Maintenance of erosion control structures and
measures, including but not limited to silt fences, straw bale berms,
and sediment traps, shall be the responsibility of the landowner.
Through staking or other means, the landowner
shall identify the location of protected wetlands and drainageways
on the project site.
Encroachment of equipment or earth-moving activities
onto wetlands shall be prohibited.
A certificate or authorization for activities
in protected wetlands and drainageways shall be prominently displayed
at the project site. The owner shall display the certificate or authorization
continuously while authorized activities are conducted and for 10
days following completion. The owner shall allow Township representatives
to enter and inspect the premises at any reasonable time, and failure
to allow inspections shall constitute a violation of this chapter.