For any proposed development, the developer shall submit
a stormwater management plan or waiver application to the Town Engineer for
review and approval, unless otherwise exempted. The stormwater management
plan shall contain supporting computations, drawings, and sufficient information
describing the manner, location, and type of measures in which stormwater
runoff will be managed from the entire development. The Town Engineer shall
review the plan to determine compliance with the requirements of this chapter
prior to approval. The plan shall serve as the basis for all subsequent construction.