[HISTORY: Adopted by the Mayor and Council
of the Borough of Sea Bright as indicated in article histories. Amendments
noted where applicable.]
[Adopted 1-25-1977]
A.Â
Establishment. A State Uniform Construction Code enforcing
agency is hereby established, consisting of a Construction Official,
Building Subcode Official, Plumbing Subcode Official, Electrical Subcode
Official, Fire Subcode Official and such other subcode officials for
such addition subcodes as the Commissioner of the Department of Community
Affairs, State of New Jersey, shall hereafter adopt as part of the
State Uniform Construction Code. The Construction Official shall be
the chief administrator of the enforcing agency.
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. II)]
B.Â
Qualifications. Each official position created in Subsection A shall be filled by a person qualified for such position pursuant to P.L. 1975, c. 217,[1] as amended and N.J.A.C. 5:23, provided that in lieu of
any particular subcode official, an on-site inspection agency may
be retained by contract pursuant to N.J.A.C. 5:23. The same person
may hold more than one such official position, provided that such
person is qualified pursuant to P.L. 1975, c. 217, and N.J.A.C. 5:23
to hold each position.
[1]
Editor's Note: See now N.J.S.A. 52:27D-119
et seq.
C.Â
Location of office. The public shall have the right
to do business with the enforcing agency at one office location, except
for emergencies and unforeseen and unavoidable circumstances. Said
location shall be at the office of the Construction Official, Borough
Hall, 1167 Ocean Avenue, Sea Bright, New Jersey 07760.
[Amended 3-8-1977]
All appeals from the decisions of the enforcing
agency shall be taken to the Board of Appeals established by the County
of Monmouth.
[Amended 5-7-1996 by Ord. No. 36-96; 6-1-1999 by Ord. No. 104-99; 9-7-1999 by Ord. No. 116-99; 4-17-2001 by Ord. No. 7-01; 10-21-2003 by Ord. No. 16-2003; 10-7-2008 by Ord. No. 8-2008]
A.Â
Minimum fee for building permits: $45.
B.Â
Plan review fee shall be 20% of the amount to be charged
for a new construction permit. Plan review fees are not refundable.
There shall be an additional fee of $45 per hour for review of any
amendment or change to a plan that has already been released.
C.Â
The basic construction fee shall be the sum of all
parts computed on a basis of the volume or the cost of construction
plus $10, and the number of plumbing fixtures and devices plus $10,
and the number of electrical fixtures and devices, plus $10, and the
number of sprinklers, stand pipes, heat and smoke detectors and all
other fire fixtures and devices at the unit rates provided herein
plus $10 and any special fees.
[Amended 9-17-2013 by Ord. No. 15-2013]
D.Â
New construction based on the volume of the structure.
The new construction fee for all use groups shall be $.027 per cubic
foot.
E.Â
Additions. The fees for additions shall be computed
on the same basis as for new construction for the added portion.
F.Â
Renovations, alterations and repairs.
(1)Â
The fee for all use groups shall be:
Estimated Cost
|
Fee
|
---|---|
First $50,000
|
$24 per thousand
|
$50,001 to and including $100,000
|
$18 per thousand
|
Above $100,000
|
$15 per each additional thousand
|
(2)Â
The applicant shall submit to the Construction Official
such data as may be available to provide a bona fide estimated cost.
The Construction Official shall make the final decision regarding
estimated cost.
H.Â
Roofing and siding fees: as per alteration fee.
I.Â
Plumbing fees:
Type
|
Fee
|
---|---|
Minimum fee for plumbing permits
|
$45
|
Fixtures and appliances connected to or components
of a plumbing system
|
$15 per fixture/appliance
|
Waste/vent stacks
|
$15 each
|
Special devices, including, but not limited
to, grease traps, separators, interceptors, air conditioning units,
refrigeration units, sewer connections, water service connections,
backflow preventors, sewer pumps and fuel oil piping
|
$65 per device
|
Steam/hot-water boilers
|
$45 each
|
Gas-piping service
|
$45 per system
|
Appliances added to a gas-piping system
|
$15 per appliance
|
Hot-water heaters
|
$45 each
|
J.Â
Fire protection fees.
Type
|
Fee
| |
---|---|---|
Fire permits, minimum fee
|
$45
| |
Alarm devices (heat, pulls, water flow, smoke,
CO)
| ||
5 or less
|
$45
| |
Each additional 15
|
$30
| |
Supervisory devices (tampers, low/high air)
or signaling devices (horns/strobes bells)
| ||
5 or less
|
$45
| |
Each additional 15
|
$30
| |
Sprinkler heads (wet or dry):
| ||
10 or fewer
|
$65
| |
11 to 100
|
$120
| |
101 to 200
|
$250
| |
201 to 400
|
$600
| |
401 to 600
|
$1,000
| |
Standpipes
|
$150 each
| |
Kitchen exhaust systems (commercial)
|
$65 each
| |
Independent preengineered systems (CO2, Halon,
foam, wet or dry chemical, etc.)
|
$65 each
| |
All fireplaces (wood or gas)
|
$45 each
| |
Gas and oil-fired appliances
|
$45 each
| |
Tank installation
| ||
Up to 550 gallons of water capacity
|
$45 each
| |
Over 550 gallons of water capacity
|
$75 each
| |
Incinerators
|
$260 each
| |
Crematoriums
|
$260 each
| |
Alarm panel
|
$50 each
| |
Fire pumps
|
$200 each
| |
Preaction valves
|
$45 each
| |
Dry pipe/alarm valve
|
$25 each
| |
Smoke-control systems
|
$65 each
|
K.Â
Electrical fees.
Type
|
Fee
| ||
---|---|---|---|
Electrical permits, minimum fee
|
$45
| ||
Switching, lighting and receptacle (devices
of less than one horsepower or one kilowatt included)
| |||
One to 50
|
$55
| ||
Each additional 25
|
$15
| ||
Service panels, entrances and subpanels
| |||
Each service panel, entrance or subpanel
| |||
Up to 200 amperes
|
$65
| ||
Up to 1,000 amperes
|
$100
| ||
Larger than above
|
$400
| ||
Transformers and generators
| |||
Up to 10 kilowatts
|
$45
| ||
Up to 45 kilowatts
|
$65
| ||
Up to 112.5 kilowatts
|
$125
| ||
Larger than above
|
$500
| ||
Motors and electrical devices (control equipment,
heating, air handling, compressor, heat pump, air handler, strip heater,
water heater, dryer, oven, range, furnace and dishwasher)
| |||
Up to 10 horsepower
|
$45
| ||
Up to 50 horsepower
|
$60
| ||
Up to 100 horsepower
|
$125
| ||
Larger than above
|
$450
| ||
Feeders
| |||
First 100 amperes
|
$45
| ||
Each additional 100 amperes
|
$10
| ||
Annual electrical inspection fee for bonding
and grounding certificates for public swimming pools, spas and hot
tubs
|
$75
|
L.Â
Furnace and air conditioner replacement.
Type
|
Fee
|
---|---|
Furnace replacement: electric, fire and plumbing
|
$45
|
Air conditioner compressor replacement for electric
and plumbing
|
$45
|
M.Â
Decks: as per alteration fee.
N.Â
Swimming pool installation.
Type
|
Fee
|
---|---|
Installation of an aboveground pool more than
18 inches deep or more than 750 gallons in capacity (R-3, R-4)
|
$75
|
Installation of a private in-ground pool more
than 18 inches deep or more than 750 gallons in capacity (R-3, R-4)
|
$150
|
Installation of a public in-ground or aboveground
pool
|
$250
|
O.Â
Construction of accessory and storage structures.
Type
|
Fee
|
---|---|
Construction or installation of a pool cabana
or similar accessory structure up to 100 square feet
|
$45
|
Construction of accessory storage sheds, pool
cabana or similar accessory structures over 100 square feet
|
$75
|
P.Â
Demolition and removal of structures.
Type
|
Fee
| |
---|---|---|
Demolition or removal of a structure less than
5,000 square feet in area and less than 30 feet in height for one-
and two-family residences (R-3 and R-4) and structures on farms under
N.J.A.C. 5:23-3.2(d)
|
$75
| |
Demolition of farm outbuildings and minor accessory
structures (Use Group U)
|
$45
| |
Demolition of all other buildings, structures
and use groups
|
$200
| |
Removal of buildings and structures from one
lot to another lot or to a new location on the same lot
| ||
First $1,000 of estimated cost
|
$20
| |
Each additional $1,000 of cost or part thereof
|
$15
| |
Estimated cost shall be the sum of the following:
the estimated cost of moving, plus the cost of the new foundations
and all work necessary to place the building or structure in its completed
condition in the new location
|
Q.Â
Demolition or removal of tanks.
Type
|
Fee
|
---|---|
Demolition or removal of tanks up to 1,000
|
$75 per tank
|
Demolition or removal of tanks above 1,000
|
$200 per tank
|
R.Â
Satellite dishes and radio transceiver equipment.
Type
|
Fee
|
---|---|
Installation of a satellite dish, radio, television
or other transceiver equipment for residential use
|
$45
|
Installation of a satellite dish, radio, television
or other transceiver equipment for nonresidential or commercial use
|
$200
|
S.Â
New fence: $45. Permit is not required for fences
six feet or less in height. This exception does not apply to pool
barriers
T.Â
Asbestos hazard abatement.
Type
|
Fee
|
---|---|
Asbestos hazard abatement for each construction
permit issued
|
$70
|
U.Â
Lead abatement.
Type
|
Fee
|
---|---|
Lead hazard abatement
|
$70
|
V.Â
Tents.
Type
|
Fee
|
---|---|
Tents without appurtenances in excess of 900
square feet or more than 30 feet in any dimension excluding canopies
|
$100
|
W.Â
Signs. The fee to construct a sign shall be in the
amount of $3 per square foot of surface area of the sign, computed
on one side only for double-faced signs. No construction permit is
required for signs under 25 square feet.
X.Â
Temporary structure. The permit fee for a temporary
structure used in the course of construction or other activities whose
life is limited to not more than one year shall be $100.
Y.Â
Certificate of occupancy.
[Amended 9-17-2013 by Ord. No. 15-2013]
Type
|
Fee
| |
---|---|---|
New construction/additions/tenant fix up
|
$120
| |
Change in use group
|
$120
| |
Continuation under N.J.A.C. 5:23-2.23(c)
|
$140
| |
Temporary certificate of occupancy
| ||
First issuance and renewal
|
$28
| |
Exception for the first issuance, provided the
certificate of occupancy fee is paid at that time
|
No fee
|
Z.Â
Variation. The fee for an application for a variation
in accordance with N.J.A.C. 5:23-2.10 shall be $450 for Class I structures
and $75 for Class II and Class III structures. The fee for resubmission
of an application for a variation shall be $229 for Class I structures
and $45 for Class II and Class III structures.
AA.Â
Waiver of building permit fees.
(1)Â
No person shall be charged a construction permit surcharge
fee or enforcing agency fee for any construction, reconstruction,
alteration or improvement designed and undertaken solely to promote
accessibility by disabled persons to an existing private structure
or any of the facilities contained therein.
(2)Â
A disabled person or a parent, sibling or child of
a disabled person shall not be required to pay a municipal fee or
charge in order to secure a construction permit for any construction,
reconstruction, alteration or improvement designed and/or undertaken
solely to promote accessibility to his or her living unit.
(3)Â
"Disabled person" shall mean any person who meets
the requirements as set forth in the definition of N.J.S.A. 52:27D-126e
and N.J.S.A. 40:55D-8 as the same may be amended from time to time.
BB.Â
Elevators: Department of Community Affairs. See N.J.A.C.
5:23-4.20, Department fees.
[Amended 10-21-2003 by Ord. No. 16-2003]
The Construction Official shall, with the advice
of the subcode officials, prepare and submit to the Borough Council,
biannually, a report recommending a fee schedule based on the operating
expenses of the agency and other expenses of the municipality attributable
to the enforcement of the State Uniform Construction Code Act and
subcodes.
[Amended 12-15-1998 by Ord. No. 94-98; 4-17-2001 by Ord. No. 7-01; 12-3-2002 by Ord. No. 16-02; 10-21-2003 by Ord. No. 16-2003; 4-7-2009 by Ord. No. 7-2009]
The State of New Jersey permit surcharge fees shall be charged in accordance with those provided under the New Jersey Administrative Code, Chapter 23, Uniform Construction Code (N.J.A.C. 5:23-4.19).
The fire limits of the Borough of Sea Bright
are hereby established as follows: all portions of the Borough of
Sea Bright included in the several zoning districts designated as
"B-1, B-2, B-3 Business Zones" and all nonconforming uses as approved
by the Zoning Board of Adjustment. The Construction Official shall
prepare and submit to the Borough Council biannually a report reevaluating
the delineation of the fire limits.
[Amended at time of adoption of Code (see Ch. 1, General
Provisions, Art. II)]
After the foundations are complete, the location of same must be approved by the Construction Official before further construction proceeds. No approval of the foundation of a building or structure shall be given by the Construction Official unless and until an accurate survey showing the actual physical location of such foundation on the lot shall have been presented to and filed with the Construction Official and found by him to conform in all respects to the requirements and provisions of Chapter 130, Land Use, and/or any conditions of the Planning Board applicable thereto. All location surveys shall be made by a licensed land surveyor of the State of New Jersey and shall bear his signature and seal and this surveyor shall install permanent corner markers on the lot.