilized to meet the goal of maintaining
natural hydrology to reduce stormwater runoff volume, reduce erosion,
encourage infiltration and groundwater recharge, and reduce pollution.
GI BMPs and LID should be developed based upon physical site conditions
and the origin, nature and the anticipated quantity, or amount, of
potential pollutants. Multiple stormwater management BMPs may be necessary
to achieve the established performance standards for water quality,
quantity, and groundwater recharge.
The purpose of this chapter is to establish minimum stormwater management requirements and controls for "major development," as defined below in §
56-6.
Development approvals issued pursuant to this chapter are to
be considered an integral part of development approvals and do not
relieve the applicant of the responsibility to secure required permits
or approvals for activities regulated by any other applicable code,
rule, act, or ordinance. In their interpretation and application,
the provisions of this chapter shall be held to be the minimum requirements
for the promotion of the public health, safety, and general welfare.
This chapter is not intended to interfere with, abrogate, or annul
any other ordinances, rule or regulation, statute, or other provision
of law except that, where any provision of this chapter imposes restrictions
different from those imposed by any other ordinance, rule or regulation,
or other provision of law, the more restrictive provisions or higher
standards shall control.