*Consumption Unit
|
2023 Rate
|
2024 Rate
|
---|---|---|
Residential
| ||
0 to 10 cu
|
$3.44
|
$3.53
|
11 to 50 cu
|
$2.70
|
$2.81
|
51 to 100 cu
|
$3.67
|
$3.82
|
101 to 300 cu
|
$5.24
|
$5.45
|
301 and above
|
$6.03
|
$6.27
|
Four-way meters - Residential
| ||
0 to 40 cu
|
$3.44
|
$3.53
|
41 to 200 cu
|
$2.70
|
$2.81
|
201 to 400 cu
|
$3.67
|
$3.82
|
401 to 1,200
|
$5.24
|
$5.45
|
1,201 and above
|
$6.03
|
$6.27
|
Commercial
| ||
0 to 10 cu
|
$5.17
|
$5.30
|
11 to 50 cu
|
$2.70
|
$2.81
|
51 to 600 cu
|
$3.67
|
$3.82
|
600 to 901 cu
|
$5.24
|
$5.45
|
901 and above
|
$6.03
|
$6.27
|
Four-way meters - Commercial
| ||
0 to 40 cu
|
$5.17
|
$5.30
|
41 to 200 cu
|
$2.70
|
$2.81
|
201 to 400 cu
|
$3.67
|
$3.82
|
401 to 1,200
|
$5.24
|
$5.45
|
1,201 and above
|
$6.03
|
$6.27
|
Minimum bill - residential
|
$34.40
|
$35.30
|
Minimum bill - commercial
|
$51.70
|
$53
|
Minimum bill - four-way meter - Residential
|
$137.60
|
$141.20
|
Minimum bill - four-way meter - Commerical
|
$206.80
|
$212
|
*
|
Consumption unit: 1 cu=100 cubic feet=748 gallons
|
Service
|
2023 Rate
|
2024 Rate
|
---|---|---|
Inspection of all main and service line construction, repairs
and testing
|
$740 per day; $92 per hour or fraction thereof
|
$740 per day; $92 per hour or fraction thereof
|
Tapping of main, construction of service line (10 feet maximum,
market price thereafter)
| ||
Street opening permit, excavates and backfills
| ||
Meter provided by Borough of Florham Park
|
$336
|
$336
|
Borough of Florham Park inspects
|
$740 per day; $92 per hour or fraction thereof
|
$740 per day; $92 per hour or fraction thereof
|
All 3/4-inch and 1-inch service; owner gets street
opening permit, excavates and backfills
|
$1,554
|
$1,554
|
Meter provided by Borough of Florham Park
|
$462
|
$462
|
Borough of Florham Park inspects
|
$740 per day; $92 per hour or fraction thereof
|
$740 per day; $92 per hour or fraction thereof
|
All 1 1/4-inch service; owner gets street opening
permit, excavates and backfills
|
$2,045
|
$2,045
|
Borough of Florham Park inspects
|
$740 per day; $92 per hour or fraction thereof
|
$740 per day; $92 per hour or fraction thereof
|
All 1 1/2-inch service; owner gets street opening
permit, excavates and backfills
|
$2,171
|
$2,171
|
Meter provided by Borough of Florham Park
|
$767
|
$767
|
Borough of Florham Park inspects
|
$740 per day; $92 per hour or fraction thereof
|
$740 per day; $92 per hour or fraction thereof
|
All 2-inch service; owner gets street opening permit,
excavates and backfills
|
$2,332
|
$2,332
|
Meter provided by Borough of Florham Park
|
$1,022
|
$1,022
|
Borough of Florham Park inspects
|
$740 per day; $92 per hour or fraction thereof
|
$740 per day; $92 per hour or fraction thereof
|
*Larger services (owner gets permit, furnishes meter
and all material, excavates and backfills)
| ||
Borough of Florham Park inspection
|
$740 per day; $92 per hour or fraction thereof
|
$740 per day; $92 per hour or fraction thereof
|
*Work may be done by the builder with a permit from the Borough
of Florham Park Water Department.
| ||
Connection fee
| ||
Residential service unit
|
$1,510
| |
Equivalent service unit
|
$1,510
| |
50% or more demolition/tear down/alteration
|
$755
| |
Couplings
|
$20 each
| |
Temporary service.
| ||
Fee for temporary service (per dwelling) plus a
monthly fee of $30
|
$252
|
$252
|
Business and industrial (per building) plus a monthly
fee of $100
|
$504
|
$504
|
Resetting, repairing or replacement of curb box, including all
materials and labor
|
$756
|
$756
|
Shut off or turn on of service:
| ||
Business hours
|
$58.80
|
$58.80
|
After hours
|
$200 for first 4 hours; $45 per hour thereafter
|
$200 for first 4 hours; $45 per hour thereafter
|
Sundays and holidays
|
$200 for first 4 hours; $45 per hour thereafter
|
$200 for first 4 hours; $45 per hour thereafter
|
Meter test
|
$42
|
$42
|
Penalty for late bill (30 days overdue)
|
$34.40
|
$34.40
|
Hydrant maintenance inspection (flushing)
|
$92.40
|
$92.40
|
Painting and flushing of private hydrants
|
Responsibility of owner
| |
Hydrant use permit
|
$588
|
$588
|
Fee for temporary water service from fire hydrant (8 hours)
|
$840
|
$840
|
Service
|
2023 Fee
(per quarter)
|
2024 Fee
(per quarter)
|
---|---|---|
Each hydrant
|
$36
|
$36
|
Sprinkler service, 2 inches at building line
|
$30
|
$30
|
Sprinkler service, 3 inches at building line
|
$42
|
$42
|
Sprinkler service, 4 inches at building line
|
$60
|
$60
|
Sprinkler service, 6 inches at building line
|
$72
|
$72
|
Sprinkler service, 8 inches at building line
|
$102
|
$102
|
Gross Floor Area
(square feet)
|
2018 Rate
|
2020 Rate
|
---|---|---|
0 to 1,000
|
$66
|
$92.40
|
1,001 to 2,000
|
$66
|
$92.40
|
2,001 to 3,000
|
$66
|
$92.40
|
3,001 to 4,000
|
$66
|
$92.40
|
4,001 to 5,000
|
$66
|
$92.40
|
5,001 to 6,000
|
$66
|
$92.40
|
6,001 to 7,000
|
$72
|
$100.80
|
7,001 to 8,000
|
$78
|
$109.20
|
8,001 to 9,000
|
$84
|
$117.60
|
9,001 to 10,000
|
$90
|
$126
|
10,001 to 11,000
|
$96
|
$134.40
|
11,001 to 12,000
|
$108
|
$151.20
|
12,001 to 15,000
|
$150
|
$210
|
15,001 to 20,000
|
$162
|
$226.80
|
20,001 to 25,000
|
$198
|
$277.20
|
25,001 to 30,000
|
$234
|
$327.60
|
30,001 to 35,000
|
$270
|
$378
|
35,001 to 40,000
|
$276
|
$386.40
|
40,001 to 45,000
|
$336
|
$470.40
|
45,001 to 50,000
|
$372
|
$520.80
|
50,001 to 55,000
|
$402
|
$562.80
|
55,001 to 60,000
|
$414
|
$579.60
|
60,001 to 65,000
|
$474
|
$663.60
|
65,001 to 70,000
|
$486
|
$680.40
|
70,001 to 75,000
|
$540
|
$756
|
75,001 to 80,000
|
$552
|
$772.80
|
80,001 to 85,000
|
$612
|
$856.80
|
85,001 to 90,000
|
$648
|
$907.20
|
90,001 to 95,000
|
$678
|
$949.20
|
95,001 to 100,000
|
$714
|
$999.60
|
For each 5,000 square feet or part over 100,000 square feet,
there will be charged an additional $50.
|