[Added 12-12-2023 by Ord.
No. 9341]
Where subdivisions or additions are platted so that the rear
yards of residential lots are adjacent to a dedicated roadway or separated
from a roadway by an alley or service road, the owner shall provide
screening at his sole expense. A screening plan, including elevations
and materials, shall be submitted with the preliminary plat. All forms
of screening shall conform to the requirements of the ordinances of
the City governing the sight distance for traffic safety and other
City ordinances. Additional right-of-way or easements may be required
for wider columns and more elaborate screening walls.
The following procedure is required by the City of El Reno in
order to accept, for operation and maintenance, public facilities
constructed in compliance with approved plans and specifications for
subdivisions developed pursuant to these regulations. If more than
one of the following items are submitted for consideration at the
same time, all may be combined in one single letter. All submittals
are to be made to the City Clerk, City Hall, El Reno, Oklahoma.
A. Sanitary sewer.
(1) A letter from the developer addressed to the City
Council describing the location, stating the construction costs, submitting
a copy of certified "as built" plans executed by the developer's engineer
and requesting acceptance for operation and maintenance of the utility
by the City of El Reno.
(2) A letter of recommendation from the developer's engineer,
addressed to the City Council, stating that construction was performed
in full compliance with approved plans and specifications.
(3) A maintenance bond from the developer's contractor
to the City of El Reno, as hereinabove provided for.
B. Street pavement.
(1) A letter from the developer, addressed to the City
Council, describing the location, stating the construction costs,
submitting a copy of certified "as built" plans executed by the developer's
engineer and requesting acceptance for operation and maintenance of
the utility by the City of El Reno.
(2) A letter of recommendation from the developer's engineer,
addressed to the City Council, stating that construction was performed
in full compliance with approved plans and specifications.
(3) A maintenance bond from the developer's contractor
to the City of El Reno, as hereinabove provided for.
C. Water main.
(1) A letter from the developer, addressed to the City
Council, requesting acceptance for operation and maintenance of the
utility by the City of El Reno.
(2) If the installation of the system was performed by
the City Water Department, no additional information is necessary.
(3) A maintenance bond from the developer's contractor
to the City of El Reno, as hereinabove provided for.