No person shall excavate or otherwise remove soil or earth for
sale or use other than on the premises from which the soil or earth
shall be taken in connection with the construction or alteration of
a building on such premises, and excavation or grading incidental
thereto, without first having procured permission therefor from the
Mayor and Council of the Borough of Clayton.
The Mayor and Council of the Borough of Clayton shall not consider
any application for removal of soil or earth from the premises, for
sale or otherwise, unless and until the owner of the premises shall
first file with the Borough Clerk an application requesting such permission,
together with a map of the premises showing the contour lines and
proposed contour lines and proposed contour grades resulting from
such intended removal of soil or earth in relation to the topography
of the premises. Said proposed contour lines and proposed grades shall
be subject to the inspection and approval of the Mayor and Council
of the Borough of Clayton. No such permission for soil or earth removal
shall be issued until such map has been approved by the Mayor and
Council of the Borough of Clayton.
If permission to remove the soil shall be granted, the owner
or person in charge shall so conduct the operations that there shall
be no sharp declivities, pits or depressions and in such a manner
that the area shall be properly leveled off, cleared of debris and
graded to conform to the contour lines and grades as approved by the
Mayor and Borough Council of the Borough of Clayton.
All applications for preliminary or final, if no application
is made for preliminary, subdivision approval shall be accompanied
by an application for a soil removal permit pursuant to the terms
hereof, which permit, if granted, shall be conditioned upon final
approval of the subdivision.
Any person, firm or corporation violating any of the provisions of this chapter shall be subject to the penalty provided in Chapter
1, General Provisions, Article
I, Enforcement; General Penalty, §
1-2, Maximum penalty. Each and every violation and nonconformance of this chapter or each day that any provision of this chapter shall have been violated shall be construed as a separate and distinct violation thereof.