Chapter/Type of Application
|
Fee
| |||
---|---|---|---|---|
Animals
| ||||
License fees and redemption fees
|
As required by the Town of Brookhaven
| |||
Excavations
| ||||
Article I, Soil, Sand and Gravel Removal
| ||||
Removing or displacing sand, soil and/or gravel
|
$75
| |||
Article II, Street Openings and Grade Changes
| ||||
Opening, changing the grade of or excavating streets
|
$75
| |||
Bell hole
|
$75 each
| |||
Trenching
| ||||
Up to 250 feet
|
$1 per foot
| |||
Each additional foot over 250 feet
|
$0.50 per foot
| |||
Records
| ||||
Copies of records
|
$0.75 per copy
| |||
Subdivision of Land
| ||||
Application for resubdivision (lot line modification)
|
$500
| |||
Hawking, Peddling, and Soliciting
| ||||
Solicitation license
|
$25
| |||
Land Clearing, Tree Preservation and Grading
| ||||
Article II, Trees
| ||||
Tree permit
|
$0
| |||
Zoning
| ||||
Building permit
| ||||
Building permit fees are established by the
Village Building Inspector and assessed at the discretion of the Building
Inspector and assessed at the discretion of the Building Inspector
and shall include new buildings, alterations of existing buildings,
tennis courts, decks, docks, swimming pools and porches. Estimated
or contract construction costs shall be based on present-day average
figures, as verified and approved by the Building Inspector. Minimum
construction cost is $200 per square foot for new construction and
$100 per square foot for interior redesigns, conversions, decks and
porches, which fees shall be assessed at the discretion of the Building
Inspector
|
1/2 of 1% of the total cost of all construction
| |||
Swimming pools
| ||||
Installation and erection of pool and fence
|
$175
| |||
Change of plans
| ||||
Prior to issuance of approved building permit
(applies to all structures)
|
$100
| |||
After issuance of building permit
|
$250 plus 1/2 of 1% of the total cost of all
construction (above and beyond 1st permit)
| |||
Refund due to cancellation of plans
| ||||
Prior to issuance of approved building permit
(applies to all structures)
|
$100
| |||
Subsequent to issuance of building permit
|
No refund
| |||
Construction of any structure prior to issuance
of a building permit
|
$750, plus appropriate permit fee
| |||
Appeal to validate building or structure
|
$500, plus appropriate permit fee
| |||
Appeal to validate swimming pool
|
$250, plus appropriate permit fee
| |||
Certificate of occupancy
|
$75
| |||
Certificate of occupancy and/or certificate of use, issued under
an expired building permit
|
$1,000 within the first 2 years of expiration and $100 each
year thereafter
| |||
Copies of certificates of occupancy and existing
use
| ||||
Building structures
| ||||
Less than 5 years old
|
$25
| |||
5 years or older
|
$50
| |||
Preexisting dwellings
|
$75
| |||
Surveys, underwriters' certificates and miscellaneous
|
$5
| |||
Appeal or application to Board of Appeals
|
$250
| |||
Special inspections
|
$125
| |||
Special use permits
|
As established by the Board of Trustees; maximum:
$250
| |||
Renewal of permits
| ||||
No change in plans
|
Full permit fee (one-year renewal)
| |||
Application for site plan review
|
$500
| |||
Consultant fees: Any time the Planning Board, Board of Trustees
and/or the Building Inspector deem it necessary to retain a consultant
to provide advice, recommendations or a professional opinion in connection
with an application as established by the employee or board
|
In accordance with professional rate; not to exceed $2,500 without
Board authorization
|