Every bulkhead must be located along the lot line of the owner
or on his adjacent upland property. No bulkhead shall be constructed
in the water of Macy Channel, Georges Creek, Hewlett Bay or in any
tidal waters adjoining the same outside of such property line.
Every bulkhead hereafter constructed or altered shall comply
with the code established by the Department of Conservation and Waterways
of the Town of Hempstead.
No bulkhead shall be constructed in the village unless a permit
therefor has previously been applied for and issued. The provisions
of the Building Zone Ordinance relating to applications for a building
permit, the issuance of a building permit, the issuance of a certificate
of occupancy and other administrative provisions shall apply to the
construction of a bulkhead. The construction of the bulkhead shall be inspected and
supervised by a New York State — licensed professional
engineer, who shall submit a certificate of compliance with the approved
plans.
Every bulkhead heretofore or hereafter constructed in the village
shall be kept and maintained by the owner in good repair and condition
in accordance with the standards set forth for original construction
of bulkheads in this chapter. When the sheathing to be replaced on
an existing bulkhead exceeds 10% of the width of the existing bulkhead,
a building permit shall be required in accordance with the provisions
of this chapter.