Application for temporary water and sewer service during construction
shall be made by the general contractor or owner of the premises at
the office of the Director of Public Works.
[Amended by Ord. No. 1987-8]
A permit fee of $25 shall be paid at the time of issuance of
permit. In addition, the general contractor or owner of the premises
shall deposit with the Borough Treasurer the sum of $100 to cover
meter damage and water use charges.
Upon issuance of permit, the Director of Public Works shall
issue a work order to activate the service.
[Added by Ord. No. 147-67]
At the conclusion of the construction project, the general contractor
or the owner shall apply to the Director of Public Works for a construction
service shutoff order. Upon inspection of premises and issuance of
same, copy shall be delivered to the Borough Treasurer, who shall
return the deposit of $50, less any amount due Borough for meter damage
and any outstanding water and sewer bills due.