The standards and requirements for minimizing soil erosion and
sedimentation are found in the Erosion and Sedimentation Pollution
Control Ordinance, as amended from time to time.
The standards and requirements for stormwater drainage controls
are found in any stormwater management ordinance, as amended from
time to time.
The following general working conditions shall apply to all
development sites:
A. Dust control. During grading, excavation, and/or fill operations
necessary measures for dust control, including without limitation
water spray, shall be utilized.
B. Cleanup. All soil washed or carried onto any public or private roads
during grading operations shall be cleaned up each day. Temporary
driveway or road surfaces shall be provided as soon as possible. The
owner of the property being graded, excavated, and/or filled shall
be responsible to protect and clean up lower properties of silt and
debris which have washed down onto the lower properties as a result
of the grading, excavation, and/or fill in a reasonable period of
time.